AGUSTUS 2014 LAPORAN AKHIR PEKERJAAN PENYELIDIKAN TANAH PROYEK RUMAH TINGGAL DI PERUM. MODERNHILL, BLOK EI/16, PONDOK CABE UDIK – TANGERANG SELATAN PT. BAHANA TEHNIK RAYA Topography-Hydrography-Soil Investigation-Drilling- Bore Pile- Geologi Mapping-Engineering-Construction Telp.84312336, Fax.84309580 Email. [email protected] BAPAK ADRIN
26

1992_Sondir Pondok Cabe Udik Tangerang Selatan.

Apr 13, 2016

Download

Documents

Adi Deck

DCC
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: 1992_Sondir Pondok Cabe Udik Tangerang Selatan.

AGUSTUS 2014

LAPORAN

AKHIR

PEKERJAAN PENYELIDIKAN TANAH PROYEK RUMAH TINGGAL DI PERUM. MODERNHILL, BLOK EI/16, PONDOK CABE UDIK – TANGERANG SELATAN

PT. BAHANA TEHNIK RAYA Topography-Hydrography-Soil Investigation-Drilling- Bore Pile-

Geologi Mapping-Engineering-Construction Telp.84312336, Fax.84309580 Email. [email protected]

BAPAK ADRIN

Page 2: 1992_Sondir Pondok Cabe Udik Tangerang Selatan.

DAFTAR ISI

PENGANTAR 1

BAB I PENYELIDIKAN TANAH 2

1.1 Program Penyelidikan Tanah di Lapangan 2

1.2 Pengujian Sondir/DCPT 2

1.3 Pengamatan Muka Air Tanah 3

BAB II KONDISI LAPISAN TANAH 4

2.1 Berdasarkan Pengujian Sondir 4

2.2 Muka air Tanah 4

BAB III REKOMENDASI GEOTEKNIK 5

3.1 Daya Dukung Ijin Pondasi Dangkal 5

3.2 Daya Dukung Ijin Pondasi Dalam 5

3.3 Saran dan Analisa 6

LAMPIRAN I. GRAFIK SONDIR/DCPT

LAMPIRAN II. SKETSA LOKASI TITIK PENYELIDIKAN TANAH

LAMPIRAN III. DOKUMENTASI

Page 3: 1992_Sondir Pondok Cabe Udik Tangerang Selatan.

LAPORAN AKHIR PENYELIDIKAN TANAH PROYEK RUMAH TINGGAL DI PERUM MODERN HILL BLOK E.1/16 PONDOK CABE UDIK, TANGERANG SELATAN

1

LAPORAN AKHIR PENYELIDIKAN TANAH PROYEK RUMAH TINGGAL

DI PERUM MODERN HILL BLOK E.1/16 PONDOK CABE UDIK, TANGERANG SELATAN

PENGANTAR

Laporan ini memaparkan hasil akhir penyelidikan tanah proyek Rumah Tinggal di Perum

Modern Hill Blok E.1/16, Pondok Cabe Udik, Tangerang Selatan. Penyelidikan tanah ini

dilakukan untuk mendapatkan data teknis/parameter tanah yang dapat mewakili kondisi tanah

setempat untuk digunakan didalam perencanaan pondasi.

Ruang lingkup pekerjaan penyelidikan tanah untuk memenuhi tujuan tersebut adalah sebagai

berikut :

1. Melakukan pengujian Dutch Cone Penetrometer Test (DCPT)/Sondir dengan kapasitas

2.5 ton sebanyak 3 (tiga) titik. Percobaan dihentikan bila tahanan konus telah mencapai

200 kg/cm² atau kedalaman pengujian telah mencapai 25.0 meter.

2. Pengamatan muka air tanah pada seluruh titik uji lapangan.

3. Menyusun laporan untuk menyajikan hasil penyelidikan tanah serta diskusi kondisi tanah.

4. Melakukan analisa dan rekomendasi daya dukung ijin pondasi.

Page 4: 1992_Sondir Pondok Cabe Udik Tangerang Selatan.

LAPORAN AKHIR PENYELIDIKAN TANAH PROYEK RUMAH TINGGAL DI PERUM MODERN HILL BLOK E.1/16 PONDOK CABE UDIK, TANGERANG SELATAN

2

BAB I.

PENYELIDIKAN TANAH

1.1 Program Penyelidikan Tanah di Lapangan

Program penyelidikan tanah yang telah dilakukan meliputi pekerjaan-pekerjaan sebagai berikut :

� Melakukan pengujian sondir di 3 (tiga) titik, yaitu : S-1, S-2, dan S-3.

� Memonitor muka air tanah pada setiap titik sondir.

