Top Banner

of 15

Art.ESierra-ETP 0MANTENIMIENTO.pdf

Jun 04, 2018

Download

Documents

Omar Galarza
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
  • 8/14/2019 Art.ESierra-ETP 0MANTENIMIENTO.pdf

    1/15

    Notes: MANTENIMIENTO is the most important Spanish technical journal about Maintenance.

    This journal is published by AEM Asociacin Espaola de Mantenimiento (Spanish

    Manitenance Asociation) which belong spanish utilities like IBERDROLA or UNION FENOSA ,

    heavy industries like REPSOL or CEMENTOS MOLINS and important repair workshops like

    Talleres PETIT (SARELEM).

  • 8/14/2019 Art.ESierra-ETP 0MANTENIMIENTO.pdf

    2/15

  • 8/14/2019 Art.ESierra-ETP 0MANTENIMIENTO.pdf

    3/15

    Condition Based Maintenance in

    Transformers

    ETP METHODEmilio Sierra Gmez

    Iberdrola Generacin, S.A.

    The normal operation of transformers can be afected by several external factors.

    Diagnostics systems are based onperiodical tests performace which have the aim todetermine when and where is going to appear alterations that afect in abnormal way

    to some of transformer components.

    This Condition Based Maintenance will allow us to detect incipient transformer

    problems before of breakdown occur, allowing us:

    To avoid urgent performances. To avoid high costs of repair and transport.

    To avoid unavailabilities of long duration.

    Optimization of hours men.

    Diagnostic and evaluation systems could be:

    Electrical

    Physical-Chemical.

    MantenimientoJulio-Agosto 2001

  • 8/14/2019 Art.ESierra-ETP 0MANTENIMIENTO.pdf

    4/15

    The transformer diagnostic system developed by Unitronics and IBERDROLA, ETP

    SYSTEM, performes the necessary tests to detect and to confirmany problem in

    each part of the transformer, it means that the ETPdetermines the current status of

    each part of the tranformer:

    Solid and liquid insulation.

    Windings.

    Tap changer.

    Magnetic core.

    Transformer status knowledge will allow us to programme the most suitable actions:

    To continue in service.

    To limit functions.

    Specific reviews.

    To repair or to substitute

    2.-ETP TRANSFORMER EVALUATION SYSTEM.

    This system can be applicated to all kind of transformer or autotransformer, single-

    phase or three phase, power or distribution transformer, independently of the power

    of nominal voltage.

    The ETP filosophyis based in basic principles of Condition Based Maintenance:

    Non destructive tests. Reliable and repetitive. Results are automaticaly stored and facility of managing.

    THE SYSTEM ETP is formed by four units of measurement (UM). Each part of the

    transformer will be characterized by the measurements of two units.

  • 8/14/2019 Art.ESierra-ETP 0MANTENIMIENTO.pdf

    5/15

    Winding: UM-1,UM-3

    Tap changer: UM-1,UM-3

    Magnetic package: UM-1,UM-5

    Insulation: UM-2, tan d

    ETP SYSTEM developed by Iberdrola/Unitronics is based in an adquisition system

    controled by PC via RS232:

    With the ETP System could be detected and confirmed the following problems:

    TAP CHANGER

    Faults in the Tap changer. High resistance connections.

    WINDINGS

    SHORTCIRCUIT between turns Winding cuts. Check the winding connections, CONNECTION GROUP Connections Slackening. Open windings. Hot spots in the windings.

    INSULATION

    Problems in oil- papper insulation, DEGRADATION. Absolute value of the insulation, LEAKAGE CURRENT.

  • 8/14/2019 Art.ESierra-ETP 0MANTENIMIENTO.pdf

    6/15

    MAGNETIC CORE Defects in magnetic core Windings displacements

    UNITRONICS ETP SYSTEM.

    UM1B

    This measurement unit performs a three-phase Transformer Turn Ratio test,

    connection group checking and core problems testing based on exciting currents

    measurement.

    The test is made with AC and it automatically measures each winding in relation with

    the other ones. Throught UM1B test results, we candetect following problems:

    Short circuit between turns.

    Winding cuts.

    Tap changer problems.

    Defects in magnetic core.

    Check winding connections, CONNECTION GROUP

  • 8/14/2019 Art.ESierra-ETP 0MANTENIMIENTO.pdf

    7/15

    UM2

    This unit performs the following measurements in an automatic and guided way:

    Recovery Voltage and Time Constant that allows us to predict an anomalousageing in paper/oil insulation.

    Insulation Resistance and Polarization Index, that give us an overview of

    insulation condition.

    For the calculation of those parameters, this unit applies different D.C. voltage levels

    between windings and ground. This test is totally non-destructive for the machine

    and allows us to detect problems in the transformer like:

    Degradation of solid dielectric

    Degradation of liquid dielectric

    Contamination of the insulation

    This is the only one test that could detect the paper insulation status

    independiently of oil and therefore it could give information about the machine

    remanent life.

