RINCIANRINCIAN BILL OF QUANTITY (BoQ)INSTANSI:INSTITUT SENI INDONESIA YOGYAKARTAPEKERJAAN:PERENCANAAN PEMBANGUNAN PRASARANA LINGKUNGAN ISI YOGYAKARTALOKASI:ISI YOGYAKARTATAHUN:2013NOURAIAN PEKERJAANVOLUMEHARGA SATUANJUMLAH HARGAFAKULTAS SENI MEDIA REKAM (FSMR)APEKERJAAN PERSIAPAN1Pek. Pengukuran & Pemasangan Bowplank1.00ls0.00.02Membuat Papan Nama Proyek 80x120 cm (bahan flexi)1.00bh0.00.03Kantor Direksi Keet dan Gudang1.00ls0.00.0SUB JUMLAH0.01PEKERJAAN TALUD DAN PAGARAPEKERJAAN TANAH DAN URUGAN1Mengerjakan galian tanah33.88m30.00.02Mengurug pasir urug13.55m30.00.0BPEKERJAAN PASANGAN1Memasang pondasi batu belah, campuran 1 PC : 5 PP108.40m30.00.02Memasang dinding Batako, campuran spesi 1 PC : 6 PP660.00m20.00.0CPEKERJAAN BETON1Pekerjaan Sloof 15 /20cm10.80m30.00.02Pekerjaan Kolom 15/15 cm4.96m30.00.03Pekerjaan Ring Balk 15/20 cm10.80m30.00.04Rabat Beton9.00m30.00.0SUB JUMLAH0.02PEKERJAAN PENGGANTIAN PINTU DAN JENDELA POS SATPAMAPEKERJAAN PINTU DAN JENDELA1Mengerjakan pekerjaan kusen dan daun pintu PJ1.00bh0.00.02Mengerjakan pekerjaan kusen dan daun jendela J13.00bh0.00.03Mengerjakan pekerjaan kusen dan daun jendela J21.00bh0.00.04Mengerjakan pekerjaan kusen dan Pintu Alumunium2.00bh0.00.0SUB JUMLAH0.03PEKERJAAN PORTALAPEKERJAAN BONGKARAN1Pembongkaran Portal yang lama1.00ls0.00.0BPEKERJAAN PASANGAN1Mengerjakan Pembuatan Portal1.00unit0.00.0SUB JUMLAH0.04PARKIRAN FOTOGRAFI(UTARA)APEKERJAAN TANAH DAN URUGAN1Mengerjakan galian pondasi menerus36.92m30.00.02Mengurug pasir dasar pondasi menerus2.31m30.00.0BPEKERJAAN PASANGAN1Membuat lantai kerja beton mutu fc = 7,4 MPa Pondasi Menerus2.31m30.00.02Memasang pondasi batu belah, campuran 1 PC : 5 PP37.38m30.00.03Memasang plesteran 1 PC : 3 PP, tebal 15 mm64.61m20.00.04Pekerjaan Acian64.61m20.00.05Memasang finishing siar pasangan batu kali adukan 1 PC : 2 PP42.00m20.00.0CAREA PARKIRc.1PEKERJAAN BONGKARAN1Pembersihan Lapangan dan Perataan1.00ls0.00.0c.2PEKERJAAN TANAH DAN URUGAN1Mengerjakan galian pondasi menerus10.08m30.00.02Urug kembali Galian2.40m30.00.03Mengurug pasir dasar pondasi menerus1.12m30.00.0c.4PEKERJAAN PASANGAN1Membuat lantai kerja beton mutu fc = 7,4 MPa0.56m30.00.02Memasang pondasi batu belah, campuran 1 PC : 5 PP1.20m30.00.03Plat Beton t= 2010.00m30.00.04Kolom 40 x 402.24m30.00.05Stoper Ban 20 x 303.28m30.00.06Sloof 15 x 204.92m30.00.07Rabat Beton t= 10 cm16.80m30.00.08Pasang Conblock387.00m20.00.09Pasang Kansteen13.10ml0.00.010Rabat Beton1.23m30.00.011Pembuatan tutup SAH5.54m30.00.012Mengerjakan pekerjaan kerangka parkir Besi Galvanis1.00unit0.00.013Pasang Atap genteng bitumen sekualitas "Ondulline ", colour175.50m20.00.014Pasang Atap nok genteng bitumen sekualitas "Ondulline ", colour29.00ml0.00.015Pekerjaan Railling besi galvanis parkir FSMR1.00Unit0.00.016Pengecatan Bidang Besi 3 X171.10m20.00.0SUB JUMLAH0.0FAKULTAS SENI PERTUNJUKAN (FSP)1PEKERJAAN TUTUP SALURAN1Pekerjaan Bongkar pasangan Batu Kali20.10m20.00.02Pekerjaan Penutupan SAH A(Plat Beton)24.35m30.00.03Tutup SAH B0.86m30.00.04Tutup Sah Jalan Masuk Parkiran0.90m30.00.05Pekerjaan Pemasangan besi siku1.70Kg0.00.06Pekerjaan Pemasangan besi Pegangan16.62Kg0.00.07Pekerjaan Pemasangan Pipa PVC 2"27.30m10.00.0SUB JUMLAH0.02PENGGANTIAN DAN PENAMBAHAN CONBLOK1Pembersihan Lapangan dan Perataan80.600.00.02Pasang Conblok60.450.00.0SUB JUMLAH0.03PEMASANGAN CONBLOCK BARU(AREA PARKIR)1Pembersihan Lapangan dan Perataan1.00ls0.00.02Pasang Conblok465.000.00.0SUB JUMLAH0.04PENGGANTIAN CONBLOCK,KANSTEEN ,MULTIFUNGSIKAN SAH & PEMBUATAN AREA PARKIRAPENGGANTIAN CONBLOCK DAN KANS TEEN1Pembongkaran Conblock449.50m20.00.02Pemasangan Conblock553.50m20.00.03Pemasangan Kansteen151.00ml0.00.0BMULTIFUNGSIKAN SAH1Pembersihan SAH57.60m20.00.0CPEMBUATAN AREA PARKIR1Pembersihan Lapangan dan Perataan171.00m20.00.0DPEKERJAAN TANAH DAN URUGAN1Mengerjakan galian pondasi menerus6.05m30.00.02Urug kembali Galian1.44m30.00.03Mengurug pasir dasar pondasi menerus0.67m30.00.0EPEKERJAAN PASANGAN1Membuat lantai kerja beton mutu fc = 7,4 MPa0.34m30.00.02Memasang pondasi batu belah, campuran 1 PC : 5 PP0.72m30.00.03Plat Beton t= 206.00m30.00.04Kolom 40 x 401.34m30.00.05Sloof 15 x 203.66m30.00.06Rabat Beton t= 10 cm12.30m30.00.0FDINDING PENAHAN TANAHf.1PEKERJAAN TANAH DAN URUGAN1Mengerjakan galian pondasi menerus1.19m30.00.02Mengurug pasir dasar pondasi menerus0.40m30.00.0f.2PEKERJAAN PASANGAN1Membuat lantai kerja beton mutu fc = 7,4 MPa0.40m30.00.02Memasang pondasi batu belah, campuran 1 PC : 5 PP5.96m20.00.03Pekerjaan Plesteran0.46m20.00.04Pekerjaan Acian0.46m20.00.05Memasang finishing siar pasangan batu kali adukan 1 PC : 2 PP13.55m20.00.0f.3PEKERJAAN KERANGKA DAN ATAP PARKIR1Mengerjakan pekerjaan kerangka parkir Besi Galvanis1.00unit0.00.02Pasang Atap genteng bitumen sekualitas "Ondulline", colour156.00m20.00.03Pasang Atap nok genteng bitumen sekualitas "Ondulline ", colour26.00m10.00.04Pengecatan Bidang Besi 3 X218.39m20.00.0SUB JUMLAH0.05PARKIR FSPAPEMBERSIHAN LAPANGAN DAN PERATAAN1.00ls0.00.0BPEKERJAAN TANAH DAN URUGAN1Mengerjakan galian pondasi8.06m30.00.02Urug kembali Galian1.92m30.00.03Mengurug pasir dasar pondasi menerus0.90m30.00.0CPEKERJAAN PASANGAN1Membuat lantai kerja beton mutu fc = 7,4 MPa0.45m30.00.02Memasang pondasi batu belah, campuran 1 PC : 5 PP0.96m30.00.03Foot Plat8.00m30.00.04Kolom 40 x 401.79m30.00.05Sloof 15 x 204.47m30.00.06Rabat Beton t= 10 cm15.90m30.00.07Pasang conblock tipe segi-empat, uni, abu-abu 6 cm, K-225 tebal pasir 5 cm460.00m20.00.08Pasang Kansteen125.00ml0.00.0DPEKERJAAN KERANGKA PARKIR DAN ATAP1Mengerjakan pekerjaan kerangka parkir Besi Galvanis1.00unit0.00.02Pasang Atap genteng bitumen sekualitas "Ondulline ", colour156.00m20.00.03Pasang Atap nok genteng bitumen sekualitas "Ondulline ", colour26.00m10.00.04Pengecatan Bidang Besi 3X218.39m20.00.0EPEKERJAAN BOX TAMANE.1PEKERJAAN TANAH DAN URUGAN1Mengerjakan galian pondasi menerus39.46m30.00.02Mengurug pasir dasar pondasi menerus4.93m30.00.03Urug Tanah Mendatangkan tanah subur36.99m30.00.0E.2PEKERJAAN PASANGAN1Membuat lantai kerja beton mutu fc = 7,4 MPa4.93m30.00.02Memasang pondasi batu belah, campuran 1 PC : 5 PP73.98m30.00.03Pekerjaan Plesteran2.88m20.00.04Pekerjaan Acian2.88m20.00.05Pasang Batu pecah (lantai)19.44m20.00.06Memasang finishing siar pasangan batu kali adukan 1 PC : 2 PP122.60m20.00.0E.3PEKERJAAN TANAMAN1Melati Belanda32.00bh0.00.02Asoka tinggi 1m37.00bh0.00.0SUB JUMLAH0.06PEMBUATAN PAGAR TAMANAPEKERJAAN TANAH DAN