Seluruh pekerjaan dimulai dan selesai pada tanggal 13 Agustus 2014, dengan ringkasan sebagai

berikut:

Titik Sondir Tanggal Pelaksanaan Kedalaman Maksimum (meter)

S-1 13 Agustus 2014 15.8

S-2 13 Agustus 2014 22.4

S-3 13 Agustus 2014 21.6

1.2 Pengujian Sondir/Dutch Cone Penetration Test

Percobaan ini menggunakan alat sondir tipe Dutch Cone Penetrometer yang dilengkapi dengan

bikonus, dan dipasang diujung pipa sondir. Selama percobaan sondir, alat dipertahankan vertikal

dengan memasang angkur dikaki sondir. Konus kemudian ditekan masuk ke dalam tanah dengan

kecepatan konstan tidak lebih dari 2 cm/dtk.

Konus mempunyai sudut 60 derajat dan luas conenya 10 cm². Pembacaan tekanan konus

dilakukan dengan interval 20 cm yaitu pembacaan tekanan konus dan tekanan total + friksi dari

selimut konus.

Percobaan ini dihentikan jika tahanan konus telah mencapai 200 kg/cm² atau mencapai

kedalaman 25.0 meter. Hasil percobaan dipresentasikan dalam grafik hubungan antara

kedalaman terhadap tahanan konus, tahanan total, dan friction ratio.

Page 5: 1992_Sondir Pondok Cabe Udik Tangerang Selatan.

LAPORAN AKHIR PENYELIDIKAN TANAH PROYEK RUMAH TINGGAL DI PERUM MODERN HILL BLOK E.1/16 PONDOK CABE UDIK, TANGERANG SELATAN

3

1.3 Pengamatan Muka Air Tanah

Muka air tanah diamati pada semua titik sondir selama penyelidikan lapangan dilakukan.

Kedalaman muka air tanah yang diperoleh pada waktu penyelidikan lapangan diperoleh dalam

waktu yang singkat atau hanya dilakukan pada saat pekerjaan lapangan dilaksanakan, sehingga

perlu dilakukan pengujian lapangan lainnya untuk mendapatkan kedalaman muka air tanah yang

lebih pasti dan stabil.

Page 6: 1992_Sondir Pondok Cabe Udik Tangerang Selatan.

LAPORAN AKHIR PENYELIDIKAN TANAH PROYEK RUMAH TINGGAL DI PERUM MODERN HILL BLOK E.1/16 PONDOK CABE UDIK, TANGERANG SELATAN

4

BAB II.

KONDISI LAPISAN TANAH

2.1 Berdasarkan Pengujian Sondir

Pengujian sondir dilakukan pada 3 (tiga) titik. Berdasarkan hasil pengujian DCPT / sondir yang

diplot dalam grafik hubungan antara qc (tahanan konus) dan fr (friction ratio) terhadap

kedalaman pengujian, diperoleh data sebagai:

Titik Sondir Kedalaman Pengujian Sondir Nilai Tahanan Konus (qc)

S-1 15.8 250 kg/cm²

S-2 22.4 250 kg/cm²

S-3 21.6 250 kg/cm²

2.2 Muka Air Tanah

Muka air tanah diamati pada semua titik sondir selama penyelidikan lapangan dilakukan. Untuk

mendapatkan muka air tanah yang lebih pasti disarankan untuk melakukan pengujian lapangan

lainnya. Adapun hasil pengamatan dan pengukuran selama pekerjaan lapangan dirangkum

sebagai berikut:

Titik Sondir Kedalaman Muka Air Tanah

S-1 3.0m

S-2 3.0m

S-3 2.0m

Page 7: 1992_Sondir Pondok Cabe Udik Tangerang Selatan.

LAPORAN AKHIR PENYELIDIKAN TANAH PROYEK RUMAH TINGGAL DI PERUM MODERN HILL BLOK E.1/16 PONDOK CABE UDIK, TANGERANG SELATAN

5

BAB III.

REKOMENDASI GEOTEKNIK

3.1 Daya Dukung Ijin Pondasi Dangkal

Pondasi dangkal dapat digunakan untuk memikul beban rencana struktur ringan. Daya dukung

ijin pondasi dangkal dihitung berdasarkan nilai tanahan konus dengan menggunakan formula

Skempton. Daya dukung ijin pondasi dangkal pada beberapa kedalaman berdasarkan nilai qc

adalah sebagai berikut:

Kedalaman Pondasi Dangkal Daya Dukung Ijin

1.0m 0.20 kg/cm²

2.0m 0.22 kg/cm²

3.0m 0.25 kg/cm²

3.2 Daya Dukung Ijin Pondasi Dalam

Pondasi dalam digunakan jika pondasi dangkal tidak mampu memikul beban struktur yang telah

direncanakan. Pemilihan jenis pondasi dalam yang digunakan tergantung dari faktor lingkungan

di sekitar lokasi proyek, kondisi tanah, dan faktor ekonomis. Berikut daya dukung ijin pondasi

dalam pada masing-masing titik uji sondir.

a. Daya dukung ijin pondasi dalam pada titik S-1 yang ditempatkan hingga kedalaman

16.0m.

Dimensi Pondasi Dalam Daya Dukung Ijin (ton)

Tiang Pancang Segiempat 20cmx20cm 31

Tiang Pancang Segiempat 25cmx25cm 40

Tiang Pancang Segitiga 28cm 32

Tiang Pancang Segitiga 32cm 37

Page 8: 1992_Sondir Pondok Cabe Udik Tangerang Selatan.

