Summary Bill Group AMOUNT IN USDBill 1 General 0.00 Bill 2 Site Clearance 0.00 Bill 3 Drainage 0.00 Bill 4 Earthworks 0.00 Bill 5 Gravel Wearing Course 0.00 Bill 8 Structures 0.00 Bill 9 Ancillary 0.00 0.00PSProvisional sum (Insurance ) 18,000.00 Bill 10 Dayworks 0.00 18,000.000.0018,000.00BOQ - Rehabil itati on of Yambio-Nabiapai RoadGrand TotalSubtotalGrand total for bill itemsConti ngency - 2.5% [to be expended in whol e or i n partat the discretion of the Engineer] Summar y of Estimated Construction Cost
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
8/11/2019 BOQ roadwork
http://slidepdf.com/reader/full/boq-roadwork 1/14
Summary Bill GroupAMOUNT IN USD
Bill 1 General 0.00
Bill 2 Site Clearance 0.00
Bill 3 Drainage 0.00
Bill 4 Earthworks 0.00
Bill 5 Gravel Wearing Course 0.00
Bill 8 Structures 0.00
Bill 9 Ancillary 0.00
0.00
PS Provisional sum (Insurance ) 18,000.00
Bill 10 Dayworks 0.00
18,000.00
0.00
18,000.00
BOQ - Rehabil itati on of Yambio-Nabiapai Road
Grand Total
Subtotal
Grand total for bill items
Contingency - 2.5% [to be expended in whol e or in
part
at the discretion of the Engineer]
Summar y of Estimated Construction Cost
8/11/2019 BOQ roadwork
http://slidepdf.com/reader/full/boq-roadwork 2/14
1000 GENERAL
121200 GENERAL REQU
12.01Provision, erection, main
board as indicated in the
Engineer.
1300 CONTRACTOR
13.01
The contractor's general
of the establishment of th
equipment ,personnel, co
and construction plant on
completion of the contra
risks, legal,security arran
and general items of cost
161600 ENVIRONMENT
MITIGATION MEASU
16.01Environmental Protectio
TOTAL FOR BILL 1,
Bill 1,Genera
Bill 1,General Provisions
8/11/2019 BOQ roadwork
http://slidepdf.com/reader/full/boq-roadwork 3/14
Rate Amount
USD USD
2000 SITE CLEARANCE
21 2100: CLEARING AND GRUBBING
21.01 Clearing and grubbing ha 8 0.00
21.02Removal and grubbing of large trees and tree stumps
(a) Girth exceeding 1.0 m up to and including 2 m No. 385 0.00
(b) Girth exceeding 2 m up to and including 3m No. 150 0.00
(c) Girth exceeding 3 m and more No. 30 0.00TOTAL FOR BILL 2, 2000 Site Clearance (carried to
summary) 0.00
Description
Bill 2, Site Clearance
BOQ - Rehabilitation of Yambio-Nabiapai Road
Bil l of Quantity
Unit
Yambio-Nabiapai
Qty.
Bill 2, Site Clearance
Pay Item
No.
8/11/2019 BOQ roadwork
http://slidepdf.com/reader/full/boq-roadwork 4/14
Rate Am
USD US
3000: DRAINAGE
31 3100: DRAINS
31.01 Excavation for open drains
(a) Common/normal and intermediate excavation or shaping of open drains (intercepting
ditches, turn-outs, culvert in-/outlet drains, etc.) in all typeof soi l material of all class within
any depth rates below the surface level, loading and hauling, and re-use in embankments incl.
spreading, shaping and compaction to 95% of modified AASHTO density including all lead
and lift within the project.
M3
8,500
32 3200: CULVERTS AND APPURTENANT STRUCTURES
32.01
Common/normal and intermediate excavation of trench within any depth rates below the
surface level for foundation at new pipe culvert location or for replacement of existing culvert
and for inlet and outlet structures incl. trimming/compaction of bottom of excavation, backfill
with suitable material from the excavation and compaction, disposal of surplus and unsuitable
material.
M3
230
32.02 Provide approved material for backfill at culvert location and compact incl.
trimming/compaction of bottom of excavation.