URUGAN1Pekerjaan Bongkaran7.82m30.00.02Pekerjaan Galian27.16m30.00.03Urug Kembali Galian16.46m30.00.04Mengurug pasir11.85m30.00.05Urugan mendatangkan tanah subur8.14m30.00.0BPEKERJAAN PASANGAN1Memasang pondasi batu belah, campuran 1 PC : 5 PP10.70m30.00.02Memasang dinding bata merah tebal 1/2 bata, campuran spesi 1 PC : 3 PP46.32m20.00.03Memasang plesteran 1 PC : 3 PP, tebal 15 mm92.63m20.00.04Memasang acian92.63m20.00.05memasang Batu tempel58.97m20.00.06Memasang Batu Ampyang4.16m20.00.07Coating Batu tempel58.97m20.00.08Memasang Kansteen5.45m10.00.09Tanaman hias(perdu)116bh0.00.0SUB JUMLAH0.0GEDUNG REKTORAT1PORTAL 1APEKERJAAN BONGKARAN1Pembongkaran Portal yang lama1.00ls0.00.0BPEKERJAAN TANAH DAN URUGAN1Mengerjakan galian tanah0.030.00.0CPEKERJAAN PASANGANaMengerjakan Pembuatan Portal1.00unit0.00.0SUB JUMLAH0.02PORTAL 2APEKERJAAN BONGKARAN1Pembongkaran Portal yang lama1.00ls0.00.0BPEKERJAAN TANAH DAN URUGAN1Mengerjakan galian tanah0.03m30.00.0CPEKERJAAN PASANGAN1Mengerjakan Pembuatan Portal1.00unit0.00.0SUB JUMLAH0.03PORTAL 3APEKERJAAN PASANGAN1Mengerjakan Pembuatan Portal1.00unit0.00.0SUB JUMLAH0.04PORTAL 4APEKERJAAN PASANGAN1Mengerjakan Pembuatan Portal1.00unit0.00.0SUB JUMLAH0.05PORTAL 5APEKERJAAN TANAH DAN URUGAN1Mengerjakan galian tanah0.03m30.00.0BPEKERJAAN PASANGAN1Mengerjakan Pembuatan Portal1.00unit0.00.0SUB JUMLAH0.06PORTAL 6APEKERJAAN TANAH DAN URUGAN1Mengerjakan galian tanah0.03m30.00.0BPEKERJAAN PASANGAN1Mengerjakan Pembuatan Portal1.00unit0.00.0SUB JUMLAH0.07PEMBUATAN KANSTIN DEPAN REKTORATAPEKERJAAN BONGKARAN1Pekerjaan bongkaran dan perataan1.00ls0.00.0BPEKERJAAN PASANGAN1Pasang kansteen beton pracetak / kerb135.70m10.00.02Mengurug Tanah urug taman(subur)33.48m30.00.03Tanaman Hias (Asoka)28.00bh0.00.04Tanaman Hias (Melati Belanda)29.00bh0.00.0SUB JUMLAH0.08PAGAR KAWAT KELILING LAPANGAN TENISAPEKERJAAN TANAH DAN URUGAN1Mengerjakan galian pondasi menerus47.54m30.00.02Urug kembali bekas galian pondasi menerus16.64m30.00.03Mengurug pasir dasar pondasi menerus4.53m30.00.04PEKERJAAN PASANGAN5Membuat lantai kerja beton mutu fc = 7,4 MPa Pondasi Menerus3.40m30.00.06Memasang pondasi batu belah, campuran 1 PC : 5 PP30.56m30.00.07Mengerjakan beton bertulang Sloof 15 X 20 cm3.40m30.00.08Pasang kawat harmonika679.20m20.00.09Memasang Kolom besi baja IWF 150x150x65,292.00kg0.00.010Memasang balok besi baja IWF 150x150x67,131.60kg0.00.0SUB JUMLAH0.09PENGGANTIAN TUTUP SALURAN DEPAN DEKANAT FSP DAN PENGGANTIAN CONBLOCK DEPAN PORTALAPENGGANTIAN TUTUP SAH1Pekerjaan Bongkaran bibir saluran (Pas. Batu Kali)2.03m20.00.02Pekerjaan penutupan Saluran Air Hujan2.03m30.00.03MERAPIKAN TANJAKAN DEPAN PORTAL4Bongkar Conblock94.12m20.00.05Mengurug sirtu padat untuk peninggian10.02m30.00.06Pemasangan Conblok94.12m20.00.0SUB JUMLAH0.010PENGGANTIAN BANKET,PEMASANGAN BATU TEMPEL DAN PENGGANTIAN CONBLOCKAPEKERJAAN PENGGANTIAN BANGKETA.1PEKERJAAN BONGKARAN1Pekerjaan bongkaran kanstin1.00ls0.00.0A.2PEKERJAAN TANAH DAN URUGAN1Mengerjakan galian pondasi menerus2.08m30.00.02Mengurug pasir dasar pondasi menerus0.26m30.00.03Urug Tanah Mendatangkan tanah Subur27.90m30.00.0A.3PEKERJAAN PASANGAN1Membuat lantai kerja beton mutu fc = 7,4 MPa Pondasi Menerus2.28m30.00.02Memasang pondasi batu belah, campuran 1 PC : 5 PP11.11m30.00.03Pekerjaan Plesteran8.00m20.00.04Pekerjaan Acian8.00m20.00.05Pengadaan Dan Penanaman The-tehan t= 0.5 m16.00rmpn0.00.06Pengadaan Dan Penanaman Rumput Gajah Mini27.00m20.00.0BPEMASANGAN BATU TEMPEL/PECAH1Pasang Batu Tempel151.53m20.00.02Pekerjaan Plesteran29.65m20.00.03Pekerjaan Acian29.65m20.00.04Coating Batu Tempel151.53m20.00.0CPENGGANTIAN CONBLOCK1Pembongkaran Conblock55.00m20.00.02Pemasangan Conblock55.00m20.00.0SUB JUMLAH0.011PAGAR SELATAN LAPANGAN TENISAPEKERJAAN TANAH DAN URUGAN1Mengerjakan galian pondasi menerus11.47m30.00.02Urug kembali bekas galian pondasi menerus4.01m30.00.03Mengurug pasir dasar pondasi menerus1.09m30.00.0BPEKERJAAN PASANGAN1Membuat lantai kerja beton mutu fc = 7,4 MPa Pondasi Menerus0.82m30.00.02Memasang pondasi batu belah, campuran 1 PC : 5 PP7.37m30.00.03Mengerjakan beton bertulang Sloof 20 X 30 cm1.64m30.00.04Mengerjakan beton bertulang Kolom 20 X 20 cm1.10m30.00.05Mengerjakan beton bertulang Ring Balk 15 X 20 cm0.82m30.00.06Memasang Dinding Batako68.25m20.00.0SUB JUMLAH0.012PENGGANTIAN CONBLOK JALAN DEPAN FSMRAPEKERJAAN BONGKARAN1Pekerjaan bongkar conblock1,237.60m20.00.02Pasang Conblock segi empat tebal 6 cm1,237.60m20.00.0SUB JUMLAH0.013PENGGANTIAN DAN MULTIFUNGSIKAN SELOKAN DEPAN FSMR1Membersihkan Lapangan dan Perataan14.00m20.00.02Pelumpuran saluran air hujan dan saluran irigasi terbuka33.36m30.00.03Penggantian SAH(pasangan Batu kali)28.00m30.00.04Cor Plat Beton(Akses Jalan)3.00m30.00.0SUB JUMLAH0.014TAMAN SELATAN KANTINAMEMBERSIHKAN LAPANGAN DAN PERATAAN1.00ls0.00.0BPEKERJAAN TANAH DAN URUGAN1Mengerjakan galian pondasi menerus3.69m30.00.02Mengurug pasir dasar pondasi menerus0.62m30.00.03Urugan mendatangkan tanah65.10m30.00.0CPEKERJAAN PASANGAN1Membuat lantai kerja beton mutu fc = 7,4 MPa Pondasi Menerus0.62m30.00.02Memasang pondasi batu belah, campuran 1 PC : 5 PP1.18m30.00.03Pekerjaan Plesteran0.62m20.00.04Pekerjaan Acian0.62m20.00.05Memasang finishing siar pasangan batu kali adukan 1 PC : 2 PP14.35m20.00.06Pengadaan dan Penanaman Rumput Gajah Mini159.16m20.00.07Pengadaan dan Penanaman Biola Cantik t = 3- 4 m3.00btg0.00.08Pengadaan dan Penanaman Melati Belanda129.00btg0.00.0SUB JUMLAH0.015TAMAN RUANG PUBLIK BARAT MASJIDAMEMBERSIHKAN LAPANGAN DAN PERATAAN1.00ls0.00.01pemasangan Conblock215.00m20.00.02Pemasangan Kansteen219.00ml0.00.0BBOX TAMAN DEPAN (A)B.1PEKERJAAN TANAH DAN URUGAN1Mengerjakan galian pondasi menerus4.32m30.00.02Mengurug pasir dasar pondasi menerus0.54m30.00.03Urugan Tanah Mendatangkan1.44m30.00.04Urugan mendatangkan tanah subur12.46m30.00.0B.2PEKERJAAN PASANGAN0.01Membuat lantai kerja beton mutu fc = 7,4 MPa Pondasi Menerus0.54m30.00.02Memasang pondasi batu belah, campuran 1 PC : 5 PP4.12m30.00.03Pekerjaan Plesteran6.24m20.00.04Pekerjaan Acian6.24m20.00.05Memasang finishing siar pasangan batu kali adukan 1 PC : 2 PP11.19m20.00.06Pengadaan dan Penanaman Melati Belanda26.00bh0.00.07Pengadaan dan Penananman Pucuk Merah t= 1.5 - 2m22.00btg0.00.08Pengadaan dan Penanaman Bugenvil t= 1m1.00bh0.00.09Pengadaan dan Penanaman Rumput Manila (E)10.30m20.00.0CTEMPAT DUDUK 3 unit (G)C.1PEKERJAAN TANAH DAN URUGAN1Mengerjakan galian pondasi menerus4.21m30.00.02Mengurug