SAP PLM Bill of Material (BOM) Redlining
Post on 30-Nov-2014
1410 Views
Preview:
DESCRIPTION
Transcript
1
Essential SAP Tutorial
BOM Redlining on SAP PLM 7.02By
Rohan Joshi
Copyrighted 2013 by LeverX, Inc.21 October 2013
Tutorial Goal Create Bill of Material (BOM) Redline Add BOM Redline to Engineering Record (ER) Assign Object Status and Change Relevance Display Change Number (CN) and Validity Date on BOM
Redline Complete BOM Redline Process Route: Send BOM Redline for review
2 Copyrighted 2013 by LeverX, Inc.21 October 2013
3
BOM Redline:
Built-in support for review and approval process for redlines
Electronic method of proposing changes to the BOM
Includes color coded visual indication of changes to the BOM
21 October 2013 Copyrighted 2013 by LeverX, Inc.
Create BOM Redline:
4 Copyrighted 2013 by LeverX, Inc.
Login SAP NWBC
Click Material BOM
Select Display Material BOMs
Enter Material, Plant, Usage and Alternative
Click Continue
21 October 2013
5
Create BOM Redline: Contd.
On Display Material BOM screen, click Redlining
Click Create
Enter Name and Description
Click Ok and click Save
21 October 2013 Copyrighted 2013 by LeverX, Inc.
6
Assign BOM Redline to ER: Click Add to
Engineering Record
Enter Existing Engineering Record
Click Ok
Click Save
21 October 2013 Copyrighted 2013 by LeverX, Inc.
7
Assign Status and Chg. Relevance: Enter INPR (In Process)
for Status and CHG (Change) for Chg. Relevance on the ER
Click Save
21 October 2013 Copyrighted 2013 by LeverX, Inc.
8
Display CN and Validity Date:
View CN and Validity Date copied from the ER
The CN allows the user to track changes made to the BOM
21 October 2013 Copyrighted 2013 by LeverX, Inc.
9
Complete BOM Redline: Change component quantity
(Green), add a new component (Yellow), delete an existing component (Red)
View color coded representation of changes
Set redline status to Completed
Click Save
Perform Redline approval process
21 October 2013 Copyrighted 2013 by LeverX, Inc.
10
Process Routes: Process Route task is
created to send a notification out to the user to review and approve BOM redline
Click Add Sequential Task
Fill in required fields and click Ok
Click Start Workflow and click Save
21 October 2013 Copyrighted 2013 by LeverX, Inc.
11
Conclusion:
Easy to implement changes on a desired validity date
Simple method to update changes to the BOM
The electronic color coded review and approval process enables users to track changes easily
Puts an end to manual paper based BOM Redlining techniques
21 October 2013 Copyrighted 2013 by LeverX, Inc.
Contact Information
Please contact us for more information about our services or solutions available.
LeverX, Inc. 800 West El Camino Real, Suite 180
Mountain View, CA 94040 USATel: (650) 625 – 8347
Web Site: www.LeverX.com12 Copyrighted 2013 by LeverX, Inc.21 October 2013
top related