LAPORAN AKHIR PENYELIDIKAN TANAH PROYEK RUMAH TINGGAL DI PERUM MODERN HILL BLOK E.1/16 PONDOK CABE UDIK, TANGERANG SELATAN

6

Dimensi Pondasi Dalam Daya Dukung Ijin (ton)

Tiang Bor Diameter 30cm 36

Tiang Bor Diameter 40cm 51

Tiang Bor Diameter 50cm 68

Tiang Bor Diameter 60cm 85

b. Daya dukung ijin pondasi dalam pada titik S-2 dan S-3 yang ditempatkan hingga

kedalaman 22.0m.

Dimensi Pondasi Dalam Daya Dukung Ijin (ton)

Tiang Pancang Segiempat 20cmx20cm 50

Tiang Pancang Segiempat 25cmx25cm 63

Tiang Pancang Segitiga 28cm 51

Tiang Pancang Segitiga 32cm 59

Dimensi Pondasi Dalam Daya Dukung Ijin (ton)

Tiang Bor Diameter 30cm 56

Tiang Bor Diameter 40cm 78

Tiang Bor Diameter 50cm 100

Tiang Bor Diameter 60cm 125

3.3 Saran dan Analisa

• Pada pelaksanaan pekerjaan pondasi dalam disarankan untuk melakukan pengujian beban

statis (static loading test) atau uji beban lainnya dengan beban uji 2x beban rencana.

Pengujian ini akan menghasilkan daya dukung tiang tunggal yang lebih optimal dan

besarnya penurunan yang terjadi akibat uji pembebanan.

• Permasalahan yang timbul dalam pelaksanaan konstruksi pondasi dalam baik tiang

pancang sangat mempengaruhi perilaku pondasi tiang dalam dan daya dukung ijinnya,

sehingga perlu dilakukan Quality Control yang baik.

Page 9: 1992_Sondir Pondok Cabe Udik Tangerang Selatan.

LAPORAN AKHIR PENYELIDIKAN TANAH PROYEK RUMAH TINGGAL DI PERUM MODERN HILL BLOK E.1/16 PONDOK CABE UDIK, TANGERANG SELATAN

7

• Pengujian sondir yang dilakukan pada lokasi ini, hanya dapat memperkirakan kedalaman

lapisan tanah keras sesuai dengan kapasitas dan kemampuan alat sondir. Sedangkan

untuk ketebalan lapisan tanah keras yang dianggap cukup untuk memikul beban yang

direncanakan tidak dapat diperoleh melalui pengujian sondir. Untuk mendapatkan hasil

dan gambaran profil tanah yang lebih baik dan pasti maka disarankan untuk melakukan

pengeboran dalam (deep boring) dan pengujian Standard Penetration Test (SPT).

Demikian laporan akhir penyelidikan tanah ini disampaikan. Atas kerjasama dan kepercayaan

yang telah diberikan, kami ucapkan terima kasih. Grafik, gambar, dan tabel melengkapi laporan

ini.

Jakarta, 15 Agustus 2014

Hormat Kami,

PT. BAHANA TEHNIK RAYA

Darmawan

(Direktur)

Page 10: 1992_Sondir Pondok Cabe Udik Tangerang Selatan.

S2

10 M

10 M

10 M

S3 10 M S1

SKETSA TITIK SONDIR

Page 11: 1992_Sondir Pondok Cabe Udik Tangerang Selatan.

LAPORAN AKHIR PENYELIDIKAN TANAH

PROYEK RUMAH TINGGAL

DI PERUM MODERN HILL BLOK E.1/16

PONDOK CABE UDIK, TANGERANG SELATAN

LAMPIRAN I.

GRAFIK SONDIR/DCPT

Page 12: 1992_Sondir Pondok Cabe Udik Tangerang Selatan.

Project RUMAH TINGGAL Operator Lasimin

Location Perum. Modernhill, Blok E.1/16, Pondok Cabe Udik, Tangerang Selatan Checked By DRMDate 13-Aug-14 GWL 3.0 meterTest No. S-1

Kedalaman Pembacaan Konus (R1)

Jumlah Perlawanan

(R2)