pasir dasar pondasi menerus0.70m30.00.03Urugan Tanah Mendatangkan0.23m30.00.04Urugan mendatangkan tanah subur16.76m30.00.0C.2PEKERJAAN PASANGAN1Membuat lantai kerja beton mutu fc = 7,4 MPa Pondasi Menerus0.70m30.00.02Memasang pondasi batu belah, campuran 1 PC : 5 PP10.13m30.00.03Plat Beton T= 101.88m30.00.04Plat Beton T= 70.84m30.00.05Angkur15.55kg0.00.06Pekerjaan Acian26.40m20.00.07Memasang finishing siar pasangan batu kali adukan 1 PC : 2 PP23.58m20.00.08Pengadaan dan Penanaman Biola Cantik t= 3 - 4m3.00bh0.00.09Pengadaan dan Penanaman Rumput Manila76.20m20.00.0DTAMAN OVAL 4 Unit (D)APEKERJAAN TANAH DAN URUGAN1Mengerjakan galian pondasi menerus5.40m30.00.02Mengurug pasir dasar pondasi menerus0.90m30.00.03Urugan tanah mendatangkan7.20m30.00.04Urugan mendatangkan tanah subur1.20m30.00.0BPEKERJAAN PASANGAN1Membuat lantai kerja beton mutu fc = 7,4 MPa Pondasi Menerus0.90m30.00.02Memasang pondasi batu belah, campuran 1 PC : 5 PP14.40m30.00.03Pekerjaan Plesteran18.00m20.00.04Pekerjaan Acian18.00m20.00.05Memasang finishing siar pasangan batu kali adukan 1 PC : 2 PP30.00m20.00.06Pengadaan dan Penanaman Rumput Manila66.50m20.00.07Pengadaan dan Penanaman Pohon Palm Kuning t= 1 m12.00rmpn0.00.08Pengadaan dan Penanaman Biola Cantik t = 3-4m2.00bh0.00.09Pengadaan dan Penanaman Pohon Palm Putri t= 1.5 m4.00bh0.00.0ETAMAN SAMPING KANAN DAN KIRI ( C )1Urugan mendatangkan tanah subur8.10m30.00.02Pengadaan dan Penanaman Rumput Manila40.50m20.00.03Pengadaan dan Penanaman Pohon Palm Putri t= 1.5 m24.00btg0.00.0SUB JUMLAH0.016PENUTUPAN KOLAMAUrug Tanah Mendatangkan867.75m30.00.0SUB JUMLAH0.0

&Lrincian&C&P

REKAPITULASIREKAPITULASI BILL OF QUANTITY (BoQ)INSTANSI:INSTITUT SENI INDONESIA YOGYAKARTAPEKERJAAN:PERENCANAAN PEMBANGUNAN PRASARANA LINGKUNGAN ISI YOGYAKARTALOKASI:ISI YOGYAKARTATAHUN:2013NOURAIAN PEKERJAANJUMLAH HARGAFAKULTAS SENI MEDIA REKAM (FSMR)APEKERJAAN PERSIAPAN0.01PEKERJAAN TALUD DAN PAGAR0.02PEKERJAAN PEMBUATAN PINTU DAN JENDELA POS SATPAM0.03PEKERJAAN PORTAL0.04PARKIRAN FOTOGRAFI (UTARA)0.0FAKULTAS SENI PERTUNJUKAN (FSP)1TUTUP SALURAN AIR HUJAN0.02PENGGANTIAN DAN PENAMBAHAN CONBLOK0.03PEMASANGAN CONBLOCK BARU (AREA PARKIR)0.04PENGGANTIAN CONBLOCK,KANSTEEN ,MULTIFUNGSIKAN SAH & PEMBUATAN AREA PARKIR0.05PARKIR FSP0.06PEMBUATAN PAGAR TAMAN0.0GEDUNG REKTORAT1PORTAL 10.02PORTAL 20.03PORTAL 30.04PORTAL 40.05PORTAL 50.06PORTAL 60.07PEMASANGAN KANSTEEN DAN CON BLOCK DEPAN REKTORAT0.08PAGAR KAWAT KELILING LAPANGAN TENIS0.09PENGGANTIAN TUTUP SALURAN DEPAN DEKANAT FSP0.010PEMBUATAN TALUD DAN PEMASANGAN BATU LEMPENG DAN CONBLOCK0.011PAGAR SELATAN LAPANGAN TENIS0.012PENGGANTIAN CONBLOK JALAN DEPAN FSMR0.013PEMBUATAN DAN MEMULTIFUNGSIKAN SELOKAN DEPAN FSMR0.014TAMAN SELATAN KANTIN0.015TAMAN RUANG PUBLIK(BARAT MASJID)0.016PENUTUPAN KOLAM0.0JUMLAH0.0PPN 10 %0.0JUMLAH TOTAL0.0DIBULATKAN0.0Terbilang:Yogyakarta, Oktober 2013PT/CV/PBPimpinan/DirekturMuh. Mansur,ST.MsiNIP. 19610323 198303 1 011

&Lrekapitulasi&C&P&RISI

AHS 2010ANALISA HARGA SATUAN PEKERJAAN KONSTRUKSIINSTANSI:PERENCANAAN PEMBANGUNAN PRASARANA LINGKUNGAN ISI YOGYAKARTAPEKERJAAN:INSTITUT SENI INDONESIA YOGYAKARTALOKASI:ISI YOGYAKARTATAHUN:2013No.Macam PekerjaanUpahBahanJumlah(1)(2)(3)(4)(5)A.1.111.0000m1Pek. Pengukuran & Pemasangan BowplankSNI-20020.0120m3Kayu Kaso 5 / 7 (borneo/meranti)@ Rp.0.00.00.0070m3Kayu Papan 3 / 20 borneo/meranti@ Rp.0.00.00.0200kgPaku Biasa 2" - 5"@ Rp.0.00.00.1000ohPekerja@ Rp.0.00.00.1000ohTukang kayu@ Rp.0.00.00.0100ohKepala tukang@ Rp.0.00.00.0050ohMandor@ Rp.0.00.0JUMLAH ( BELUM PPN )0.00.00.0JASA 10 %0.0JUMLAH0.0DIBULATKAN0.01.00bhMembuat Papan Nama Proyek 80x120 cm (bahan flexi)A.1.320.0350m3Kayu meranti@ Rp.0.00.0SNI-20021.0000m2Print outdoor flexi@ Rp.0.00.00.6000kgPaku@ Rp.0.00.016.8000kgPC@ Rp.0.00.00.0270m3Pasir beton@ Rp.0.00.00.0405m3Kerikil beton@ Rp.0.00.01.0000ohPekerja@ Rp.0.00.00.0175ohTukang batu@ Rp.0.00.01.0000ohTukang kayu@ Rp.0.00.01.0000ohTukang cat@ Rp.0.00.1000ohMandor@ Rp.0.00.0JUMLAH ( BELUM PPN )0.00.00.0JASA 10 %0.0JUMLAH0.0DIBULATKAN0.031.0000m2Membersihkan Lapangan dan PerataanSNI-20020.1000ohPekerja@ Rp.0.00.00.0500ohMandor@ Rp.0.00.0JUMLAH ( BELUM PPN )0.00.00.0JASA 10 %0.0JUMLAH0.0DIBULATKAN0.041 m3 Pelumpuran saluran air hujan dan saluran irigasi terbuka1 m3Galian tanah lumpur1.2000ohPekerja@ Rp.0.00.00.0450ohMandor@ Rp.0.00.0JUMLAH0.00.0JASA 10%0.0JUMLAH0.0DIBULATKAN0.051.0000m2Membersihkan selokanak0.1000ohPekerja@ Rp.0.00.00.0500ohMandor@ Rp.0.00.0JUMLAH ( BELUM PPN )0.00.00.0JASA 10 %0.0JUMLAH0.0DIBULATKAN0.061.0000m2Pek. Kantor Direksi Keet , dengan lantai plesteran1.2500btgDolken Kayu 8 - 10/400 cm@ Rp.0.00.00.1800m3Kayu Balok Borneo@ Rp.0.00.00.8500kgPaku@ Rp.0.00.01.1000kgBesi Strip@ Rp.0.00.035.0000kgSemen Portland@ Rp.0.00.00.1500m3Pasir Pasang@ Rp.0.00.00.1000m3Pasir beton@ Rp.0.00.00.1500m3Koral Beton@ Rp.0.00.030.0000bhBata merah@ Rp.0.00.010.2500lbrSeng Plat@ Rp.0.00.0SNI-20020.5000bhJendela nako (rangka + kaca 5 mm)@ Rp.0.00.00.0800m2Kaca Polos@ Rp.0.00.00.1500bhKunci Tanam@ Rp.0.00.00.0600lbrPlywood 4 mm@ Rp.0.00.02.0000ohPekerja@ Rp.0.00.02.0000ohTukang kayu@ Rp.0.00.01.0000ohTukang batu@ Rp.0.00.00.3000ohKepala tukang@ Rp.0.00.00.0500ohMandor@ Rp.0.00.0JUMLAH ( BELUM PPN )0.00.00.0JASA 10 %0.0JUMLAH0.0DIBULATKAN0.071.0000m3Membongkar pasangan batu kali4.0000ohTukang batu@ Rp.0.00.00.4000ohPekerja@ Rp.0.00.0JUMLAH ( BELUM PPN )0.00.00.0JASA 10 %0.0JUMLAH0.0B.2DIBULATKAN0.081.0000m3Membongkar pasangan batu merah dan membersihkanSNI-20072.0000ohTukang batu@ Rp.0.00.00.1000ohPekerja@ Rp.0.00.0JUMLAH ( BELUM PPN )0.00.00.0JASA 10 %0.0JUMLAH0.0DIBULATKAN0.091.0000m2Pekerjaan bongkar conblock0.2000ohPekerja@ Rp.0.00.0B.80.0100ohMandor@ Rp.0.00.0SNI-2002JUMLAH ( BELUM PPN )0.00.00.0JASA 10 %0.0JUMLAH0.0DIBULATKAN0.0101.0000m3Membongkar beton bertulang dan membersihkan0.2000ohTukang batu@ Rp.0.00.0B.88.0000ohPekerja@ Rp.0.00.0SNI-20020.1000ohMandor@ Rp.0.00.0JUMLAH ( BELUM PPN )0.00.00.0JASA 10 %0.0JUMLAH0.0DIBULATKAN0.0B.13111.0000m3Menggali tanah biasaSNI-20070.7500ohPekerja@ Rp.0.00.00.0250ohMandor@ Rp.0.00.0JUMLAH ( BELUM PPN )0.00.00.0JASA 10 %0.0JUMLAH0.0DIBULATKAN0.0121.0000m3Menggali tanah biasa sedalam 3 meterB.111.0500ohPekerja@ Rp.0.00.0SNI-20070.0670ohMandor@ Rp.0.00.0JUMLAH ( BELUM PPN )0.00.00.0JASA 10 %0.0JUMLAH0.0DIBULATKAN0.0131.0000m3Urug kembali bekas galian0.1920ohPekerja@ Rp.0.00.00.0190ohMandor@ Rp.0.00.0JUMLAH ( BELUM PPN )0.00.0JASA 10 %0.0JUMLAH0.0DIBULATKAN0.0141.0000m3Mengurug pasir urugSNI-20071.2000m3Pasir urug@ Rp.0.00.00.3000ohPekerja@ Rp.0.00.00.0100ohMandor@ Rp.0.00.0JUMLAH ( BELUM PPN )0.00.00.0JASA 10 %0.0JUMLAH0.0DIBULATKAN0.0151.0000m3Urug tanah mendatangkan tanah suburSNI-20071.2000m3Tanah Taman@ Rp.0.00.00.3000ohPekerja@ Rp.0.00.0C.270.0100ohMandor@ Rp.0.00.0JUMLAH ( BELUM PPN )0.00.00.0JASA 10 %0.0JUMLAH0.0DIBULATKAN0.0C.46161.0000m3Urug tanah mendatangkanSNI-20071.2000m3Tanah urug@ Rp.0.00.00.3000ohPekerja@ Rp.0.00.00.0100ohMandor@ Rp.0.00.0JUMLAH ( BELUM PPN )0.00.00.0JASA 10 %0.0JUMLAH0.0DIBULATKAN0.0171.0000m3Memadatkan tanah per 20 cm0.5000ohPekerja@ Rp.0.00.0C.490.0500ohMandor@ Rp.0.00.0SNI-2007JUMLAH ( BELUM PPN )0.00.0JASA 10 %0.0JUMLAH0.0DIBULATKAN0.0181.0000m3Mengurug sirtu padat untuk peninggian lantai bangunan1.2000m3Sirtu@ Rp.0.00.00.2500ohPekerja@ Rp.0.00.00.0250ohMandor@ Rp.0.00.0JUMLAH ( BELUM PPN )0.00.00.0JASA 10 %0.0JUMLAH0.0DIBULATKAN0.0191.0000m3Memasang pondasi batu belah, campuran 1 PC : 5 PP1.2000m3Batu belah 15 cm/20 cm@ Rp.0.00.0136.0000kgPortland Cement@ Rp.0.00.00.5440m3Pasir Pasang@ Rp.0.00.01.5000ohPekerja@ Rp.0.00.0C.640.7500ohTukang batu@ Rp.0.00.00.0750ohKepala tukang@ Rp.0.00.00.0750ohMandor@ Rp.0.00.0JUMLAH ( BELUM PPN )0.00.00.0JASA 10 %0.0JUMLAH0.0DIBULATKAN0.0201.00m2Pasangan dinding batako12.500bhBatako@ Rp.0.00.012.130kgPC@ Rp.0.00.00.032m3Pasir pasang@ Rp.0.00.0C.650.3000ohPekerja@ Rp.0.00.0AK0.1500ohTukang batu@ Rp.0.00.00.0150ohKepala tukang batu@ Rp.0.00.00.0150ohMandor@ Rp.0.00.0JUMLAH ( BELUM PPN )0.00.00.0JASA 10 %0.0JUMLAH0.0DIBULATKAN0.0231.0000m2Memasang dinding bata merah tebal 1/2 bata, campuran spesi 1 PC : 3 PP70.0000bhBata merah@ Rp.0.00.014.3700kgPortland Cement@ Rp.0.00.00.0400m3Pasir Pasang@ Rp.0.00.00.3000ohPekerja@ Rp.0.00.00.1000ohTukang batu@ Rp.0.00.00.0100ohKepala tukang@ Rp.0.00.00.0150ohMandor@ Rp.0.00.0JUMLAH ( BELUM PPN )0.00.00.0JASA 10 %0.0JUMLAH0.0DIBULATKAN0.0241.0000m2Memasang plesteran 1 PC : 3 PP, tebal 15 mmSNI-20077.7760kgPortland Cement@ Rp.0.00.00.0230m3Pasir Pasang@ Rp.0.00.00.3000ohPekerja@ Rp.0.00.00.1500ohTukang batu@ Rp.0.00.00.0150ohKepala tukang@ Rp.0.00.00.0150ohMandor@ Rp.0.00.0D.7JUMLAH ( BELUM PPN )0.00.00.0JASA 10 %0.0JUMLAH0.0DIBULATKAN0.01.0000m2Memasang acian253.2500kgPortland Cement@ Rp.0.00.0D.15SNI-20070.2000ohPekerja@ Rp.0.00.00.1000ohTukang batu@ Rp.0.00.00.0100ohKepala tukang@ Rp.0.00.00.0100ohMandor@ Rp.0.00.0JUMLAH ( BELUM PPN )0.00.00.0JASA 10 %0.0JUMLAH0.0DIBULATKAN0.0261.0000m3Membuat lantai kerja beton mutu fc = 7,4 MPa (K 100),230.0000kgPortland Cement@ Rp.0.00.00.6379m3Pasir beton@ Rp.0.00.00.7607m3Koral beton@ Rp.0.00.0200.0000LiterAir@ Rp.0.00.01.2000ohPekerja@ Rp.0.00.00.2000ohTukang batu@ Rp.0.00.00.0200ohKepala tukang@ Rp.0.00.00.0600ohMandor@ Rp.0.00.0JUMLAH ( BELUM PPN )0.00.00.0JASA 10 %0.0JUMLAH0.0DIBULATKAN0.0271.0000m2Pasang conblock tipe segi-empat, uni, segi-enam abu-abu 6 cm, K-225 tebal pasir 5 cm1.0000m2Conblock@ Rp.0.00.00.0500m3Pasir urug@ Rp.0.00.00.5000ohPekerja@ Rp.0.00.00.2500ohTukang batu@ Rp.0.00.00.0250ohKep. Tk. Batu@ Rp.0.00.00.0250ohMandor@ Rp.0.00.0JUMLAH ( BELUM PPN )0.00.00.0JASA 10 %0.0JUMLAH0.0DIBULATKAN0.0281.0000m3Membuat beton mutu fc = 19,3 MPa (K 225), slump (12 2) cm, w/c = 0,58371.0000kgPortland Cement@ Rp.0.00.00.4986m3Pasir beton@ Rp.0.00.00.7756m3Koral beton@ Rp.0.00.0215.0000LiterAir@ Rp.0.00.01.6500ohPekerja@ Rp.0.00.00.2750ohTukang batu@ Rp.0.00.00.0280ohKepala tukang@ Rp.0.00.00.0830ohMandor@ Rp.0.00.0JUMLAH ( BELUM PPN )0.00.00.0JASA 10 %0.0JUMLAH0.0DIBULATKAN0.0291.0000m3Membuat beton mutu fc = 14,5 MPa (K 175), slump (12 2) cm, w/c = 0,66326.0000kgPortland Cement@ Rp.0.00.00.5429m3Pasir beton@ Rp.0.00.00.7622m3Koral beton@ Rp.0.00.0215.0000LiterAir@ Rp.0.00.01.6500ohPekerja@ Rp.0.00.00.2750ohTukang batu@ Rp.0.00.00.0280ohKepala tukang@ Rp.0.00.00.0830ohMandor@ Rp.0.00.0JUMLAH ( BELUM PPN )0.00.00.0JASA 10 %0.0JUMLAH0.0DIBULATKAN0.03010.0000kgPembesian dengan besi polos10.5000kgBesi beton polos@ Rp.0.00.00.1500kgKawat beton@ Rp.0.00.00.0700ohPekerja@ Rp.0.00.00.0700ohTukang besi@ Rp.0.00.00.0070ohKepala tukang@ Rp.0.00.00.0040ohMandor@ Rp.0.00.0JUMLAH ( BELUM PPN )0.00.00.0JASA 10 %0.0JUMLAH0.0DIBULATKAN0.0311.0000m2Cetakan beton / begisting memakai multiplek0.0170m3Usuk meranti@ Rp.0.00.00.3470lbrMultiplek@ Rp.0.00.00.4000kgPaku@ Rp.0.00.00.2000ohPekerja@ Rp.0.00.00.5000ohTukang kayu@ Rp.0.00.00.0500ohKep. Tk. Kayu@ Rp.0.00.00.0100ohMandor@ Rp.0.00.0JUMLAH ( BELUM PPN )0.00.00.0JASA 10 %0.0JUMLAH0.0DIBULATKAN0.0321.0000m3Membongkar cetakan4.0000ohPekerja@ Rp.0.00.0JUMLAH ( BELUM PPN )0.00.00.0JASA 10 %0.0JUMLAH0.0DIBULATKAN0.033m3Stutwerk untuk 1 m3 beton, tinggi 3 - 4 m ( memakai scafolding )32.0000unitScafolding@ Rp.0.00.02.2000ohPekerja@ Rp.0.00.03.5000ohTukang kayu@ Rp.0.00.00.3500ohKep. Tk. Kayu@ Rp.0.00.00.1200ohMandor@ Rp.0.00.0JUMLAH ( BELUM TERMASUK PPN )0.00.00.0JASA 10 %0.0JUMLAH0.0DIBULATKAN0.0341.0000m3Mengerjakan beton bertulang Sloof 20 X 30 cm (Stoper)A.Beton cor (fc = 19.3 MPa)11m30.0B.Tulangan polos145.58kg0.0C.Cetakan memakai multiplek10.00m2 3 X pemakaian0.0D.Membongkar cetakan0.0JUMLAH0.00.0DIBULATKAN0.0351.0000m3Mengerjakan beton bertulang Sloof 15 X 20 cmA.Beton cor (fc = 19.3 MPa)11m30.0B.Tulangan polos229.46kg0.0C.Cetakan memakai multiplek19.33m2 3 X pemakaian0.0D.Membongkar cetakan0.0JUMLAH0.00.0DIBULATKAN0.0361.0000m3Mengerjakan beton bertulang Rabat 15 X 20 cmA.Beton cor (fc = 19.3 MPa)11m30.0B.Tulangan polos229.46kg0.0C.Cetakan memakai multiplek19.33m2 3 X pemakaian0.0D.Membongkar cetakan0.0JUMLAH0.00.0DIBULATKAN0.0371.0000m3Mengerjakan beton bertulang Kolom 15 X 15 cmA.Beton cor (fc = 19.3 MPa)11m30.0B.Tulangan polos227.328kg0.0C.Cetakan memakai multiplek26.67m2 3 X pemakaian0.0D.Membongkar cetakan0.0JUMLAH0.00.0DIBULATKAN0.0381.0000m3Mengerjakan beton bertulang Kolom 20 X 20 cm (K8)A.Beton cor (fc = 19.3 MPa)11m30.0B.Tulangan polos276.32kg0.0C.Cetakan memakai multiplek20.00m2 3 X pemakaian0.0D.Membongkar cetakan0.0JUMLAH0.00.0DIBULATKAN0.0391.0000m3Mengerjakan beton bertulang Kolom 40 X 40 cmA.Beton cor (fc = 19.3 MPa)11m30.0B.Tulangan polos83.271kg0.0C.Cetakan memakai multiplek10.00m2 3 X pemakaian0.0D.Membongkar cetakan0.0JUMLAH0.00.0DIBULATKAN0.0401.0000m3Mengerjakan beton bertulang Ring balok 15 X 20 cmA.Beton cor (fc = 19.3 MPa)11m30.0B.Tulangan polos229.46kg0.0C.Cetakan memakai multiplek23.33m2 3 X pemakaian0.0D.Membongkar