Essential SAP Tutorial BOM Redlining on SAP PLM 7.02 By Rohan Joshi Copyrighted 2013 by LeverX, Inc. 1 21 October 2013
12

SAP PLM Bill of Material (BOM) Redlining

Nov 30, 2014

Download

Technology

LeverX

Short tutorial on the usage of SAP Bill of Material (BOM) redlining in SAP PLM 7.
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: SAP PLM Bill of Material (BOM) Redlining

1

Essential SAP Tutorial

BOM Redlining on SAP PLM 7.02By

Rohan Joshi

Copyrighted 2013 by LeverX, Inc.21 October 2013

Page 2: SAP PLM Bill of Material (BOM) Redlining

Tutorial Goal Create Bill of Material (BOM) Redline Add BOM Redline to Engineering Record (ER) Assign Object Status and Change Relevance Display Change Number (CN) and Validity Date on BOM

Redline Complete BOM Redline Process Route: Send BOM Redline for review

2 Copyrighted 2013 by LeverX, Inc.21 October 2013

Page 3: SAP PLM Bill of Material (BOM) Redlining

3

BOM Redline:

Built-in support for review and approval process for redlines

Electronic method of proposing changes to the BOM

Includes color coded visual indication of changes to the BOM

21 October 2013 Copyrighted 2013 by LeverX, Inc.

Page 4: SAP PLM Bill of Material (BOM) Redlining

Create BOM Redline:

4 Copyrighted 2013 by LeverX, Inc.

Login SAP NWBC

Click Material BOM

Select Display Material BOMs

Enter Material, Plant, Usage and Alternative

Click Continue

21 October 2013

Page 5: SAP PLM Bill of Material (BOM) Redlining

5

Create BOM Redline: Contd.

On Display Material BOM screen, click Redlining

Click Create

Enter Name and Description

Click Ok and click Save

21 October 2013 Copyrighted 2013 by LeverX, Inc.

Page 6: SAP PLM Bill of Material (BOM) Redlining

6

Assign BOM Redline to ER: Click Add to

Engineering Record

Enter Existing Engineering Record

Click Ok

Click Save

21 October 2013 Copyrighted 2013 by LeverX, Inc.

Page 7: SAP PLM Bill of Material (BOM) Redlining

7

Assign Status and Chg. Relevance: Enter INPR (In Process)

for Status and CHG (Change) for Chg. Relevance on the ER

Click Save

21 October 2013 Copyrighted 2013 by LeverX, Inc.

Page 8: SAP PLM Bill of Material (BOM) Redlining

8

Display CN and Validity Date:

View CN and Validity Date copied from the ER

The CN allows the user to track changes made to the BOM

21 October 2013 Copyrighted 2013 by LeverX, Inc.

Page 9: SAP PLM Bill of Material (BOM) Redlining

9

Complete BOM Redline: Change component quantity

(Green), add a new component (Yellow), delete an existing component (Red)

View color coded representation of changes

Set redline status to Completed

Click Save

Perform Redline approval process

21 October 2013 Copyrighted 2013 by LeverX, Inc.

Page 10: SAP PLM Bill of Material (BOM) Redlining

10

Process Routes: Process Route task is

created to send a notification out to the user to review and approve BOM redline

Click Add Sequential Task

Fill in required fields and click Ok

Click Start Workflow and click Save

21 October 2013 Copyrighted 2013 by LeverX, Inc.

Page 11: SAP PLM Bill of Material (BOM) Redlining

11

Conclusion:

Easy to implement changes on a desired validity date

Simple method to update changes to the BOM

The electronic color coded review and approval process enables users to track changes easily

Puts an end to manual paper based BOM Redlining techniques

21 October 2013 Copyrighted 2013 by LeverX, Inc.

Page 12: SAP PLM Bill of Material (BOM) Redlining

Contact Information

Please contact us for more information about our services or solutions available.

LeverX, Inc. 800 West El Camino Real, Suite 180

Mountain View, CA 94040 USATel: (650) 625 – 8347

Web Site: www.LeverX.com12 Copyrighted 2013 by LeverX, Inc.21 October 2013