Perlawanan Gesek

Lokal Friksi Total Friksi Friksi Ratio

meter kg/cm² kg/cm² kg/cm² kg/cm² kg/cm %

0.00 0 0 0 0 0 0

0.20 15 20 5 0.42 8.3 0.00

0.40 18 22 4 0.33 15.0 1.85

0.60 16 18 2 0.17 18.3 1.04

0.80 20 25 5 0.42 26.7 2.08

1.00 15 20 5 0.42 35.0 2.78

1.20 25 30 5 0.42 43.3 1.67

1.40 16 18 2 0.17 46.7 1.04

1.60 8 14 6 0.50 56.7 6.25

1.80 10 15 5 0.42 65.0 4.17

2.00 5 10 5 0.42 73.3 8.33

2.20 4 8 4 0.33 80.0 8.33

2.40 8 12 4 0.33 86.7 4.17

2.60 12 16 4 0.33 93.3 2.78

2.80 15 20 5 0.42 101.7 2.78

3.00 5 10 5 0.42 110.0 8.33

3.20 14 16 2 0.17 113.3 1.19

3.40 8 12 4 0.33 120.0 4.17

3.60 18 27 9 0.75 135.0 4.17

3.80 14 18 4 0.33 141.7 2.38

4.00 10 15 5 0.42 150.0 4.17

4.20 4 8 4 0.33 156.7 8.33

4.40 8 12 4 0.33 163.3 4.17

4.60 8 12 4 0.33 170.0 4.17

4.80 12 16 4 0.33 176.7 2.78

5.00 8 12 4 0.33 183.3 4.17

5.20 15 30 15 1.25 208.3 8.33

5.40 18 22 4 0.33 215.0 1.85

5.60 20 25 5 0.42 223.3 2.08

5.80 14 18 4 0.33 230.0 2.38

6.00 10 15 5 0.42 238.3 4.17

6.20 5 10 5 0.42 246.7 8.33

6.40 8 12 4 0.33 253.3 4.17

6.60 12 16 4 0.33 260.0 2.78

6.80 30 40 10 0.83 276.7 2.78

7.00 20 30 10 0.83 293.3 4.17

7.20 15 30 15 1.25 318.3 8.33

7.40 30 40 10 0.83 335.0 2.78

7.60 40 50 10 0.83 351.7 2.08

7.80 30 40 10 0.83 368.3 2.78

8.00 60 70 10 0.83 385.0 1.39

8.20 40 50 10 0.83 401.7 2.08

8.40 40 50 10 0.83 418.3 2.08

8.60 45 65 20 1.67 451.7 3.70

8.80 70 80 10 0.83 468.3 1.19

9.00 50 60 10 0.83 485.0 1.67

9.20 40 50 10 0.83 501.7 2.08

9.40 25 30 5 0.42 510.0 1.67

9.60 50 60 10 0.83 526.7 1.67

9.80 30 45 15 1.25 551.7 4.17

10.00 40 50 10 0.83 568.3 2.08

Page 1 from 2

DATA PENYELIDIKAN LAPANGANPENGUJIAN DUCTH CONE PENETROMETER TEST/SONDIR

Keterangan

Page 13: 1992_Sondir Pondok Cabe Udik Tangerang Selatan.

Proyek RUMAH TINGGAL Operator LasiminLokasi Perum. Modernhill, Blok E.1/16, Pondok Cabe Udik, Tangerang Selatan Checked By DRMTanggal 13-Aug-14 MAT 3.0 meterTitik No. S-1

Kedalaman Pembacaan Konus (R1)

Jumlah Perlawanan

(R2)

Perlawanan Gesek

Lokal Friksi Total Friksi Friksi Ratio

meter kg/cm² kg/cm² kg/cm² kg/cm² kg/cm %

10.00 40 50 10 0.83 568.3 2.08

10.20 60 70 10 0.83 601.7 1.39

10.40 57 65 8 0.67 615.0 1.17

10.60 30 40 10 0.83 631.7 2.78

10.80 60 75 15 1.25 656.7 2.08

11.00 80 90 10 0.83 673.3 1.04

11.20 70 80 10 0.83 690.0 1.19

11.40 70 80 10 0.83 706.7 1.19

11.60 45 65 20 1.67 740.0 3.70

11.80 80 90 10 0.83 756.7 1.04

12.00 105 120 15 1.25 781.7 1.19

12.20 90 110 20 1.67 815.0 1.85

12.40 120 130 10 0.83 831.7 0.69

12.60 135 145 10 0.83 848.3 0.62

12.80 140 150 10 0.83 865.0 0.60

13.00 140 150 10 0.83 881.7 0.60

13.20 150 160 10 0.83 898.3 0.56

13.40 155 165 10 0.83 915.0 0.54

13.60 140 150 10 0.83 931.7 0.60

13.80 130 140 10 0.83 948.3 0.64

14.00 130 140 10 0.83 965.0 0.64

14.20 135 145 10 0.83 981.7 0.62

14.40 130 140 10 0.83 998.3 0.64

14.60 120 130 10 0.83 1015.0 0.69

14.80 150 160 10 0.83 1031.7 0.56

15.00 160 170 10 0.83 1048.3 0.52

15.20 170 180 10 0.83 1065.0 0.49

15.40 195 205 10 0.83 1081.7 0.43

15.60 210 235 25 2.08 1123.3 0.99

15.80 250 250 0 0.00 1123.3 0.00

Page 2 from 2

DATA PENYELIDIKAN LAPANGANPENGUJIAN DUCTH CONE PENETROMETER TEST/SONDIR

Keterangan

Page 14: 1992_Sondir Pondok Cabe Udik Tangerang Selatan.

PT. BAHANA TEHNIK RAYA

Test No.

