Six Sigma Project Presentation Project Title: Green Belt (Name):
Six Sigma Project Presentation
Project Title: Green Belt (Name):
Page 2
Six Sigma DMAIC Methodology
Define Identify Project CTQs Y to X drill down. Project CTQs Develop Team Charter Approved Charter Overview Map High Level Process Map, SIPOCMeasure Select CTQ Characteristics Y Project Y Define Performance Standards Y Customer, Performance Standard for Project Y
Measurement System Analysis Y Attribute R&R, Capability Indices Approved Measurement System Identify X’s Detailed Mapping, Fishbone Process Capability for Project Y
Pareto, FDM Prioritized List of all XsAnalyze Establish Process Capability Y Define Performance Objectives Y Benchmarking, Brainstorming Improvement Goal for Project Y
Identify Vital X’s X Graphical Analysis, FMEA List of Vital Few Xs Hypothesis Tests, Regression
Improve Screen Potential Causes X Brainstorming, Discover Variable Relationships X Regression, Proposed Solution Establish Operating Tolerances Y, X Simulation, Pilot Piloted Solution
Control
MSA for X Y, X Test/Retest, Attribute R&R Verified Measurement System onXs in Actual Application
Process Capability Y, X Capability Indices Process Capability Y, XImplement Process Control X Control Charts, Sustained Solution,
Mistake Proof, FMEA Documentation
Step Description Focus Tools Deliverables
Page 3
Contents
Define Phase - Business Case.
Define Phase - Team Structure.
Define Phase - Key elements of the charter.
Define Phase - COPIS and process overview flow.
Measure Phase – Measurement system assessment. Measure Phase - Current Performance and Target Performance.
Measure Phase - Identification of X’s - Tools used and key findings.
Measure Phase - Identified X’s and prioritized list.
Analyze Phase - Tools used and key findings.
Analyze Phase - List of Vital X’s
Improve Phase - Tools used and key results.
Control Phase - Tools used to ensure sustenance of improvements..
Page 4
Project: Charter - Business Case
Planned Start Date: Planned Closure :
Business Case (Compelling Reasons for doing the project)
What if we don’t do this project?Explain what are the consequences/ losses if this project is not done.
What if we do this project?Explain the benefits.
Why this project and why not some other?Explain why this project is more appropriate than others.
Page 5
Team, Mentor, Customers, Stakeholders & Sponsors:Sponsor (s):
Champion (s):
Team Leader (Green Belt):
Team Members :
Team Members – Others (Extended Team): Customer (s): Stake Holder (s):
Project: Charter - Team
Page 6
Problem Statement: Objective Statement:
AS IS (Current Status):
TO BE (Desired Status):
“IN” Scope “Out of” Scope
Project: Charter – Problem, Objective, SCOPE
Page 7
Big Y: (Organization Strategic Intent) –
Small Y (Division or Function Key Result Area):
Present Cost of Operations• Prevention: • Appraisal: • Failure: • Opportunity: • Cash Flow:• Productivity
Future Cost of Operations:• Prevention: • Appraisal: • Failure: • Opportunity: • Cash flow• Productivity
Investments (Annualized)• Training: • Software: • Time of Resources: • Others:
Projected Savings:
Project: Charter – ROI
Page 8
Approver Role Name DateApproval
Champion/Sponsor
Mentor (MBB/BB if any)
Review Sign OffsReview of Phase Date Mentor Sponsor Champion
.• Define: • Measure: • Analyze: • Improve/Design• Control/Verify • Closure
Project: Charter – Reviews and Approvals
SC PO I
C O P I S
Fill up these text boxes
Process Overview – Flow
Fill up these text boxes
Fill up these text boxes
Fill up these text boxes
Fill up these text boxes
Fill up these text boxes
Fill up these text boxes
Fill up these text boxes
Fill up these text boxes
Page 10
Methodology Used for Estimating Financial Benefits
Explain here what methodology is used to calculate financial benefits. In case benefits are intangible, explain why it still makes sense to go ahead with the project.
Page 11
Measure Phase - Measurement System Analysis (How did you verify data reliability?)
Page 12
CTQ Definitions CTQ :Specification Limits :Unit : Opportunities for Error Per Unit:Defect :USL : LSL :
Present Performance(Underlined Items applicable only For Continuous Data)Mean :Median : Std. Deviation :
DPU : DPMO : Sigma Level (Z) :
Target Performance (Underlined Items applicable only For Continuous Data)Mean :Median :Std. Deviation :
DPU : DPMO : Sigma Level (Z) :
Measure Phase - Current performance and target performance
Page 13
Measure Phase – Current performance and target performance
If you have used measures other than sigma level, mention here.
Page 14
Measure Phase – Identification and prioritization of X’s - Summary along with techniques used (use multiple slides as required)
Page 15
Measure Phase Key findings (Identified X’s and the prioritized list)
Page 16
Analyze Phase – Summary along with techniques used (use multiple slides as required)
Page 17
Analyze Phase – Key Findings (List of Vital X’s)
Page 18
Improve Phase – Summary along with techniques used (use multiple slides as required)
Page 19
Improve Phase – Key Results
Page 20
Control Phase – Summary along with techniques used (use multiple slides as required)
Page 21
Control Phase –
How did you verify/ensure sustenance of improvements?