cetakan0.0JUMLAH0.00.0DIBULATKAN0.0411.0000m3Mengerjakan beton bertulang Ring balok 15 X 15 cmA.Beton cor (fc = 19.3 MPa)11m30.0B.Tulangan polos141.144kg0.0C.Cetakan memakai multiplek23.33m2 3 X pemakaian0.0D.Membongkar cetakan0.0JUMLAH0.00.0DIBULATKAN0.0421.0000m3Mengerjakan beton bertulang plat tempat dudukt=7cmA.Beton cor (fc = 19.3 MPa)11m30.0B.Tulangan polos202.4kg0.0C.Cetakan memakai multiplek14.29m2 2 X pemakaian0.0D.Stut werk / perancah0.0E.Membongkar cetakan0.0JUMLAH0.00.0DIBULATKAN0.0431.0000m3Mengerjakan beton bertulang plat tempat dudukt=10cmA.Beton cor (fc = 19.3 MPa)11m30.0B.Tulangan polos141.68kg0.0C.Cetakan memakai multiplek10.00m2 2 X pemakaian0.0D.Stut werk / perancah0.0E.Membongkar cetakan0.0JUMLAH0.00.0DIBULATKAN0.0441.0000m3Mengerjakan beton bertulang plat t=12 cmA.Beton cor (fc = 19.3 MPa)11m30.0B.Tulangan polos143.9666666667kg0.0C.Cetakan memakai multiplek8.33m2 2 X pemakaian0.0D.Stut werk / perancah0.0E.Membongkar cetakan0.0JUMLAH0.00.0DIBULATKAN0.0451.0000m3Mengerjakan beton bertulang plat t=20 cmA.Beton cor (fc = 19.3 MPa)11m30.0B.Tulangan polos230.88kg0.0C.Cetakan memakai multiplek5.00m2 2 X pemakaian0.0D.Stut werk / perancah0.0E.Membongkar cetakan0.0JUMLAH0.00.0DIBULATKAN0.0461.0000m3Mengerjakan beton bertulang plat t=15 cmA.Beton cor (fc = 19.3 MPa)11m30.0B.Tulangan polos115.1733333333kg0.0C.Cetakan memakai multiplek8.33m2 2 X pemakaian0.0D.Stut werk / perancah0.0E.Membongkar cetakan0.0JUMLAH0.00.0DIBULATKAN0.0471.0000kgMemasang besi siku 30x30x3mm1.15kgBesi siku 30 x 30 x 3mm@ Rp.0.00.00.06ohPekerja@ Rp.0.00.00.06ohTukang las@ Rp.0.00.00.006ohKepala tukang las@ Rp.0.00.00.003ohMandor@ Rp.0.00.0JUMLAH ( BELUM PPN )0.00.00.0JASA 10 %0.0JUMLAH0.0DIBULATKAN0.0481.0000kgMemasang besi Pegangan1.15kgBesi beton polos@ Rp.0.00.00.06ohPekerja@ Rp.0.00.00.06ohTukang las@ Rp.0.00.00.006ohKepala tukang las@ Rp.0.00.00.003ohMandor@ Rp.0.00.0JUMLAH ( BELUM PPN )0.00.00.0JASA 10 %0.0JUMLAH0.0DIBULATKAN0.0491.0000m1Memasang Pipa PVC tipe AW 2"1.2000m1Pipa PVC@ Rp.0.00.00.3500xHarga pipa (Perlengkapan)@ Rp.0.00.00.0544ohPekerja@ Rp.0.00.00.0900ohTukang batu@ Rp.0.00.00.0090ohKepala tukang batu@ Rp.0.00.00.0027ohMandor@ Rp.0.00.0JUMLAH ( BELUM TERMASUK PPN )0.00.00.0JASA 10 %0.0JUMLAH0.0DIBULATKAN0.0501.0000m1Memasang Pipa PVC tipe AW 3"1.2000m1Pipa PVC@ Rp.0.00.00.3500xHarga pipa (Perlengkapan)@ Rp.0.00.00.0810ohPekerja@ Rp.0.00.00.1350ohTukang batu@ Rp.0.00.00.0135ohKepala tukang batu@ Rp.0.00.00.0041ohMandor@ Rp.0.00.0JUMLAH ( BELUM TERMASUK PPN )0.00.00.0JASA 10 %0.0JUMLAH0.0DIBULATKAN0.0511.0000m1Memasang Pipa PVC tipe AW 4"1.2000m1Pipa PVC@ Rp.0.00.00.3500xHarga pipa (Perlengkapan)@ Rp.0.00.00.0810ohPekerja@ Rp.0.00.00.1350ohKepala tukang batu@ Rp.0.00.00.0135ohTukang batu@ Rp.0.00.00.0041ohMandor@ Rp.0.00.0JUMLAH ( BELUM TERMASUK PPN )0.00.00.0JASA 10 %0.0JUMLAH0.0DIBULATKAN0.0521.0000m1Memasang Pipa PVC tipe AW 5"1.2000m1Pipa PVC@ Rp.0.00.00.3500xHarga pipa (Perlengkapan)@ Rp.0.00.00.0810ohPekerja@ Rp.0.00.00.1350ohKepala tukang batu@ Rp.0.00.00.0135ohTukang batu@ Rp.0.00.00.0041ohMandor@ Rp.0.00.0JUMLAH ( BELUM TERMASUK PPN )0.00.00.0JASA 10 %0.0JUMLAH0.0DIBULATKAN0.0531.0000m2Pasang conblock tipe segi-empat, uni, segi-enam abu-abu 6 cm, K-225 tebal pasir 5 cm1.0000m2Conblock@ Rp.0.00.00.0500m3Pasir urug@ Rp.0.00.00.5000ohPekerja@ Rp.0.00.00.2500ohTukang batu@ Rp.0.00.00.0250ohKep. Tk. Batu@ Rp.0.00.00.0250ohMandor@ Rp.0.00.0JUMLAH ( BELUM PPN )0.00.00.0JASA 10 %0.0JUMLAH0.0DIBULATKAN0.0541.0000m2Pasang conblock tipe segi-enam warna 6cm, K-2251.0000m2Conblock@ Rp.0.00.00.0500m3Pasir urug@ Rp.0.00.00.5000ohPekerja@ Rp.0.00.00.2500ohTukang batu@ Rp.0.00.00.0250ohKep. Tk. Batu@ Rp.0.00.00.0250ohMandor@ Rp.0.00.0JUMLAH ( BELUM PPN )0.00.00.0JASA 10 %0.0JUMLAH0.0DIBULATKAN0.0551.0000m1Pasang kansteen beton pracetak / kerb2.0000bhKansteen beton@ Rp.0.00.00.0601m3Pasir pasang@ Rp.0.00.021.5766kgPC@ Rp.0.00.00.1502ohTukang batu@ Rp.0.00.00.0150ohKepala tukang@ Rp.0.00.00.4805ohPekerja@ Rp.0.00.00.0225ohMandor@ Rp.0.00.0JUMLAH ( BELUM PPN )0.00.00.0JASA 10 %0.0JUMLAH0.0DIBULATKAN0.0561.00m2Memasang dinding batu tempel1.1000m2Batu tempel hitam@ Rp.0.00.0SNI-200211.7500kgPortland Cement@ Rp.0.00.00.0350m3Pasir Pasang@ Rp.0.00.00.7000ohPekerja@ Rp.0.00.00.3500ohTukang batu@ Rp.0.00.00.0350ohKepala tukang@ Rp.0.00.00.0350ohMandor@ Rp.0.00.0JUMLAH ( BELUM TERMASUK PPN )0.00.00.0JASA 10 %0.0JUMLAH0.0DIBULATKAN0.0571.0000m2Mengerjakan Pekerjaan Coating Gloss0.4250ltrCoating Gloss@ Rp.0.00.00.3000ohTukang cat@ Rp.0.00.00.0300ohKep. Tk. Cat@ Rp.0.00.00.2000ohPekerja@ Rp.0.00.00.0100ohMandor@ Rp.0.00.0JUMLAH ( BELUM PPN )0.00.00.0JASA 10 %0.0JUMLAH0.0DIBULATKAN0.0581.0000m2Memasang finishing siar pasangan batu kali adukan 1 PC : 2 PP6.3400kgPortland Cement@ Rp.0.00.00.0120m3Pasir pasang@ Rp.0.00.00.3000ohPekerja@ Rp.0.00.00.1500ohTukang batu@ Rp.0.00.00.0150ohKepala tukang@ Rp.0.00.00.0150ohMandor@ Rp.0.00.0JUMLAH ( BELUM PPN )0.00.00.0JASA 10 %0.0JUMLAH0.0DIBULATKAN0.0591.0000m2Memasang dinding batu ampyang1.1000m2Batu ampyang@ Rp.0.00.011.7500kgPortland Cement@ Rp.0.00.00.0350m3Pasir Pasang@ Rp.0.00.0SNI-20020.7000ohPekerja@ Rp.0.00.00.3500ohTukang batu@ Rp.0.00.00.0350ohKepala tukang@ Rp.0.00.00.0350ohMandor@ Rp.0.00.0JUMLAH ( BELUM TERMASUK PPN )0.00.00.0JASA 10 %0.0JUMLAH0.0DIBULATKAN0.0601.0000unitMengerjakan pekerjaan kusen dan daun pintu11.4050m'Alumunium 4" (4x10 cm)@ Rp.0.00.012.4800m'Alumunium 5"x 1.75"@ Rp.0.00.00.0049m3kayu 3x4 cm@ Rp.0.00.00.0006m3kayu list@ Rp.0.00.02.0564m2Kaca bening 5 mm@ Rp.0.00.014.4800m1karet kaca@ Rp.0.00.00.8200m2Finishing HPL motif teak/jati@ Rp.0.00.00.8200m2Finishing Lapis alumunium@ Rp.0.00.03.0000bhEngsel pintu@ Rp.0.00.01.0000bhHandle pintu@ Rp.0.00.04.0000bhEngsel Jendela@ Rp.0.00.04.0000bhfriction stay@ Rp.0.00.03.0000bhKunci tanam@ Rp.0.00.01.0000lssarana pendukung dan perlengkapan@ Rp.0.00.00.7200ohPekerja@ Rp.0.00.02.1600ohTukang besi konstruksi@ Rp.0.00.00.2160ohKepala tukang@ Rp.0.00.00.0360ohMandor@ Rp.0.00.0JUMLAH ( BELUM PPN )0.00.00.0JUMLAH0.0DIBULATKAN0.0611.0000unitMengerjakan pekerjaan kusen dan daun pintu P15.6000m'Alumunium 4" (4x10 cm)@ Rp.0.00.05.7000m'Alumunium 5"x 1.75"@ Rp.0.00.00.0050m3kayu 3x4 cm@ Rp.0.00.00.0004m3kayu list@ Rp.0.00.00.1870m2Kaca buram/kaca es 5 mm@ Rp.0.00.03.6000m1karet kaca@ Rp.0.00.00.8200m2Finishing HPL motif teak/jati@ Rp.0.00.00.8400m2Finishing Lapis alumunium@ Rp.0.00.0SNI-20023.0000bhEngsel pintu@ Rp.0.00.01.0000bhHandle