S-1Project : RUMAH TINGGAL X :Location : Perum. Modernhill, Blok E.1/16, Pondok Cabe Udik, Tangerang SelatanY :Date : Z :Operator : Capacity : 2.5 tonfChecked By : GWL : 3.0 meter

DUTCH CONE PENETROMETER TEST/SONDIR

DRMLasimin13-Aug-14

0

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

0 50 100 150 200 250 300

Dep

th (m

eter

)

qc (kg/cm²) tf/10 (kg/cm)

0

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

0 2 4 6 8 10 12

Dep

th (m

eter

)

FR (%)

Page 15: 1992_Sondir Pondok Cabe Udik Tangerang Selatan.

LAPORAN AKHIR PENYELIDIKAN TANAH

PROYEK RUMAH TINGGAL

DI PERUM MODERN HILL BLOK E.1/16

PONDOK CABE UDIK, TANGERANG SELATAN

LAMPIRAN II.

SKETSA LOKASI TITIK

PENYELIDIKAN TANAH

Page 16: 1992_Sondir Pondok Cabe Udik Tangerang Selatan.

Project RUMAH TINGGAL Operator Lasimin

Location Perum. Modernhill, Blok E.1/16, Pondok Cabe Udik, Tangerang Selatan Checked By DRMDate 13-Aug-14 GWL 3.0 meterTest No. S-2

Kedalaman Pembacaan Konus (R1)

Jumlah Perlawanan

(R2)

Perlawanan Gesek

Lokal Friksi Total Friksi Friksi Ratio

meter kg/cm² kg/cm² kg/cm² kg/cm² kg/cm %

0.00 0 0 0 0 0 0

0.20 5 10 5 0.42 8.3 0.00

0.40 4 8 4 0.33 15.0 8.33

0.60 16 18 2 0.17 18.3 1.04

0.80 18 22 4 0.33 25.0 1.85

1.00 4 8 4 0.33 31.7 8.33

1.20 4 8 4 0.33 38.3 8.33

1.40 10 15 5 0.42 46.7 4.17

1.60 15 20 5 0.42 55.0 2.78

1.80 14 18 4 0.33 61.7 2.38

2.00 5 10 5 0.42 70.0 8.33

2.20 2 4 2 0.17 73.3 8.33

2.40 2 4 2 0.17 76.7 8.33

2.60 5 10 5 0.42 85.0 8.33

2.80 4 8 4 0.33 91.7 8.33

3.00 5 10 5 0.42 100.0 8.33

3.20 12 16 4 0.33 106.7 2.78

3.40 5 10 5 0.42 115.0 8.33

3.60 10 15 5 0.42 123.3 4.17

3.80 10 15 5 0.42 131.7 4.17

4.00 4 8 4 0.33 138.3 8.33

4.20 18 22 4 0.33 145.0 1.85

4.40 14 16 2 0.17 148.3 1.19

4.60 4 8 4 0.33 155.0 8.33

4.80 4 8 4 0.33 161.7 8.33

5.00 12 16 4 0.33 168.3 2.78

5.20 25 30 5 0.42 176.7 1.67

5.40 23 26 3 0.25 181.7 1.09

5.60 18 22 4 0.33 188.3 1.85

5.80 20 25 5 0.42 196.7 2.08

6.00 20 25 5 0.42 205.0 2.08

6.20 50 60 10 0.83 221.7 1.67

6.40 30 40 10 0.83 238.3 2.78

6.60 20 25 5 0.42 246.7 2.08

6.80 25 30 5 0.42 255.0 1.67

7.00 10 15 5 0.42 263.3 4.17

7.20 40 50 10 0.83 280.0 2.08

7.40 30 40 10 0.83 296.7 2.78

7.60 22 26 4 0.33 303.3 1.52

7.80 25 30 5 0.42 311.7 1.67

8.00 40 50 10 0.83 328.3 2.08

8.20 25 35 10 0.83 345.0 3.33

8.40 20 25 5 0.42 353.3 2.08

8.60 35 45 10 0.83 370.0 2.38

8.80 50 60 10 0.83 386.7 1.67

9.00 50 60 10 0.83 403.3 1.67

9.20 60 70 10 0.83 420.0 1.39

9.40 50 60 10 0.83 436.7 1.67

9.60 45 65 20 1.67 470.0 3.70

9.80 70 80 10 0.83 486.7 1.19

10.00 40 50 10 0.83 503.3 2.08

Page 1 from 3

DATA PENYELIDIKAN LAPANGANPENGUJIAN DUCTH CONE PENETROMETER TEST/SONDIR

Keterangan

Page 17: 1992_Sondir Pondok Cabe Udik Tangerang Selatan.

