SWEDISH DEFENCE RESEARCH AGENCY karhen@foi.se ulf.a.jonsson@foi.se Karl Henriksson Ulf Jonsson Swedish Defence Research Agency Construction of a tool for.
Post on 12-Jan-2016
225 Views
Preview:
Transcript
SWEDISH DEFENCERESEARCH AGENCY
karhen@foi.seulf.a.jonsson@foi.se
Karl HenrikssonUlf Jonsson
Swedish Defence Research Agency
Construction of a tool for economic analysis of force structures,
and its use in the transformationof the Swedish Armed Forces
SWEDISH DEFENCERESEARCH AGENCY
karhen@foi.seulf.a.jonsson@foi.se
Agenda
• Context of the tool• The tool it self• Cross-road issue• Basis of the tool• Lessons Learned• Conclusions
SWEDISH DEFENCERESEARCH AGENCY
karhen@foi.seulf.a.jonsson@foi.se
Now + 10 years + 20 years
Step 1
Armed Forces
Structures
Step 2Step 2
Legacystructure
FutureConcepts
and vision
Method - Long Term Planning
SWEDISH DEFENCERESEARCH AGENCY
karhen@foi.seulf.a.jonsson@foi.se
EBV - The Tool
• EBV - Swedish acronym for “Economical Calculation Tool”
• Spread sheet model
• Big data base
• Economical calculations of complete future Force Structures– Economical possibilities of implementation within the timeframe – Highlighting the important decisions during the period 2005-2007– Operational use– Entire national infrastructure– Modelling of different manning provision solutions
• Quick answers to big questions
SWEDISH DEFENCERESEARCH AGENCY
karhen@foi.seulf.a.jonsson@foi.se
Cross-road issue
ConscriptionProfessional forces
Full time employed soldiers
SWEDISH DEFENCERESEARCH AGENCY
karhen@foi.seulf.a.jonsson@foi.se
Basis of the tool
• Quick economic calculation of different Force Structures over time• The base for calculation is the land, sea and air units
• Modelling different manning provisions• Modelling different infrastructure for training• Calculation of “phasing in” and “phasing out” units and equipment
SWEDISH DEFENCERESEARCH AGENCY
karhen@foi.seulf.a.jonsson@foi.se
Year 1-3 Year 4-6 Year 10-14 Year 15-19
Levelling the use of appropriation
Year 7-9£
Alt 1
Roughly levelling the use of appropriations
OperationProcurement Phasing outDevelopment
Alt 2
£
Level of appropriation
Level of appropriation
OperationProcurement Phasing outDevelopment
SWEDISH DEFENCERESEARCH AGENCY
karhen@foi.seulf.a.jonsson@foi.se
Lessons Learned - Pros
General• One single computer model = Consistent calculations• MS Excel is flexible
– “Common knowledge”.
– Easy to make changes in the tool
EBV• The tool is well suited for its purpose• The tool has been easy to use• Created wider awareness in the SwAF HQ of economical thinking
SWEDISH DEFENCERESEARCH AGENCY
karhen@foi.seulf.a.jonsson@foi.se
Lessons Learned - Cons
General• When constructing a model it is important to first find out
– which data is readily available
– what types of results are desired by decision-makers and the way to deliver the results.
• Decide on the level of generalisation of the model and try to stick to it.• Organisational inexperience of conceptual modelling => poor acceptance • Don’t use the model outside its area of validity
EBV• Risk of Force Structures design directly in the tool• Paradox: initial doubts => great enthusiasm => disapproval
– Wrong expectations of the level of detail in the results of the tool
SWEDISH DEFENCERESEARCH AGENCY
karhen@foi.seulf.a.jonsson@foi.se
Conclusions
• A very useful tool
• Figure out what types of results are desired by decision-makers
• Use already existing data when constructing a model
• Communicate what the model can and cannot be used for and don’t let it be used for anything else.
SWEDISH DEFENCERESEARCH AGENCY
karhen@foi.seulf.a.jonsson@foi.se
Questions?
karhen@foi.se
ulf.a.jonsson@foi.se
top related