(a) Using the excavated material M³ 216
(b) Using imported selected material M³ 505
32.03 supply, Installation, and placement of precast reinforced concrete pipe culvert 900mm
diameter, with details shown on the drawings
M
84
32.05 Provide and construct apron/slab with cut-off wall (toe wall), and head and wing walls at box
culverts and slab culvert including all ancillary works:
(a) Concrete Class 30/20 for apron/slab and cut-off wall (toe wall);M3
10
(b) High yield reinforcement steel for apron/slab and cut-off wall (toe wall) (Grade 60)t
1
(c) Cement-mortared (1:3) medium pointed Class A stone masonry for head and wing walls of
slab culvert and/or driftsM3
20
34 3400: Pitching, Stonework, And Erosion Protection
34.01Provide and construct cement-mortared 1:4 fine pointed Class A stone masonry for cascades,
inlet and outlet structures for concrete pipe culverts, and where instructed including
foundation and all ancillary works
M³
108
TOTAL FOR BILL 3, 3000 DRAINAGE (carried to summary)
BOQ - Rehabilitation of Yambio-Nabiapai Road
Bill of Quantity
Bill 3, Drainage
Bill 3, Drainage
Qty.
8/11/2019 BOQ roadwork
http://slidepdf.com/reader/full/boq-roadwork 5/14
Rate Amount
USD USD
4000 EARTHWORKS
41.04
Removal of unsuitable (unstable) material in roadbed to any depth asinstructed by the Engineer incl. loading, hauling, deposit, spreading,
etc., and provision, placing and compaction of approved material for
backfill.
M³
7,000 0.00
43 4300: Borrow Materials
43.01 Embankment Fill of approved Borrow material with all lift and free
haul within the project, all complete.M³
10,500 0.00TOTAL FOR BILL 4, 4000 EARTHWORKS 0.00
Bill 4, Earthworks
BOQ - Rehabilitation of Yambio-Nabiapai Road
Bil l of Quantity
Bill 4, Earthworks
Pay Item
No.Description Unit
Yambio-Nabiapai
Qty.
8/11/2019 BOQ roadwork
http://slidepdf.com/reader/full/boq-roadwork 6/14
Rate Amount
USD USD
54 5400: GRAVEL WEARING COURSE
54.01
Gravel Wearing Course of approved material all complete, compacted
to 98% of AASTHO modified density as specified in Job SpecificTechnical Specification. M³ 10,500 0.00
TOTAL FOR BILL 5 (carried to summary) 0.00
BOQ - Rehabilitation of Yambio-Nabiapai Road
Bil l of Quantity
Bill 5, Gravel Wearing Course
Bill 5, Road Base/Base course and Sub base
Qty.
8/11/2019 BOQ roadwork
http://slidepdf.com/reader/full/boq-roadwork 7/14
Item Description UnitRate
USDQuantity
Am
U
Division 8100
Structure Excavation
81.02 (a)
Excavation of all type of soil material required for the
foundation of structure, and for the portion of existing
structure to be demolished, extended or modified
including backfilling with approved local materials all
complete in layers of 150 mm or as instructed by the
Engineer. cu. m. 150.00
Division 8300
83.01
Supply, installation and placement of reinforcing steel
bars, Grade 60 for concrete structures as shown in
drawings which shall confirms to the requirements of
AASHTO M31 (ASTM A615) ton 0.50
Division 8400
84.01 (a)
Class 30/20 cast in situ reinforced concrete works for
slab bridges/culverts as per dimensions shown in
drawings and in accordance with the provisions of series
8000 of the specification and special provisions to
specification. cu. m. 10.00
89.01
Provide and construct cement-mortared (1:4) fine pointed
Class A stone masonry for abutment and wing walls of
major structures cu. m. 10.00
Provide and place hand laid rock to 0.30m behind
abutment and wing walls cu. m. 10.00
Total Bill No :8
BOQ - Rehabilitation of Yambio-Nabiapai Road
Bill 8: Structures
For UNOPS
Project Engineer:
Project Manager
Page No.(9)
8/11/2019 BOQ roadwork
http://slidepdf.com/reader/full/boq-roadwork 8/14
Rate
USD
9000 ANCILLARY WORKS
91 GABIONS
91.01
Delivery, assembly, installation and rock filling of Standard sized Gabion Boxes, including the preparation of
the foundation and surface for bedding, as per standard specifications or instruction from the Engineer. M³
9400: ROAD SIGNS
94.01
Provide and erect where shown on Drawings and/or where instructed new galvanized steel plate road signs of
high intensity grade reflective sheeting on standard single reinforced concrete sign posts (alternatively hot dip
galvanized steel pipe with internal diameter of 75mm can be used for the sign post)