Proyek RUMAH TINGGAL Operator LasiminLokasi Perum. Modernhill, Blok E.1/16, Pondok Cabe Udik, Tangerang Selatan Checked By DRMTanggal 13-Aug-14 MAT 3.0 meterTitik No. S-2

Kedalaman Pembacaan Konus (R1)

Jumlah Perlawanan

(R2)

Perlawanan Gesek

Lokal Friksi Total Friksi Friksi Ratio

meter kg/cm² kg/cm² kg/cm² kg/cm² kg/cm %

10.00 40 50 10 0.83 503.3 2.08

10.20 40 50 10 0.83 536.7 2.08

10.40 35 45 10 0.83 553.3 2.38

10.60 50 60 10 0.83 570.0 1.67

10.80 30 40 10 0.83 586.7 2.78

11.00 50 60 10 0.83 603.3 1.67

11.20 55 75 20 1.67 636.7 3.03

11.40 80 90 10 0.83 653.3 1.04

11.60 60 70 10 0.83 670.0 1.39

11.80 50 60 10 0.83 686.7 1.67

12.00 60 70 10 0.83 703.3 1.39

12.20 50 60 10 0.83 720.0 1.67

12.40 25 40 15 1.25 745.0 5.00

12.60 45 65 20 1.67 778.3 3.70

12.80 70 80 10 0.83 795.0 1.19

13.00 65 75 10 0.83 811.7 1.28

13.20 40 50 10 0.83 828.3 2.08

13.40 30 40 10 0.83 845.0 2.78

13.60 35 55 20 1.67 878.3 4.76

13.80 60 70 10 0.83 895.0 1.39

14.00 45 65 20 1.67 928.3 3.70

14.20 70 80 10 0.83 945.0 1.19

14.40 50 60 10 0.83 961.7 1.67

14.60 35 55 20 1.67 995.0 4.76

14.80 60 70 10 0.83 1011.7 1.39

15.00 60 70 10 0.83 1028.3 1.39

15.20 55 75 20 1.67 1061.7 3.03

15.40 65 80 15 1.25 1086.7 1.92

15.60 45 65 20 1.67 1120.0 3.70

15.80 60 70 10 0.83 1136.7 1.39

16.00 65 85 20 1.67 1170.0 2.56

16.20 70 80 10 0.83 1186.7 1.19

16.40 100 110 10 0.83 1203.3 0.83

16.60 60 70 10 0.83 1220.0 1.39

16.80 80 90 10 0.83 1236.7 1.04

17.00 105 120 15 1.25 1261.7 1.19

17.20 130 140 10 0.83 1278.3 0.64

17.40 90 110 20 1.67 1311.7 1.85

17.60 80 105 25 2.08 1353.3 2.60

17.80 115 125 10 0.83 1370.0 0.72

18.00 80 90 10 0.83 1386.7 1.04

18.20 120 130 10 0.83 1403.3 0.69

18.40 120 130 10 0.83 1420.0 0.69

18.60 130 145 15 1.25 1445.0 0.96

18.80 105 120 15 1.25 1470.0 1.19

19.00 105 120 15 1.25 1495.0 1.19

19.20 90 105 15 1.25 1520.0 1.39

19.40 105 120 15 1.25 1545.0 1.19

19.60 125 145 20 1.67 1578.3 1.33

19.80 105 120 15 1.25 1603.3 1.19

20.00 130 140 10 0.83 1620.0 0.64

Page 2 from 3

DATA PENYELIDIKAN LAPANGANPENGUJIAN DUCTH CONE PENETROMETER TEST/SONDIR

Keterangan

Page 18: 1992_Sondir Pondok Cabe Udik Tangerang Selatan.

Project RUMAH TINGGAL Operator LasiminLocation Perum. Modernhill, Blok E.1/16, Pondok Cabe Udik, Tangerang Selatan Checked By DRMDate 13-Aug-14 GWL 3.0 meterTest No. S-2

Kedalaman Pembacaan Konus (R1)

Jumlah Perlawanan

(R2)

Perlawanan Gesek

Lokal Friksi Total Friksi Friksi Ratio

meter kg/cm² kg/cm² kg/cm² kg/cm² kg/cm %

20.00 130 140 10 0.83 1,620.0 0.64

20.20 105 115 10 0.83 1653.3 0.79

20.40 95 105 10 0.83 1670.0 0.88

20.60 115 135 20 1.67 1703.3 1.45

20.80 105 120 15 1.25 1728.3 1.19

21.00 115 135 20 1.67 1761.7 1.45

21.20 130 145 15 1.25 1786.7 0.96

21.40 150 165 15 1.25 1811.7 0.83

21.60 160 180 20 1.67 1845.0 1.04

21.80 175 200 25 2.08 1886.7 1.19

22.00 195 215 20 1.67 1920.0 0.85

22.20 230 245 15 1.25 1945.0 0.54

22.40 250 250 0 0.00 1945.0 0.00

Halaman 3 dari 3

DATA PENYELIDIKAN LAPANGANPENGUJIAN DUCTH CONE PENETROMETER TEST/SONDIR

Keterangan

Page 19: 1992_Sondir Pondok Cabe Udik Tangerang Selatan.

PT. BAHANA TEHNIK RAYA

Test No.

S-2Project : RUMAH TINGGAL X :Location : Perum. Modernhill, Blok E.1/16, Pondok Cabe Udik, Tangerang SelatanY :Date : Z :Operator : Capacity : 2.5 tonfChecked By : GWL : 3.0 meter

DUTCH CONE PENETROMETER TEST/SONDIR

DRMLasimin13-Aug-14

0

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

0 50 100 150 200 250 300

Dep

th (m

eter

)

qc (kg/cm²) tf/10 (kg/cm)

0

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

0 2 4 6 8 10 12

Dep

th (m

eter

)

FR (%)

Page 20: 1992_Sondir Pondok Cabe Udik Tangerang Selatan.

