2012 ADC WINTER FORUM | PAGE 1 Enhanced Use Leasing: Update & Opportunities Dr. Craig College, February 29, 2012.

Dec 18, 2015

Download

Documents

Christian Logan
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: 2012 ADC WINTER FORUM | PAGE 1 Enhanced Use Leasing: Update & Opportunities Dr. Craig College, February 29, 2012.

2012 ADC WINTER FORUM | PAGE 1

Enhanced Use Enhanced Use Leasing: Update & Leasing: Update & OpportunitiesOpportunities

Dr. Craig College, February 29, 2012

Page 2: 2012 ADC WINTER FORUM | PAGE 1 Enhanced Use Leasing: Update & Opportunities Dr. Craig College, February 29, 2012.

2012 ADC WINTER FORUM | PAGE 2

Current Army StatusCurrent Army Status

GAO recommended that the Army & Air Force review all EULs for terms, conditions and ensure that the EULs are in compliance with applicable statutes.

Based on GAO Audit the Army took a Strategic Pause (November 2010-July 2011)

Army began comparing notes with other Services to identify Best Practices

Aggressively working on Consistent Practices within DOD for EUL

Page 3: 2012 ADC WINTER FORUM | PAGE 1 Enhanced Use Leasing: Update & Opportunities Dr. Craig College, February 29, 2012.

2012 ADC WINTER FORUM | PAGE 3

Army Way AheadArmy Way Ahead

Management of HQDA EUL has transferred to COE Real Estate Department

Army EUL focus is on Energy Renewal projects, especially

Large Scale Renewable Energy Projects (10MW +) Will not allow “contaminated” dirt to be used Will require EA -vs- EIS for EUL Will require detailed timeline, project concept, financial and

planned start Will treat this like Lessee -vs- Lessor (not a partnership

relationship)

Page 4: 2012 ADC WINTER FORUM | PAGE 1 Enhanced Use Leasing: Update & Opportunities Dr. Craig College, February 29, 2012.

Fort Detrick – Central Utility Plant

• Facility to provide uninterrupted power in support of National Inter-Agency Bio Defense Campus and National Institute of Health

• $103 million fast tracked design-build-operate project delivery

• EUL Developer: Keenan Development Chevron Energy Solutions

• 10 acre site• Phase 1 completed 2009 and

Phase 2 underway

2012 ADC WINTER FORUM PAGE 4

Page 5: 2012 ADC WINTER FORUM | PAGE 1 Enhanced Use Leasing: Update & Opportunities Dr. Craig College, February 29, 2012.

Yuma Proving Ground

• State-of-the-art hot weather test track complex on 2,400 acres

• EUL Developer: General Motors Corp.

• In-kind consideration to the Army: construction of a $11 million Hot Weather Test Track Complex

• On-going joint use operations featuring YPG’s use of GM tracks and GM’s use of YPG tracks

2012 ADC WINTER FORUM PAGE 5

Page 6: 2012 ADC WINTER FORUM | PAGE 1 Enhanced Use Leasing: Update & Opportunities Dr. Craig College, February 29, 2012.

Aberdeen Proving Ground – The GATE

• Projected to be a 2-3 million SF commercial office and technology park

• Development includes:

• 72,605 SF office building yielding $103,462/yr over 50 years, with rents increasing 10% every 5 years

• Tenants include CACI, L3, Raytheon, Boeing, SAIC and Telford Aviation

• Since 2007, approximately 600,000 SF leased resulting in $850,000/yr rent to Army

2012 ADC WINTER FORUM PAGE 6

Page 7: 2012 ADC WINTER FORUM | PAGE 1 Enhanced Use Leasing: Update & Opportunities Dr. Craig College, February 29, 2012.

USAG - Redstone

• 3-4 Million Square feet of Office, Hotel and Flex Space

• In-Kind Value of 30-50 million dollars of offset of O&M dollars

• Improved access for support contractors relocated per BRAC.

• Over 1 Million Square Feet to be completed by 2014

2012 ADC WINTER FORUM PA7E 7

Page 8: 2012 ADC WINTER FORUM | PAGE 1 Enhanced Use Leasing: Update & Opportunities Dr. Craig College, February 29, 2012.

Fort Irwin

• Technology: Ground mounted photovoltaic (PV)

• Size: 13 - 20 MW AC

(large scale renewable energy project)

• Location: Approximately 200 acre parcel of land in vicinity of front gate

• Off -Take: Army to consume all electricity

• Purpose: To enhance energy security at Fort Irwin

Fort Irwin Cantonment Area

Main Gate Site

2012 ADC WINTER FORUM PAGE 8

Page 9: 2012 ADC WINTER FORUM | PAGE 1 Enhanced Use Leasing: Update & Opportunities Dr. Craig College, February 29, 2012.

2012 ADC WINTER FORUM | PAGE 9

BACKUP SLIDES

Page 10: 2012 ADC WINTER FORUM | PAGE 1 Enhanced Use Leasing: Update & Opportunities Dr. Craig College, February 29, 2012.

2012 ADC WINTER FORUM | PAGE 10

GAO Report 2011 RecommendationsGAO Report 2011 Recommendations

#1: That the Secretaries of the Army and the Air Force take action to review all EULs for terms and conditions similar to those that our legal opinion concluded were inconsistent with applicable statutes; determine whether steps are needed to help ensure that the EULs are in compliance with applicable statutes; and, if so, then implement these steps.

#2: That the Secretaries of the Army and the Air Force take action to take steps to ensure that all EULs provide that if and to the extent that the leased property is later made taxable by state or local governments under an Act of Congress, the lease shall be renegotiated, as required by subsection 2667(f) of Title 10, U.S. Code.

#3: That the Secretaries of the Army and the Air Force take action to review and clarify guidance describing how the FMV of the lease interest should be determined and how the receipt of FMV can be best ensured.

Page 11: 2012 ADC WINTER FORUM | PAGE 1 Enhanced Use Leasing: Update & Opportunities Dr. Craig College, February 29, 2012.

2012 ADC WINTER FORUM | PAGE 11

#4: That the Secretaries of the Army, the Navy, and the Air Force take action to issue guidance on how to determine and document that section 2667 provisions were met prior to entering into an EUL, including the required secretarial determinations and the basis for the determinations.

#5: That the Secretaries of the Army, the Navy, and the Air Force take action to issue guidance on the analyses or documentation needed to show that future leases executed under section 2667 do not include property needed for public use, as is now required by section 2667.

#6: That the Secretaries of the Army, the Navy, and the Air Force take action to develop procedures to regularly monitor and analyze EUL program administrations costs to help ensure that costs are in line with program benefits.

GAO Report 2011 RecommendationsGAO Report 2011 Recommendations