pintu@ Rp.0.00.03.0000bhKunci tanam@ Rp.0.00.01.0000lssarana pendukung dan perlengkapan@ Rp.0.00.00.7200ohPekerja@ Rp.0.00.02.1600ohTukang besi konstruksi@ Rp.0.00.00.2160ohKepala tukang@ Rp.0.00.00.0360ohMandor@ Rp.0.00.0JUMLAH ( BELUM PPN )0.00.00.0JUMLAH0.0DIBULATKAN0.0621.0000unitMengerjakan pekerjaan kusen dan daun jendela11.0200m'Alumunium 4" (4x10 cm)@ Rp.0.00.03.0800m2Kaca bening 5 mm@ Rp.0.00.011.3900m1karet kaca@ Rp.0.00.01.0000lssarana pendukung dan perlengkapan@ Rp.0.00.00.7200ohPekerja@ Rp.0.00.02.1600ohTukang besi konstruksi@ Rp.0.00.00.2160ohKepala tukang@ Rp.0.00.00.0360ohMandor@ Rp.0.00.0JUMLAH ( BELUM PPN )0.00.00.0JUMLAH0.0DIBULATKAN0.01.0000unitMengerjakan pekerjaan kusen dan daun jendela ( J 2 )634.9200m'Alumunium 4" (4x10 cm)@ Rp.0.00.0SNI 7394:2008 - 6.71.2648m2Kaca bening 5 mm@ Rp.0.00.04.5200m1karet kaca@ Rp.0.00.01.0000lssarana pendukung dan perlengkapan@ Rp.0.00.00.7200ohPekerja@ Rp.0.00.02.1600ohTukang besi konstruksi@ Rp.0.00.00.2160ohKepala tukang@ Rp.0.00.00.0360ohMandor@ Rp.0.00.0JUMLAH ( BELUM PPN )0.00.00.0JUMLAH0.0DIBULATKAN0.010.0000cmMengerjakan pengelasan dengan las listrik0.4000kgKawat las listrik@ Rp.0.00.0640.3000ltrSolar@ Rp.0.00.0SNI 7394:2008 - 6.170.0400ltrMinyak pelumas@ Rp.0.00.00.0400ohPekerja@ Rp.0.00.00.0200ohTukang besi konstruksi@ Rp.0.00.00.0020ohKepala tukang@ Rp.0.00.00.0020ohMandor@ Rp.0.00.00.1700JamSewa alat las@ Rp.0.00.0JUMLAH ( BELUM PPN )0.00.00.0JASA 10 %0.0JUMLAH0.0DIBULATKAN0.010.0000cm0.01.0000m10.0651.0000unitMengerjakan Pembuatan Portal7.6000m1Memasang Pipa Galvanis 3"@ Rp.0.00.015.04m1Memasang Pipa Galvanis 2.5"@ Rp.0.00.03.5200m1pengelasan dengan las listrik@ Rp.0.00.01.0000lsHarga pipa (Perlengkapan+Assecoris :pengait, engsel)@ Rp.0.00.05.3504ohPekerja@ Rp.0.00.05.9840ohTukang batu@ Rp.0.00.04.5584ohKepala tukang batu@ Rp.0.00.04.4475ohMandor@ Rp.0.00.0JUMLAH ( BELUM TERMASUK PPN )0.00.00.0JASA 10 %0.0JUMLAH0.0DIBULATKAN0.06610.0000cmMengerjakan pengelasan dengan las listrik0.4000kgKawat las listrik@ Rp.0.00.00.3000ltrSolar@ Rp.0.00.00.0400ltrMinyak pelumas@ Rp.0.00.00.0400ohPekerja@ Rp.0.00.00.0200ohTukang besi konstruksi@ Rp.0.00.00.0020ohKepala tukang@ Rp.0.00.00.0020ohMandor@ Rp.0.00.00.1700JamSewa alat las@ Rp.0.00.0JUMLAH ( BELUM PPN )0.00.00.0JASA 10 %0.0JUMLAH0.0DIBULATKAN0.010.0000cm0.01.0000m10.0671.0000m3Membuat beton mutu fc = 19,3 MPa (K 225), slump (12 2) cm, w/c = 0,58371.0000kgPortland Cement@ Rp.0.00.00.4986m3Pasir beton@ Rp.0.00.00.7756m3Koral beton@ Rp.0.00.0215.0000LiterAir@ Rp.0.00.01.6500ohPekerja@ Rp.0.00.00.2750ohTukang batu@ Rp.0.00.00.0280ohKepala tukang@ Rp.0.00.00.0830ohMandor@ Rp.0.00.0JUMLAH ( BELUM PPN )0.00.00.0JASA 10 %0.0JUMLAH0.0DIBULATKAN0.06810.0000kgPembesian dengan besi polos10.5000kgBesi beton polos@ Rp.0.00.00.1500kgKawat beton@ Rp.0.00.00.0700ohPekerja@ Rp.0.00.00.0700ohTukang besi@ Rp.0.00.00.0070ohKepala tukang@ Rp.0.00.00.0040ohMandor@ Rp.0.00.0JUMLAH ( BELUM PPN )0.00.00.0JASA 10 %0.0JUMLAH0.0DIBULATKAN0.06910.0000kgPembesian dengan besi ulir10.5000kgBesi beton ulir@ Rp.0.00.00.1500kgKawat beton@ Rp.0.00.00.0700ohPekerja@ Rp.0.00.00.0700ohTukang besi@ Rp.0.00.00.0070ohKepala tukang@ Rp.0.00.00.0040ohMandor@ Rp.0.00.0JUMLAH ( BELUM PPN )0.00.00.0JASA 10 %0.0JUMLAH0.0DIBULATKAN0.01.0000kgMemasang besi profil701.1500kgBesi profil@ Rp.0.00.00.0600ohPekerja@ Rp.0.00.00.0600ohTukang las konstruksi@ Rp.0.00.00.0060ohKepala tukang@ Rp.0.00.00.0030ohMandor@ Rp.0.00.0JUMLAH ( BELUM PPN )0.00.00.0JASA 10 %0.0JUMLAH0.0DIBULATKAN0.0711.0000m2Cetakan beton / begisting memakai multiplek0.0170m3Kayu meranti@ Rp.0.00.00.3470lbrMultiplek@ Rp.0.00.00.4000kgPaku@ Rp.0.00.00.2000ohPekerja@ Rp.0.00.00.5000ohTukang kayu@ Rp.0.00.00.0500ohKep. Tk. Kayu@ Rp.0.00.00.0100ohMandor@ Rp.0.00.0JUMLAH ( BELUM PPN )0.00.00.0JASA 10 %0.0JUMLAH0.0DIBULATKAN0.0721.0000m3Membongkar cetakan4.0000ohPekerja@ Rp.0.00.0JUMLAH ( BELUM PPN )0.00.00.0JASA 10 %0.0JUMLAH0.0DIBULATKAN0.0731.0000m3Mengerjakan beton bertulang Kolom 25 X 25 cmA.Beton cor (fc = 19.3 MPa)11m30.0SNI-2002B.Tulangan polos139.7568kg0.0C.Cetakan memakai multiplek16.00m2 2 X pemakaian0.0D.Membongkar cetakan0.0JUMLAH0.00.0DIBULATKAN0.0741.0000unitMengerjakan Pembuatan Portal I Dan II6.6000m1Memasang Pipa Galvanis 1"@ Rp.0.00.06.8500m1Memasang Pipa Galvanis 1,5"@ Rp.0.00.09.5500m1Memasang Pipa Galvanis 3"@ Rp.0.00.01.3200m1Memasang Pipa Galvanis 3,5"@ Rp.0.00.017.0000m1Besi plat 5mm@ Rp.0.00.08.8000m1pengelasan dengan las listrik@ Rp.0.00.0SNI-20020.1620m3Pembuatan Cor Beton pemberat (K 225)@ Rp.0.00.00.1050m3Pembuatan Cor Beton kolom (K 225)@ Rp.0.00.08.5363kgBesi Angkur 19mm@ Rp.0.00.01.1846kgBesi Angkur 10mm@ Rp.0.00.06.2800kgPlat Plendes T 5mm@ Rp.0.00.0JUMLAH ( BELUM TERMASUK PPN )0.00.0JASA 10 %0.0JUMLAH0.0DIBULATKAN0.0751.0000unitMengerjakan Pembuatan Portal III20.2600m1Memasang Pipa Galvanis 2,5"@ Rp.0.00.0SNI-20029.3000m1Memasang Pipa Galvanis 3"@ Rp.0.00.01.0000lsHarga pipa (Perlengkapan+Assecoris :pengait, engsel)@ Rp.0.00.07.0400m1pengelasan dengan las listrik@ Rp.0.00.00.1375m3Mengerjakan beton bertulang Kolom 25 X 25 cm@ Rp.0.00.0JUMLAH ( BELUM TERMASUK PPN )0.00.0JASA 10 %0.0JUMLAH0.0DIBULATKAN0.0761.0000unitMengerjakan Pembuatan Portal IV22.0600m1Memasang Pipa Galvanis 2,5"@ Rp.0.00.09.6000m1Memasang Pipa Galvanis 3"@ Rp.0.00.0SNI 7394:2008 - 6.41.0000lsHarga pipa (Perlengkapan+Assecoris :pengait, engsel)@ Rp.0.00.07.0400m1pengelasan dengan las listrik@ Rp.0.00.00.1375m3Mengerjakan beton bertulang Kolom 25 X 25 cm@ Rp.0.00.0JUMLAH ( BELUM TERMASUK PPN )0.00.0JASA 10 %0.0JUMLAH0.0DIBULATKAN0.0771.0000unitMengerjakan Pembuatan Portal V5.4000m1Memasang Pipa Galvanis 1"@ Rp.0.00.06.6000m1Memasang Pipa Galvanis 1,5"@ Rp.0.00.08.0000m1Memasang Pipa Galvanis 3"@ Rp.0.00.0SNI 7394:2008 - 6.71.4000m1Memasang Pipa Galvanis 3,5"@ Rp.0.00.017.0000m1Besi plat 5mm@ Rp.0.00.07.6000m1pengelasan dengan las listrik@ Rp.0.00.00.1280m3Pembuatan Cor Beton pemberat (K 225)@ Rp.0.00.00.6450m3Pembuatan Cor Beton kolom (K 225)@ Rp.0.00.08.5363kgBesi Angkur 19mm@ Rp.0.00.01.1846kgBesi Angkur 10mm@ Rp.0.00.06.2800kgPlat Plendes T 5mm@ Rp.0.00.0JUMLAH ( BELUM TERMASUK PPN )0.00.0JASA 10 %0.0JUMLAH0.0DIBULATKAN0.0781.0000unitMengerjakan Pembuatan Portal VISNI 7394:2008 - 6.176.6000m1Memasang Pipa Galvanis 1"@ Rp.0.00.07.3000m1Memasang Pipa Galvanis 1,5"@ Rp.0.00.08.4900m1Memasang Pipa Galvanis 3"@ Rp.0.00.01.4000m1Memasang Pipa Galvanis 3,5"@ Rp.0.00.017.0000m1Besi