LAPORAN AKHIR PENYELIDIKAN TANAH

PROYEK RUMAH TINGGAL

DI PERUM MODERN HILL BLOK E.1/16

PONDOK CABE UDIK, TANGERANG SELATAN

LAMPIRAN III.

DOKUMENTASI

Page 21: 1992_Sondir Pondok Cabe Udik Tangerang Selatan.

Project RUMAH TINGGAL Operator Lasimin

Location Perum. Modernhill, Blok E.1/16, Pondok Cabe Udik, Tangerang Selatan Checked By DRMDate 13-Aug-14 GWL 2.0 meterTest No. S-3

Kedalaman Pembacaan Konus (R1)

Jumlah Perlawanan

(R2)

Perlawanan Gesek

Lokal Friksi Total Friksi Friksi Ratio

meter kg/cm² kg/cm² kg/cm² kg/cm² kg/cm %

0.00 0 0 0 0 0 0

0.20 5 10 5 0.42 8.3 0.00

0.40 3 6 3 0.25 13.3 8.33

0.60 3 6 3 0.25 18.3 8.33

0.80 4 8 4 0.33 25.0 8.33

1.00 8 12 4 0.33 31.7 4.17

1.20 10 15 5 0.42 40.0 4.17

1.40 5 10 5 0.42 48.3 8.33

1.60 5 10 5 0.42 56.7 8.33

1.80 16 18 2 0.17 60.0 1.04

2.00 8 12 4 0.33 66.7 4.17

2.20 3 6 3 0.25 71.7 8.33

2.40 2 6 4 0.33 78.3 16.67

2.60 8 12 4 0.33 85.0 4.17

2.80 4 8 4 0.33 91.7 8.33

3.00 5 10 5 0.42 100.0 8.33

3.20 10 15 5 0.42 108.3 4.17

3.40 16 18 2 0.17 111.7 1.04

3.60 8 12 4 0.33 118.3 4.17

3.80 5 10 5 0.42 126.7 8.33

4.00 10 15 5 0.42 135.0 4.17

4.20 15 20 5 0.42 143.3 2.78

4.40 10 15 5 0.42 151.7 4.17

4.60 8 12 4 0.33 158.3 4.17

4.80 16 18 2 0.17 161.7 1.04

5.00 10 15 5 0.42 170.0 4.17

5.20 18 22 4 0.33 176.7 1.85

5.40 10 15 5 0.42 185.0 4.17

5.60 10 15 5 0.42 193.3 4.17

5.80 15 20 5 0.42 201.7 2.78

6.00 25 30 5 0.42 210.0 1.67

6.20 40 50 10 0.83 226.7 2.08

6.40 25 30 5 0.42 235.0 1.67

6.60 20 25 5 0.42 243.3 2.08

6.80 16 18 2 0.17 246.7 1.04

7.00 10 15 5 0.42 255.0 4.17

7.20 60 70 10 0.83 271.7 1.39

7.40 40 50 10 0.83 288.3 2.08

7.60 25 35 10 0.83 305.0 3.33

7.80 15 20 5 0.42 313.3 2.78

8.00 30 40 10 0.83 330.0 2.78

8.20 40 50 10 0.83 346.7 2.08

8.40 25 35 10 0.83 363.3 3.33

8.60 40 50 10 0.83 380.0 2.08

8.80 60 70 10 0.83 396.7 1.39

9.00 30 40 10 0.83 413.3 2.78

9.20 50 60 10 0.83 430.0 1.67

9.40 35 45 10 0.83 446.7 2.38

9.60 60 70 10 0.83 463.3 1.39

9.80 40 50 10 0.83 480.0 2.08

10.00 30 40 10 0.83 496.7 2.78

Page 1 from 3

DATA PENYELIDIKAN LAPANGANPENGUJIAN DUCTH CONE PENETROMETER TEST/SONDIR

Keterangan

Page 22: 1992_Sondir Pondok Cabe Udik Tangerang Selatan.

Proyek RUMAH TINGGAL Operator LasiminLokasi Perum. Modernhill, Blok E.1/16, Pondok Cabe Udik, Tangerang Selatan Checked By DRMTanggal 13-Aug-14 MAT 2.0 meterTitik No. S-3

Kedalaman Pembacaan Konus (R1)

Jumlah Perlawanan

(R2)

