Project quality plan, qa excerpts, qa checklists, safety plan, and closeout...Coastal Education Center at Fort Macon State Park

Transcript

Greenhead Construction Inc.

Greenhead Construction Inc.

• Spencer Taylor- Project Engineer • Hunter Rogerson- Superintendent• Tyler Brantley- Safety Director• Stuart Flynn- Document Control• Paul Walsh- Project Manager• Zack Slate- Lead Estimator

Fort Macon Quality Plan

Fort Macon Quality Plan

• NoteAll Third Party inspection must coordinate with the inspection log. For the inspection log schedule for all third party inspection see “Inspection Log Attachment”. All records and testing results must be sent to the Client

QA Manual Excerpts

• Procedures– Unload Material– Product verification– Material Receipt form 74-03-1-A– Inspect– Inventory Control Report, form 74-03-1-B– PO file– Material Sign-off

QA Checklist

Safety Plan

• Safety Organization• Accident Reporting• Record Keeping• OSHA Inspections• Employees Rights and Access to

Records

ASTM Standard Summary

•ASTM 185/A - No Relation

•ASTM 615/A – Rebar and Concrete Reinforcement

Fort Macon Project CLOSE OUT

• Segment 1-Developed organization chart-Developed course schedule-Chose Copper Beech as our field report jobsite

• Segment 2-Complete Contract Review-Submittal and Inspection Logs-60 day Project Schedule-Document Control Log-Work Plan (Site Layout & Logistics)

Fort Macon Project CLOSE OUT• Segment 3

-Project Estimate & Schedule-Submittals and Purchase Orders-Schedule of Values-Sub-Contractor Agreement-NC Aquarium Pier Evaluation

• Segment 4-Quality and Safety Plan-QA Manual Excerpts and Checklist-ASTM Standard Summary

Grade Curve

Overview of the Project

• Learning Experience• Enhanced Group Skills• Project Coordination•Managerial Aspects