It is always recommended to anchor the unit in to the ground. Drill through the four holes in the base of the unit using 6mm dia masonry drill to a depth of 70mm. Screw in the anchor fixings. (These have a self cutting thread). If not anchoring the unit, fit the self seal plugs BEFORE BUILDING to block the fixing holes from underneath. TOOLS REQUIRED Power driver POSI-DRIV screwdriver, 6mm dia. masonry drill and a 13mm socket or spanner. ACCESS ZSCREW32 x4 ZSCREW381 x12 ZSCREW100 x60 ZSCREW340 x12 41843 x1 /41844 x1 ZHWMISC89 x2 ZHWHANDLE32 x1 ZSCREW42 x4 41459 x4 41824 x2 41459 x4 6mm Dia. Posi-Driv Screwdriver 13mm Spanner 18V ZCOMPPLZS02 x4 ZCOMPPLAS22-23-24 x12 4x 2mm, 4x 3mm, 4x 5mm BASE PANEL 40966 x1 LH BACK PANEL 41341 x1 RH BACK PANEL 41342 x1 RH SIDE PANEL 41331 x1 LH SIDE PANEL 41329 x1 LH FRONT PANEL 41452 x1 RH FRONT PANEL 41453 x1 RH DOOR S/A 41350 x1 LH DOOR S/A 41348 x1 LID S/A 40961 x1 BASE INSTRUCTIONS Flat and firm base. Recommended: concrete, tarmac or paving flags. Min. distance from walls/ shrubbery: 1000mm. Min. base size (WxDxH) 2200mm x 1150mm x 50mm. LEVELING THE UNIT Correctly level the constructed unit using the shims (ZCOMPPLAS) provided prior to fixing the unit to the ground. Slide the packing pieces under the corners of the unit base as required until an equal gap has been achieved around the door allowing for its smooth operation and alignment. For maintenance instructions of this product visit www.asgardsss.co.uk x2 Warning: some panels may weigh over 20Kg. Beware of manual handling ZHWNUT41 x12 ZSCREW43 x10 2x 70mm disc padlocks required. Not supplied. Keys alike recommended.