    UM3

    This unit performs low resistance measurements specially of the windings of any kind

    of transformers or autotransformer, providing both simple and compound resistance

    value for high and low voltage and tertiary. The results are provided at reference

    temperature specified by the operator.

    The UM3B unit permits to do the following measurements automatically:

    Automatic winding resistance on the three phases.

    Resistance values corrected in temperature.

    Calculations of individual and compound resistance values (or Y).

  • 8/14/2019 Art.ESierra-ETP 0MANTENIMIENTO.pdf

    8/15

    The measurement technique used is the metric ratio resistance method (measured

    on four wires) and automatic magnetization/desmagnetization of the core, which

    avoid breaks of the equipment of measurement, guarantees the safety of the

    operator and the precision and repetitivity of the measurement

    This test is totally non-destructive for the machine and allows us to detect problems

    in the transformer like:

    SHORTCIRCUIT between turns

    Winding cuts.

    Connections Slackening.

    Open windings.

    Hot spots in the windings

    Tap changer defects

    UM5

    UM5B measures the short circuit impedance of power , distribution transformers and

    autotransformers applying a voltage test to the high voltage winding of the

    transformer and measuring the voltage excitation, the current excitation and phase

    angle deviation between them: V1 and I1. Its carried out with the transformer LV

    winding in short circuit.

    With the short circuit impedance measurement it is possible to detect problems in

    the transformer like:

    Displacements between windings

    Open winding

    Short-circuiting between turns

  • 8/14/2019 Art.ESierra-ETP 0MANTENIMIENTO.pdf

    9/15

    9

    4.-Conclusiones.

    This transformer evaluation method and the test system has been developed like a

    combination of 40 years of IBERDROLA test experience, testing Power and

    Distribution Transformer (more than 20.000 field test), and the system development

    of UNITRONICS during the last 10 years.

    ETP method performs the necessary non destructive tests in order to make a

    complete transformer status analysis.

    ETP System performs this method in a very easy and guided way. Some of tis

    advantages are:

    Reduced measurement time (2 4 hours, report generation included). Unification of the measurement systems. Instrumentation Cost reduction. Portable. Simplification of calculations Common data base to all tests Correction of results. Numerical and Graphical results presentation. Immediate reports production It facilitates the trend analysis

    ETP allows to establish a Predictive Maintenance Program of Tranformer without the

    need of high cost and complicated instruments. Also, it is not necesary large

    transformer outage, becouse ETP system make a complete dignostic of the

    transformer status in 3 hours.

  • 8/14/2019 Art.ESierra-ETP 0MANTENIMIENTO.pdf

    10/15

    10

    Example:

    Following example shows a tap changer problem detected through ETP method.

    POWER TRANSFORMER: 12 MVA-20/6,9 Kv-Dyn1 con regulacin en carga.

    File: d:\SAGEN_WIN\Ensayos\TRPGENER79812\RDBTRPGENER79812.0

    Date: 01-10-99

    **** IDENTIFICATION ****

    SITE NAME: C.T.CASTELLON

    MACHINE TYPE: Transformador de Potencia

    SERIAL NUMBER: 79812

    MANUFACTURER: GENERAL ELECTRICA ESPAOLA

    FUNCTION: T-2A1.T AUXILIAR

    MADE BY: J.M. DEL RIO

    UM-3 SERIAL NUMBER: 97014

    **** TECHNICAL DATA ****

    TYPE: TPAV12000/25 Three-phase

    TERTIARY:: No

    REFRIGERATION: OIL

    MANUFACTURING YEAR: 1971

    POWER (MVA): 12,000

    NOM, Vcc (%) 7,080

    HV VOLTAGE (KV): 20,000

    LV VOLTAGE (KV): 6,928

    HV CURRENT (A): 288,700

    LV CURRENT (A): 833,400

  • 8/14/2019 Art.ESierra-ETP 0MANTENIMIENTO.pdf

    11/15

    11

    CONNECTION GROUP: Dyn1

    ** TAP CHANGERSELECTOR OF THE HV **

    HANDLING NUMBER: 28158

    REGULATION: Load

    SWITCH TYPE: MA/2

    MANUFACTURER: G.E.E.

    TAPS NUMBER: 22

    NOMINAL TAP: 11

    CENTRAL TAPS NUMBER: 1

    STEP (V): 200

    ETP UM3 test detects a variation of winding resistance in HV winding:

    Phase W in the position 5 of the Tap Changer.

