What Is A Building Plan? · 2016. 1. 13. · 2012 Spring Meadow ECC School Opening ... 2009 Bunker Hill Elementary School Opening 2008 Townsend ECC School Opening 2008 Appoquinimink

Post on 14-Sep-2020

1 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

Transcript

What Is A Building Plan?

ASD’s Comprehensive Bui lding Plan includes his tor y of the S chool Dis trict’s cons truction needs as well as the next 1 0 year’s

capital im provement plan to m eet projected growth in the dis trict.

History of Construction2012 Old State Elementary School Opening2012 Spring Meadow ECC School Opening2011 Olive Loss Addit ion2011 AECC Kitchen Addit ion2009 Bunker Hill Elementary School Opening2008 Townsend ECC School Opening2008 Appoquinimink High School Opening2007 Alfred G. Waters Middle School Opening2006 Redding Middle School Addit ion2005 Cedar Lane ECC2003 Brick Mill Elementary School2002 Olive Loss Elementary School2002 Meredith Middle School Addit ion2000 Middletown High School Addit ion2000 Appoquinimink ECC1999 Cedar Lane Elementary School Addit ion1997 Middletown High School

Past K12 Construction

Population Increase 1995-2035

Appoquinimink Population

Data Source: WILMAPCOA federally designated metropolitan planning organization.

Housing Increase 1996-2026

1996 3,883

2006 7,588

2016 10,987

Appoquinimink Households

YEAR STUDENT POP.

2026 14,152

Student Enrollment

Enrollment vs. Capacity

Kindergarten Enrollment vs. Capacity

Student Enrollment

DEFICIT

Elementary School Enrollment vs. Capacity

Student Enrollment

DEFICIT

Middle School Enrollment vs. Capacity

Student Enrollment

DEFICIT

High School Enrollment vs. Capacity

Student Enrollment

DEFICIT

Future ProjectsReferendum #1 - 2016

New 1600 Student High SchoolNew 1000 Student Middle School New 840 Student Elementary SchoolRenovations & Additions to SLES Renovations to MHS & LRMSRe-design & Renovations to EMMS Safety & Security package – all schoolsCompletion of Technology upgrade districtwide

Referendum #2 - 2019New 840 Student Elementary SchoolNew Early Childhood CenterAdditional renovations, roof replacements & athletic improvements

Referendum #3 – 2022*New 1600 Student High SchoolNew 1000 Student Middle School*Based on growth

Referendum #1 Schedule

Referendum #1 to also include the fol lowing:Renovations & Addit ions to SLES Renovations to MHS & LRMSRe-design & Renovations to EMMS Safety & Security package – all schoolsComplet ion of Technology upgrade district wide

Referendum #2 Schedule

Referendum #2 to also include the fol lowing:Addit ional renovations, roof replacements & athlet ic improvements

Referendum #3 Schedule

Referendum #3 is contingent upon anticipated growth

Master Schedule

Possible Sites for New Construction

White Hall

AHS

Fairview Campus

Green Giant

White Hall Site

White Hall2 Possible Sites

E lementar y S chool

and

E arly Childhood Center

Appoquinimink High Site

AHS

PossibleE arly Childhood Center

and

Middle S chool

Green Giant Site

Green Giant

PossibleMiddle S chool

and

E arly Childhood Center

Fairview Campus Site

FairviewCampus

PossibleMiddle S chool

and

High S chool

Questions

Thank You!

top related