Project quality plan, qa excerpts, qa checklists, safety plan, and closeout...Coastal Education Center at Fort Macon State Park
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Segment 4 Fort Macon

Greenhead Construction Inc.

Page 2: Segment 4 Fort Macon

Greenhead Construction Inc.

• Spencer Taylor- Project Engineer • Hunter Rogerson- Superintendent• Tyler Brantley- Safety Director• Stuart Flynn- Document Control• Paul Walsh- Project Manager• Zack Slate- Lead Estimator

Page 3: Segment 4 Fort Macon

Fort Macon Quality Plan

Page 4: Segment 4 Fort Macon

Fort Macon Quality Plan

• NoteAll Third Party inspection must coordinate with the inspection log. For the inspection log schedule for all third party inspection see “Inspection Log Attachment”. All records and testing results must be sent to the Client

Page 5: Segment 4 Fort Macon

QA Manual Excerpts

• Procedures– Unload Material– Product verification– Material Receipt form 74-03-1-A– Inspect– Inventory Control Report, form 74-03-1-B– PO file– Material Sign-off

Page 6: Segment 4 Fort Macon

QA Checklist

Page 7: Segment 4 Fort Macon

Safety Plan

• Safety Organization• Accident Reporting• Record Keeping• OSHA Inspections• Employees Rights and Access to

Records

Page 8: Segment 4 Fort Macon

ASTM Standard Summary

•ASTM 185/A - No Relation

•ASTM 615/A – Rebar and Concrete Reinforcement

Page 9: Segment 4 Fort Macon

Fort Macon Project CLOSE OUT

• Segment 1-Developed organization chart-Developed course schedule-Chose Copper Beech as our field report jobsite

• Segment 2-Complete Contract Review-Submittal and Inspection Logs-60 day Project Schedule-Document Control Log-Work Plan (Site Layout & Logistics)

Page 10: Segment 4 Fort Macon

Fort Macon Project CLOSE OUT• Segment 3

-Project Estimate & Schedule-Submittals and Purchase Orders-Schedule of Values-Sub-Contractor Agreement-NC Aquarium Pier Evaluation

• Segment 4-Quality and Safety Plan-QA Manual Excerpts and Checklist-ASTM Standard Summary

Page 11: Segment 4 Fort Macon

Grade Curve

Page 12: Segment 4 Fort Macon

Overview of the Project

• Learning Experience• Enhanced Group Skills• Project Coordination•Managerial Aspects

Page 13: Segment 4 Fort Macon

Thank You, Questions?