Perlawanan Gesek

Lokal Friksi Total Friksi Friksi Ratio

meter kg/cm² kg/cm² kg/cm² kg/cm² kg/cm %

10.00 30 40 10 0.83 496.7 2.78

10.20 30 40 10 0.83 530.0 2.78

10.40 25 35 10 0.83 546.7 3.33

10.60 40 50 10 0.83 563.3 2.08

10.80 40 50 10 0.83 580.0 2.08

11.00 60 70 10 0.83 596.7 1.39

11.20 80 90 10 0.83 613.3 1.04

11.40 55 65 10 0.83 630.0 1.52

11.60 50 60 10 0.83 646.7 1.67

11.80 65 85 20 1.67 680.0 2.56

12.00 50 60 10 0.83 696.7 1.67

12.20 30 40 10 0.83 713.3 2.78

12.40 45 65 20 1.67 746.7 3.70

12.60 40 50 10 0.83 763.3 2.08

12.80 55 75 20 1.67 796.7 3.03

13.00 40 50 10 0.83 813.3 2.08

13.20 60 75 15 1.25 838.3 2.08

13.40 50 60 10 0.83 855.0 1.67

13.60 25 45 20 1.67 888.3 6.67

13.80 55 70 15 1.25 913.3 2.27

14.00 65 85 20 1.67 946.7 2.56

14.20 50 60 10 0.83 963.3 1.67

14.40 25 45 20 1.67 996.7 6.67

14.60 70 80 10 0.83 1013.3 1.19

14.80 70 80 10 0.83 1030.0 1.19

15.00 50 60 10 0.83 1046.7 1.67

15.20 65 85 20 1.67 1080.0 2.56

15.40 50 60 10 0.83 1096.7 1.67

15.60 25 45 20 1.67 1130.0 6.67

15.80 60 70 10 0.83 1146.7 1.39

16.00 50 60 10 0.83 1163.3 1.67

16.20 65 85 20 1.67 1196.7 2.56

16.40 85 105 20 1.67 1230.0 1.96

16.60 70 80 10 0.83 1246.7 1.19

16.80 45 65 20 1.67 1280.0 3.70

17.00 80 100 20 1.67 1313.3 2.08

17.20 90 115 25 2.08 1355.0 2.31

17.40 120 130 10 0.83 1371.7 0.69

17.60 105 120 15 1.25 1396.7 1.19

17.80 90 105 15 1.25 1421.7 1.39

18.00 85 100 15 1.25 1446.7 1.47

18.20 100 115 15 1.25 1471.7 1.25

18.40 100 115 15 1.25 1496.7 1.25

18.60 110 130 20 1.67 1530.0 1.52

18.80 105 125 20 1.67 1563.3 1.59

19.00 130 140 10 0.83 1580.0 0.64

19.20 105 120 15 1.25 1605.0 1.19

19.40 85 105 20 1.67 1638.3 1.96

19.60 115 125 10 0.83 1655.0 0.72

19.80 130 140 10 0.83 1671.7 0.64

20.00 120 130 10 0.83 1688.3 0.69

Page 2 from 3

DATA PENYELIDIKAN LAPANGANPENGUJIAN DUCTH CONE PENETROMETER TEST/SONDIR

Keterangan

Page 23: 1992_Sondir Pondok Cabe Udik Tangerang Selatan.

Project RUMAH TINGGAL Operator LasiminLocation Perum. Modernhill, Blok E.1/16, Pondok Cabe Udik, Tangerang Selatan Checked By DRMDate 13-Aug-14 GWL 2.0 meterTest No. S-3

Kedalaman Pembacaan Konus (R1)

Jumlah Perlawanan

(R2)

Perlawanan Gesek

Lokal Friksi Total Friksi Friksi Ratio

meter kg/cm² kg/cm² kg/cm² kg/cm² kg/cm %

20.00 120 130 10 0.83 1,688.3 0.69

20.20 105 120 15 1.25 1730.0 1.19

20.40 95 110 15 1.25 1755.0 1.32

20.60 120 130 10 0.83 1771.7 0.69

20.80 145 160 15 1.25 1796.7 0.86

21.00 165 190 25 2.08 1838.3 1.26

21.20 180 200 20 1.67 1871.7 0.93

21.40 215 240 25 2.08 1913.3 0.97

21.60 250 250 0 0.00 1913.3 0.00

Halaman 3 dari 3

DATA PENYELIDIKAN LAPANGANPENGUJIAN DUCTH CONE PENETROMETER TEST/SONDIR

Keterangan

Page 24: 1992_Sondir Pondok Cabe Udik Tangerang Selatan.

PT. BAHANA TEHNIK RAYA

Test No.

S-3Project : RUMAH TINGGAL X :Location : Perum. Modernhill, Blok E.1/16, Pondok Cabe Udik, Tangerang SelatanY :Date : Z :Operator : Capacity : 2.5 tonfChecked By : GWL : 2.0 meter

DUTCH CONE PENETROMETER TEST/SONDIR

DRMLasimin13-Aug-14

0

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

0 50 100 150 200 250 300

Dep

th (m

eter

)

qc (kg/cm²) tf/10 (kg/cm)

0

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

0 2 4 6 8 10 12

Dep

th (m

eter

)

FR (%)

Page 25: 1992_Sondir Pondok Cabe Udik Tangerang Selatan.

PHOTO KEGIATAN SONDIR (S1)

PHOTO KEGIATAN SONDIR (S2)

Page 26: 1992_Sondir Pondok Cabe Udik Tangerang Selatan.

PHOTO KEGIATAN SONDIR (S3)