    **** MEASUREMENTS ****

    DATE: 01-10-99

    TRANSFORMER TEMPERATURE: 68,0 F

    REFERENCE TEMPERATURE: 75,0 F

    MEASURED WINDINGS: HV LV

    TOTAL MEASUREMENT TIME (h:mm:ss): 0:48:20

    ** MEASUREMENTS OF THE HV **

    MEASUREMENT TIME: 0:27:58

  • 8/14/2019 Art.ESierra-ETP 0MANTENIMIENTO.pdf

    12/15

    12

    COMPOUND RESISTANCE PHASE RESISTANCE

    TAPR-AB(Ohm)

    R-BC(Ohm)

    R-AC(Ohm)

    WR-A(Ohm)

    WR-B(Ohm)

    WR-C(Ohm)

    Measurementelapsed Time

    1 0,2102 0,2107 0,2093 0,320307 0,321841 0,317582 0:02:48

    2 0,2079 0,2087 0,2071 0,3166 0,319055 0,314182 0:02:38

    3 0,2064 0,2067 0,2053 0,314724 0,315646 0,311392 0:02:26

    4 0,2044 0,2045 0,2034 0,311732 0,312038 0,308698 0:02:36

    5 0,2031 0,2038 0,2054 0,307789 0,309894 0,314816 0:02:46

    6 0,2001 0,2008 0,2001 0,304372 0,306509 0,304372 0:02:36

    7 0,1967 0,1971 0,1958 0,2998 0,301027 0,297074 0:02:36

    8 0,2011 0,2025 0,2006 0,305786 0,310085 0,30428 0:02:24

    9 0,2029 0,2033 0,2033 0,308587 0,309804 0,309804 0:02:24

    10 0,2047 0,2048 0,2036 0,312239 0,312546 0,308903 0:02:22No. 11 0,2064 0,2069 0,2055 0,31452 0,316054 0,311796 0:02:22

    Note: In this chart and plot are only represented the first 11 positions

    Grfico 1

    In order to better definiton of transformer problem, we compare UM3 winding

    resistance measurements with UM1 transformer turn ratio and exciting current

    measurements. Following chart shows the Transformer Turn Ratio Measurements,

    which shows TTR normal variation with the tap changer position.

  • 8/14/2019 Art.ESierra-ETP 0MANTENIMIENTO.pdf

    13/15

    13

    1.W U\2.u n 1.U V\2.v n 1.V W\2.w n

    POS. Theo TTR Meas. TTR % Meas. TTR % Meas. TTR %

    1 5,5 5,497 0,05 5,497 0,05 5,498 0,04

    2 5,45 5,448 0,04 5,448 0,04 5,448 0,04

    3 5,4 5,397 0,06 5,398 0,04 5,398 0,04

    4 5,35 5,348 0,04 5,348 0,04 5,348 0,04

    5 5,3 5,298 0,04 5,298 0,04 5,298 0,04

    6 5,25 5,247 0,06 5,248 0,04 5,247 0,06

    7 5,2 5,198 0,04 5,198 0,04 5,198 0,04

    8 5,15 5,148 0,04 5,148 0,04 5,148 0,04

    9 5,1 5,098 0,04 5,098 0,04 5,098 0,04

    10 5,05 5,048 0,04 5,048 0,04 5,048 0,04

    11a 5 4,998 0,04 4,998 0,04 4,998 0,04

    12 4,95 4,948 0,04 4,948 0,04 4,948 0,04

    13 4,9 4,898 0,04 4,898 0,04 4,898 0,04

    14 4,85 4,848 0,04 4,848 0,04 4,848 0,04

    15 4,8 4,798 0,04 4,798 0,04 4,798 0,04

    16 4,75 4,748 0,04 4,748 0,04 4,748 0,04

    17 4,7 4,698 0,04 4,698 0,04 4,698 0,04

    18 4,65 4,648 0,04 4,648 0,04 4,648 0,04

    19 4,6 4,598 0,04 4,598 0,04 4,598 0,0420 4,55 4,548 0,04 4,548 0,04 4,548 0,04

    TTR vs Tap Changer Pos

    0

    1

    2

    3

    4

    5

    6

    1 4 710

    13

    16

    19

    Tap Changer

    TTR

    1.W U\2.u n

    1.U V\2.v n

    1.V W\2.w n

  • 8/14/2019 Art.ESierra-ETP 0MANTENIMIENTO.pdf

    14/15

    14

    EXCITING CURRENT TEST (110 V Test):

    NOMINAL POSITION1.W U\2.u n 1.U V\2.v n 1.V W\2.w n

    Exciting Current (A) 0,0064 0,0062 0,0064

    Conclusions:

    Winding resistance readings shows that Phase W, HV winding, tap changer position 5

    has anormalous increasing of its resitance value.

    Transformer turn ratio is normal in all tap changer position.

    Exciting current readings are very similar in the three phases.

    After ETP test results evaluation, in IBERDROLA Test report 2372 is recommended

    tap changer revision, where is detected a fault:

  • 8/14/2019 Art.ESierra-ETP 0MANTENIMIENTO.pdf

    15/15

    15

    After tap-changer repair, it was mounted and a ETP test was made again. Following

    Winding Resistance readings show that the problem has desappeared and now thevariations between taps are as expected.

    Grfico 2