Pick-Up Order Lead Time Project Storyboard The Bahama Bistro Sample Storyboard Visit GoLeanSixSigma.com for more Lean Six Sigma Resources
27

Black Belt Project Storyboard Template Example

Apr 15, 2017

Download

Education

Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Black Belt Project Storyboard Template Example

Pick-Up Order Lead Time Project Storyboard

The Bahama Bistro Sample Storyboard

Visit GoLeanSixSigma.com for more Lean Six Sigma Resources

Page 2: Black Belt Project Storyboard Template Example

Executive Summary

Page 3: Black Belt Project Storyboard Template Example

Key Words(Specific to the Bahama Bistro)

• Pick-Up Order Lead Time: Total cycle time from the moment the customer places their order to the moment they receive their food.

• Packaging Process: All tasks related to placing food into take-out containers, selecting utensils, napkins and condiments and then placing them all into a bag

• Pick-Up Wait Time: The cycle time from the moment a Pick-up customer walks in the door to the moment their order is made available to them

• Condiments: Mini-bottles of hot sauce, limes, salt and pepper

Page 4: Black Belt Project Storyboard Template Example

Project Charter

Page 5: Black Belt Project Storyboard Template Example

VOC Translation Matrix

Key Take Away: Project needs to address overall Lead time which will impact customer wait time as well as food temperature

Page 6: Black Belt Project Storyboard Template Example

SIPOC: Pick-Up Order Process

Key Take Away: The scope of this project goes from the point of receiving the customer order to the point at which food is available

Page 7: Black Belt Project Storyboard Template Example

Detailed Map – Pick-Up Process

Key Take Away: The process needs more analysis – packaging segment seems to take longer than expected

Page 8: Black Belt Project Storyboard Template Example

Data Collection Plan

Key Take Away: Cashier was largely responsible for all data collection – the team adjusted job duties to accommodate

Page 9: Black Belt Project Storyboard Template Example

Gage R&R: Pick-Up Order Wait Time

Key Take Away: The measurement system variation was less than 10% for collection of wait time data – Measurement Systems were good!

Page 10: Black Belt Project Storyboard Template Example

Baseline Data• Total Pick-up Order Cycle Time• Average time is 27 minutes

Key Take Away: The baseline process was not capable of reaching project goal of 20 minutes

Goal of 20 minutes

Page 11: Black Belt Project Storyboard Template Example

Fishbone Diagram & 5 Whys

Key Take Away: Root Cause Analysis will focus on Packaging process, condiment prep and availability of staff

Page 12: Black Belt Project Storyboard Template Example

Process Map Analysis

Key Take Away: Mapping highlighted packaging as a potential root cause of pick-up order delay

Page 13: Black Belt Project Storyboard Template Example

One-Sample T-Test

Key Take Away: Packaging pick-up orders was taking longer than 6 minutes. Improvement focused on the packaging process

Null: There is no difference between the current process and the 6 minute historic averageAlternative: The current average is not equal to the historic average

Page 14: Black Belt Project Storyboard Template Example

Hypothesis Testing Results

Key Take Away: Hypothesis tests confirmed that the process has gotten worse and that packaging was a key area of focus

Page 15: Black Belt Project Storyboard Template Example

Impact Effort Matrix

Key Take Away: The team planned to implement the three solutions in the low effort/high impact quadrant

Page 16: Black Belt Project Storyboard Template Example

To-Be Map Segment

Key Take Away: Improvements to materials, process and cross-training resulted in faster lead time overall

Page 17: Black Belt Project Storyboard Template Example

Before & After Time Data

Key Take Away: Implemented solutions decreased total cycle time and achieved project goal of less than 20 minutes

Page 18: Black Belt Project Storyboard Template Example

Implementation Plan

Key Take Away: This implementation Plan was key in terms of all team members knowing their role in the roll-out

Page 19: Black Belt Project Storyboard Template Example

Packing Type DOE

Key Take Away: This Design of Experiments was instrumental in selecting the new Pick-Up order packaging

Page 20: Black Belt Project Storyboard Template Example

Risk Management

Key Take Away: Cross-Training mitigated the risk of overloading the chef during peak hours

Page 21: Black Belt Project Storyboard Template Example

Monitoring & Response Plan

Key Take Away: The monitoring plan factors in both the leading indicators of packaging time and customer wait time along with the project “Y”

Page 22: Black Belt Project Storyboard Template Example

Control Chart of Project Y

Key Take Away: The team is continuing to work on the special causes of variation – and the Upper Control Limit of 23 minutes is the Response Plan trigger

Page 23: Black Belt Project Storyboard Template Example

Transfer Opportunities

Key Take Away: The improvements implemented at one location can easily be translated to other locations – time to spread the wealth!

Page 24: Black Belt Project Storyboard Template Example

Appendix

Page 25: Black Belt Project Storyboard Template Example

Wait Time Hypothesis Test

Key Take Away: There was a difference between the historical median and the current median for customer wait time – it was taking longer!

Page 26: Black Belt Project Storyboard Template Example

Communication Plan

Key Take Away: The Communication Plan was instrumental in making sure everyone knew what was happening with the project at all times

Page 27: Black Belt Project Storyboard Template Example

P- Chart of “Late” PackagingProportion of Late Packaging – June

Key Take Away: The P-Chart turned out to be the best visual for Packaging time – by deriving discrete data from continuous data the positive trend was obvious