plat 5mm@ Rp.0.00.07.6000m1pengelasan dengan las listrik@ Rp.0.00.00.1280m3Pembuatan Cor Beton pemberat (K 225)@ Rp.0.00.00.6450m3Pembuatan Cor Beton kolom (K 225)@ Rp.0.00.08.5363kgBesi Angkur 19mm@ Rp.0.00.01.1846kgBesi Angkur 10mm@ Rp.0.00.06.2800kgPlat Plendes T 5mm@ Rp.0.00.0JUMLAH ( BELUM TERMASUK PPN )0.00.0JASA 10 %0.0JUMLAH0.0DIBULATKAN0.0791.0000m2Pasang kawat harmonika1.1000m2Kawat harmonika@ Rp.0.00.00.0200kgPaku biasa 1/2" - 1"@ Rp.0.00.00.0018m3Kayu kamper papan@ Rp.0.00.00.1000ohPekerja@ Rp.0.00.00.1000ohTukang kayu@ Rp.0.00.00.0100ohKepala tukang kayu@ Rp.0.00.00.0005ohMandor@ Rp.0.00.0JUMLAH ( BELUM PPN )0.00.00.0JASA 10 %0.0JUMLAH0.0DIBULATKAN0.0801.0000m1Memasang Pipa Galvanis 4"1.2000m1Pipa galvanis@ Rp.0.00.00.3500xHarga pipa (Perlengkapan)@ Rp.0.00.00.1350ohPekerja@ Rp.0.00.00.2250ohTukang batu@ Rp.0.00.00.0225ohKepala tukang batu@ Rp.0.00.00.0068ohMandor@ Rp.0.00.0JUMLAH ( BELUM TERMASUK PPN )0.00.00.0JASA 10 %0.0JUMLAH0.0DIBULATKAN0.0811.0000m1Memasang Pipa Galvanis 2"1.2000m1Pipa galvanis@ Rp.0.00.00.3500xHarga pipa (Perlengkapan)@ Rp.0.00.00.1080ohPekerja@ Rp.0.00.00.1800ohTukang batu@ Rp.0.00.00.0180ohKepala tukang batu@ Rp.0.00.00.0054ohMandor@ Rp.0.00.0JUMLAH ( BELUM TERMASUK PPN )0.00.00.0JASA 10 %0.0JUMLAH0.0DIBULATKAN0.0821.0000m1Memasang Pipa PVC tipe AW 4"1.2000m1Pipa PVC@ Rp.0.00.00.3500xHarga pipa (Perlengkapan)@ Rp.0.00.00.0810ohPekerja@ Rp.0.00.00.1350ohKepala tukang batu@ Rp.0.00.00.0135ohTukang batu@ Rp.0.00.00.0041ohMandor@ Rp.0.00.0JUMLAH ( BELUM TERMASUK PPN )0.00.00.0JASA 10 %0.0JUMLAH0.0DIBULATKAN0.0831.0000m3Membuat beton mutu fc = 19,3 MPa (K 225), slump (12 2) cm, w/c = 0,58371.0000kgPortland Cement@ Rp.0.00.00.4986m3Pasir beton@ Rp.0.00.00.7756m3Koral beton@ Rp.0.00.0215.0000LiterAir@ Rp.0.00.01.6500ohPekerja@ Rp.0.00.00.2750ohTukang batu@ Rp.0.00.00.0280ohKepala tukang@ Rp.0.00.00.0830ohMandor@ Rp.0.00.0JUMLAH ( BELUM PPN )0.00.00.0JASA 10 %0.0JUMLAH0.0DIBULATKAN0.08410.0000kgPembesian dengan besi polos10.5000kgBesi beton polos@ Rp.0.00.00.1500kgKawat beton@ Rp.0.00.00.0700ohPekerja@ Rp.0.00.00.0700ohTukang besi@ Rp.0.00.00.0070ohKepala tukang@ Rp.0.00.00.0040ohMandor@ Rp.0.00.0JUMLAH ( BELUM PPN )0.00.00.0JASA 10 %0.0JUMLAH0.0DIBULATKAN0.0851.0000m2Cetakan beton / begisting memakai multiplek0.0170m3Kayu meranti@ Rp.0.00.00.3470lbrMultiplek@ Rp.0.00.00.4000kgPaku@ Rp.0.00.00.2000ohPekerja@ Rp.0.00.00.5000ohTukang kayu@ Rp.0.00.00.0500ohKep. Tk. Kayu@ Rp.0.00.00.0100ohMandor@ Rp.0.00.0JUMLAH ( BELUM PPN )0.00.00.0JASA 10 %0.0JUMLAH0.0DIBULATKAN0.0861.0000m3Membongkar cetakan4.0000ohPekerja@ Rp.0.00.0JUMLAH ( BELUM PPN )0.00.00.0JASA 10 %0.0JUMLAH0.0DIBULATKAN0.0871.0000m3Mengerjakan beton bertulang Sloof 15 X 20 cmA.Beton cor (fc = 19.3 MPa)11m30.0B.Tulangan polos229.46kg0.0C.Cetakan memakai multiplek13.33m2 2 X pemakaian0.0D.Membongkar cetakan0.0JUMLAH0.00.0DIBULATKAN0.0881.0000m2Membongkar atap Asbes0.0500ohTukang Kayu@ Rp.0.00.00.1000ohPekerja@ Rp.0.00.0JUMLAH ( BELUM PPN )0.00.00.0JASA 10 %0.0JUMLAH0.0DIBULATKAN0.0891.0000m2Pasang Atap Asbes Gelombang ( 240 x 1.05 m ) X 4mm0.4400lbrAsbes Gelombang@ Rp.0.00.00.1200KgPaku Pancing 60 x 230@ Rp.0.00.00.1400ohPekerja@ Rp.0.00.00.0670ohTukang kayu@ Rp.0.00.00.0070ohKepala tukang@ Rp.0.00.00.0070ohMandor@ Rp.0.00.0JUMLAH ( BELUM PPN )0.00.00.0JASA 10 %0.0JUMLAH0.0DIBULATKAN0.0901.0000kgMemasang besi profil1.1500kgBesi profil@ Rp.0.00.00.0600ohPekerja@ Rp.0.00.00.0600ohTukang las konstruksi@ Rp.0.00.00.0060ohKepala tukang@ Rp.0.00.00.0030ohMandor@ Rp.0.00.0JUMLAH ( BELUM PPN )0.00.00.0JASA 10 %0.0JUMLAH0.0DIBULATKAN0.0911.0000unitMengerjakan pekerjaan kerangka parkir FSP (6.5 x 24 m)96.1200m1Pipa Galvanis 4"@ Rp.0.00.077.7600m1Pipa Galvanis 3"@ Rp.0.00.051.8400m1Pipa Galvanis 2 1/2"@ Rp.0.00.069.1200m1Pipa Galvanis 2"@ Rp.0.00.0156.0000m1Pipa Galvanis 2"(gording)@ Rp.0.00.0109.4400m1Pipa Galvanis 1 1/2"@ Rp.0.00.084.4800m1Besi beton polos 12@ Rp.0.00.028.5740m1Besi plat perkuatan tebal 10mm@ Rp.0.00.0125.0976m1Besi plat plendes tebal 10mm@ Rp.0.00.0436.8000m1Pipa Hollow 2/4cm@ Rp.0.00.00.3500xHarga pipa (Perlengkapan + las )@ Rp.0.00.0260.5200ohPekerja@ Rp.0.00.0260.5200ohTukang besi@ Rp.0.00.052.1040ohKepala tukang besi@ Rp.0.00.012.9480ohMandor@ Rp.0.00.0JUMLAH ( BELUM PPN )0.00.00.0JASA 10 %0.0JUMLAH0.0DIBULATKAN0.0911.0000unitMengerjakan pekerjaan kerangka parkir FSP (6.5 x 24 m)74.7600m1Pipa Galvanis 4"@ Rp.0.00.060.4800m1Pipa Galvanis 3"@ Rp.0.00.040.3200m1Pipa Galvanis 2 1/2"@ Rp.0.00.053.7600m1Pipa Galvanis 2"@ Rp.0.00.0120.0000m1Pipa Galvanis 2"(gording)@ Rp.0.00.082.0800m1Pipa Galvanis 1 1/2"@ Rp.0.00.063.3600m1Besi beton polos 12@ Rp.0.00.021.4305m1Besi plat perkuatan tebal 10mm@ Rp.0.00.093.8232m1Besi plat plendes tebal 10mm@ Rp.0.00.0336.0000m1Pipa Hollow 2/4cm@ Rp.0.00.00.3500xHarga pipa (Perlengkapan + las )@ Rp.0.00.0217.1000ohPekerja@ Rp.0.00.0217.1000ohTukang besi@ Rp.0.00.043.4200ohKepala tukang besi@ Rp.0.00.010.7900ohMandor@ Rp.0.00.0JUMLAH ( BELUM PPN )0.00.00.0JASA 10 %0.0JUMLAH0.0DIBULATKAN0.0921.0000unitMengerjakan pekerjaan kerangka parkir FSMR (6.5 x 27 m)106.8000m1Pipa Galvanis 4"@ Rp.0.00.086.4000m1Pipa Galvanis 3"@ Rp.0.00.057.6000m1Pipa Galvanis 2 1/2"@ Rp.0.00.076.8000m1Pipa Galvanis 2"@ Rp.0.00.0174.0000m1Pipa Galvanis 2"(gording)@ Rp.0.00.0123.1200m1Pipa Galvanis 1 1/2"@ Rp.0.00.095.0400m1Besi beton polos 12@ Rp.0.00.0174.0000m1Pipa Hollow 2/4cm@ Rp.0.00.00.3500xHarga pipa (Perlengkapan + las )@ Rp.0.00.0293.0850ohPekerja@ Rp.0.00.0293.0850ohTukang besi@ Rp.0.00.058.6170ohKepala tukang besi@ Rp.0.00.014.5665ohMandor@ Rp.0.00.0JUMLAH ( BELUM PPN )0.00.00.0JASA 10 %0.0JUMLAH0.0DIBULATKAN0.0931.0000unitMengerjakan pekerjaan Railling besi galvanis parkir FSMR57.1200m1Pipa Galvanis 1"@ Rp.0.00.080.7600m1Pipa Galvanis 2"@ Rp.0.00.00.3500xHarga pipa (Perlengkapan + las )@ Rp.0.00.045.0900ohPekerja@ Rp.0.00.045.0900ohTukang besi@ Rp.0.00.09.0180ohKepala tukang besi@ Rp.0.00.02.2410ohMandor@ Rp.0.00.0JUMLAH ( BELUM PPN )0.00.00.0JASA 10 %0.0JUMLAH0.0DIBULATKAN0.0941.0000unitMengerjakan pekerjaan kerangka Hollow 2/4(6.5 x 24 m)96.1200m1Pipa Hollow 2/4cm@ Rp.0.00.077.7600m1Pipa Galvanis 3"@ Rp.0.00.051.8400m1Pipa Galvanis 2 1/2"@ Rp.0.00.069.1200m1Pipa Galvanis 2"@ Rp.0.00.0156.0000m1Pipa Galvanis 2"(gording)@ Rp.0.00.00.3500xHarga pipa (Perlengkapan + las )@ Rp.0.00.0260.5200ohPekerja@ Rp.0.00.0260.5200ohTukang besi@ Rp.0.00.052.1040ohKepala tukang besi@ Rp.0.00.012.9480ohMandor@ Rp.0.00.0JUMLAH ( BELUM PPN )0.00.00.0JASA 10 %0.0JUMLAH0.0DIBULATKAN0.09510.0000cmMengerjakan pengelasan dengan las listrikSNI-20070.4000kgKawat las listrik@ Rp.0.00.00.3000ltrSolar@ Rp.0.00.00.0400ltrMinyak pelumas@ Rp.0.00.00.0400ohPekerja@ Rp.0.00.00.0200ohTukang besi konstruksi@ Rp.0.00.00.0020ohKepala tukang@ Rp.0.00.00.0020ohMandor@ Rp.0.00.00.1700JamSewa alat las@ Rp.0.00.0JUMLAH ( BELUM PPN )0.00.00.0JASA 10 %0.0JUMLAH0.0DIBULATKAN0.0961.0000m2Pengecatan bidang besi ( 3 x )SNI-20020.1670kgCat meni besi@ Rp.0.00.00.2000kgCat besi@ Rp.0.00.00.1500ltrThinner@ Rp.0.00.00.0700ohPekerja@ Rp.0.00.00.1050ohTukang cat@ Rp.0.00.00.0040ohKepala tukang cat@ Rp.0.00.00.0025ohMandor@ Rp.0.00.0JUMLAH ( BELUM PPN )0.00.00.0JASA 10 %0.0JUMLAH0.0DIBULATKAN0.0971.0000m2Memasang kawat anyam galvanis plepet baja stripSNI-20071.1000m2Kawat anyam galvanis@ Rp.0.00.011.1100cmPengelasan@ Rp.0.00.01.7160kgBaja strip (0,2 x 2) cm@ Rp.0.00.00.1000ohPekerja@ Rp.0.00.00.1000ohTukang besi@ Rp.0.00.00.0100ohKepala tukang@ Rp.0.00.00.0050ohMandor@ Rp.0.00.0JUMLAH ( BELUM PPN )0.00.00.0JASA 10 %0.0JUMLAH0.0DIBULATKAN0.0981.00m2Pasang Atap genteng bitumen sekualitas "Ondulline ", colourAK0.7519lbrGenteng bitumen@ Rp.0.00.08.27bjPaku Onduviila@ Rp.0.00.00.0996ohPekerja@ Rp.0.00.00.1500ohTukang kayu@ Rp.0.00.00.0150ohKepala tukang@ Rp.0.00.00.0048ohMandor@ Rp.0.00.0JUMLAH ( BELUM PPN )0.00.00.0JASA 10 %0.0JUMLAH0.0DIBULATKAN0.0991.00m1Pasang Atap nok genteng bitumen sekualitas "Onduvilla ", colourAK1.2000lbrnok genteng bitumen@ Rp.0.00.016.00bjPaku Onduviila@ Rp.0.00.00.0498ohPekerja@ Rp.0.00.00.0750ohTukang kayu@ Rp.0.00.00.0075ohKepala tukang@ Rp.0.00.00.0024ohMandor@ Rp.0.00.0JUMLAH ( BELUM PPN )0.00.00.0JASA 10 %0.0JUMLAH0.00.0DIBULATKAN0.0

&LAnalisa&C&P

BahanDAFTAR HARGA SATUAN BAHAN BANGUNANINSTANSI:INSTITUT SENI INDONESIA YOGYAKARTAPEKERJAAN:PERENCANAAN PEMBANGUNAN PRASARANA LINGKUNGAN ISI YOGYAKARTALOKASI:ISI YOGYAKARTATAHUN:2013NO.URAIAN BAHANSATUANHARGA SATUAN (Rp.)1Print outdoor flexim20.0``2Cat besi se kualitas Emco biasakg0.03Cat dasar meni besi type A (cepat kering) Jagokg0.04Thinerltr0.05Batu Coral putihm30.06Conblock Tipe segi empat (holland/balok) tebal = 6 cm K 225m20.07Conblock Tipe segi enam (holland/balok) tebal = 6 cm K 225m20.08Devider /kans teen tebal 20 Mutiarabh0.09Dolken Kayu 8 - 10/400 cmbtg0.010Kayu Balok Borneom30.011Kayu merantim30.012Kayu lapis mutu I AA 3 lapis uk. 122x244x0,9 cmlbr0.013Multipleks tebal 9 mm 4 x 8 (inch)lbr0.014Multipleks tebal 6 mm uk. 1.22 x 2.44 (inch)lbr0.015Pakukg0.016Besi Stripkg0.017Seng Platlbr0.018Jendela nako (rangka + kaca 5 mm)bh0.019Kaca Polosm20.020Plywood 4 mmlbr0.021Besi beton poloskg0.022Kawat beton / bindratkg0.023Besi Siku (L) 30.30.3kg0.024Batakobh0.025PakuKg0.026Paku usuk 80 x 3,8 mmkg0.027Paku reng 55 x 3,1 mmkg0.028Engsel pintubh0.029Engsel jendelabh0.030friction staybh0.031Tanah Urugm30.032tanah urug suburm30.033Sirtum30.034batu tempel hitamm20.035Coating Glossltr0.036Batu Ampyang putihm20.037Batu belah hitamm30.038Pasir urugm30.039Pasir pasang krasakm30.040Pasir betonm30.041Krikil beton biasam30.042Kerikil tidak tersaringm30.043Batu merahbj0.044Portland Cement (PC) Holcim50kg0.045Semen warnakg0.046Pipa PVC abu-abu dia. 3/4" Wavinbtg0.047Pipa PVC abu-abu dia. 1" Wavinbtg0.048Pipa PVC abu-abu dia. 1 3/4" Wavinbtg0.049Pipa PVC abu-abu dia. 2" Wavinbtg0.050Pipa PVC abu-abu dia. 3" Wavinbtg0.051Pipa PVC abu-abu dia. 4" Wavinbtg0.052Pipa PVC abu-abu dia. 5" Wavinbtg0.053Pipa galvanis dia. 1"m10.054Buis beton D. 80 cmbh0.055Sewa Scaffoldingunit0.056Airltr0.057Pohon Beringinbtg0.058GensetJam0.059Dump TruckJam0.060CompresorJam0.061Kuasbh0.062Bambubtg0.063Ijukkg0.064Tanah taman(subur)m30.065Pengadaan dan Penanaman Tanaman Asoka t= 1mbtg0.066Pengadaan dan Penanaman melatibh0.067Pengadaan dan Penanaman Asoka T= 1Mbh0.068Pengadaan dan Penanaman Bugenvill T= 1.5Mbtg0.069Pengadaan dan Penanaman melati Belandabh0.070Pengadaan dan Penanaman Lidah Mertuabh0.071Pengadaan dan Penanaman Pucuk Merah t = 1.5 - 2mbtg0.072Pengadaan dan Penanaman Biola Cantik t= 3 - 4 mbh0.073Pengadaan dan Penanaman Rumput Manilam20.074Pengadaan dan Penanaman Rumput Gajah Minim20.075Pengadaan dan Penanaman pohon Palm Putri t= 1.5-2mbtg0.076Pengadaan dan Penanaman pohon Palm Kuning t= 1mrmpn0.077Pengadaan dan Penanaman Teh-tehan t= 0.5mrmpn0.078Alumunium 4" (4x10 cm) Sekualitas YKKm'0.079Alumunium 5"X1.75" Sekualitas YKKm'0.080Kayu jati papan 20 cm t=2 cmm30.081Kayu bengkirai papan 20 cmm30.082HPL EX Violamlbr0.083Engsel pintubh0.084Handle pintubh0.085Kunci tanam biasabh0.086Kaca bening 5 mmm20.087Kaca buram/kaca es 5 mmm20.088karet kacam10.089Plat alumunium t=1mmm20.090Pipa galvanis dia. 2,5" tebal 3,2 mmm10.091Pipa galvanis dia. 3" tebal 3,2 mmm10.092Genteng bitumen gelombang exs "Ondulline"m20.093nok genteng bitumenml0.094Paku Onduviilabj0.095Sewa alat lasjam0.096Kawat las listrikkg0.097Solarltr0.098Minyak pelumasltr0.099Memasang Pipa Galvanis 1"m10.0100Memasang Pipa Galvanis 1,5"m10.0101Memasang Pipa Galvanis 2,5"m10.0102Memasang Pipa Galvanis 2"ml0.0103Memasang Pipa Galvanis 3"m10.0104Memasang Pipa Galvanis 3,5"m10.0105Memasang Pipa Galvanis 4"ml0.0106Pipa Hollow 2/4cmml0.0107Besi Plat 5 mmm10.0108Baja strip (0,2 x 2) cmkg0.0109Pasir pasang ( progo )m30.0110Krikil beton biasam30.0111Besi beton poloskg0.0112Besi beton Ulirkg0.0113Besi baja profilkg0.0114Kawat beton / bindratkg0.0115Pasir urug daratm30.0116Kayu kamper papanm30.0117Kayu lapis mutu I AA 3 lapis uk. 122x244x0,9 cmlbr0.0118Paku plepet 40 x 2,1 mmkg0.0119Kawat harmonikam20.0120Kawat anyam galvanism20.0121Besi baja profilkg0.0122Batu belah hitamm30.0123Airltr0.0124Kran Air 3/4bh0.0125Pipa PVC putih dia. 3/4" Wavin/mgalonebtg0.0126Besi beton poloskg0.0127Asbes Gelombang ( 240 x 1.05 m ) X 4mmlbr0.0128Paku Pancing 60 x 230kg0.0

&LBahan&C&P

UpahDAFTAR HARGA SATUAN UPAH DAN BAHANINSTANSI:INSTITUT SENI INDONESIA YOGYAKARTAPEKERJAAN:PERENCANAAN PEMBANGUNAN PRASARANA LINGKUNGAN ISI YOGYAKARTALOKASI:ISI YOGYAKARTATAHUN:2013NO.URAIAN TENAGASATUANHARGA SATUAN (Rp.)1Tukang kayuhari0.02Kepala tukang kayuhari0.03Tukang batuhari0.04Kepala tukang batuhari0.05Tukang besihari0.06Kepala tukang besihari0.07Tukang cathari0.08Kepala tukang cathari0.09Tukang listrikhari0.010Tukang galihari0.011Tukang lashari0.012Kepala Tukang Lashari0.013Pekerjahari0.014Mandorhari0.015Pengawas / Ahli Teknikhari0.016Asisten ahli ukurhari0.0

&LUpah&C&P