Page 1: Batubara Project

8/8/2019 Batubara Project

http://slidepdf.com/reader/full/batubara-project 1/8

Efficiency using of Batubara

 April 2010 ~ June 2010

Page 2: Batubara Project

8/8/2019 Batubara Project

http://slidepdf.com/reader/full/batubara-project 2/8

1st Project (improved)

Replacement from Solar to Batubara

Production

Oct ± Dec 2009

Solar Batubara Per pcs

7.862.459 pcs 720.000 lt / Rp.

471.600.000

- Rp. 64.56

Production

Jan ± Mar 2010

Solar Batubara Per pcs

8.344.295 pcs - 1.906.000 kg /

Rp. 157.245.000

Rp. 18.84

Efficiency

Rp. 64.56 ± Rp. 18.84 = Rp. 45.72 / pcs

Page 3: Batubara Project

8/8/2019 Batubara Project

http://slidepdf.com/reader/full/batubara-project 3/8

2nd Project

Define

 Assessment Scope :

Energy usage in Factory Objective :

Effisiensi penggunaan batubara

 Area :

Boiler M/C Dada Indonesia Time :

 April 2010 ~ June 2010

Page 4: Batubara Project

8/8/2019 Batubara Project

http://slidepdf.com/reader/full/batubara-project 4/8

Team Member

Energy Director : J.H. Lee

Leader Team : Robi Lean

Member : Sandi Compliance

Melinda Compliance

Sugeng Mechanic F5

Suherman Mechanic F1&2

Dadang Mechanic F3

Sunarto Mechanic Embroidery

Page 5: Batubara Project

8/8/2019 Batubara Project

http://slidepdf.com/reader/full/batubara-project 5/8

Measure

Date Qty ( Kg ) Price / Kg Total

05 Jan 2010 30000 825 24.750.000

20 Jan 2010 30000 825 24.750.000

28 Jan 2010 30000 825 24.750.000

13 Feb 2010 25000 825 20.625.000

23 Feb 2010 29500 825 24.337.500

18 March 2010 22000 825 18.150.000

23 March 2010 24100 825 19.882.500

Total 1.906.000 157.245.000

Data Pembelian Batu bara untuk penggunaan 2010

 Average penggunaan batu bara per bulan = 635 ton / Bulan

Page 6: Batubara Project

8/8/2019 Batubara Project

http://slidepdf.com/reader/full/batubara-project 6/8

Measure Facta Problem dlm penggunaan Batubara

Page 7: Batubara Project

8/8/2019 Batubara Project

http://slidepdf.com/reader/full/batubara-project 7/8

Measure

Fakta kondisi penggunaan Batu baraGauge tidak ada Steam TR AP Tdk Berfungsi Qualitas Batubara kurang

bagus

Problem Effect

No gauge Tidak bisa kontrol kebutuhan steam

Steam trap error Sirkulasi untuk pembuangan air tidakotomatis sehingga sirkulasi steamterhambat

Size batu bara terlalu kecil Batubara kecil tdk terbakar karena

tebuang lolos dalam bak penyaringan

Page 8: Batubara Project

8/8/2019 Batubara Project

http://slidepdf.com/reader/full/batubara-project 8/8

Analysis

Problem Fact Idea PIC D/D

Man Tidak ada training khusus untuk operator  

Mesin boiler dalam pemakainabatu bara

Machine Tidak ada TPM Training TPM dan membuat SOP TPM Robi / Sandi 31Apr 

Machine Pemasangan pipa untuk Fty 3 dan 5 Memisahkan pipa khusus Fty 3 dan 5 Sugeng /Dadang

30 Juni

Machine Tidak ada steam gauge Melakukan pemasangan steam gauge Suherman /Sunarto

30 Juni

Machine Steam trap tidak berfungsi Perbaikan / mengganti steam trop Suherman /

Dadang30 Juni

Methode Tidak ada jadwal atau informasi jam kerjauntuk pemakaian steam

Bekerja sama dengan tim PPIC untukmenginformasikan jam kerja harian ke Dept boiler 

Robi / Sandi 30 Mei

Methode Tidak ada standar waktu kapan batubaraharus dimasukan kedalam tungku

 Analisa dan membuat SOP Sandi / Dadang 30 April

Measure Tidak ada data pemakaian batubara per    jam (tersedia hanya data harian)

 Analisa ...... Robi / Sandi 30 April

Measure Tidak ada data batu bara yang reject Analisa dan melakukan pengukuran Melinda 30 April

Material Kualitas batu bara tidak 100% bagus Claim to suplier Melinda / Sandi 30 April