Perencanaan parkir jts

Post on 09-Aug-2015

44 Views

Category:

Education

1 Downloads

Preview:

Click to see full reader

Transcript

METODE KONSTRUKSIPEMINDAHAN TANAH MEKANIS

Oleh Kelompok 6:

Wildan Yoga Pratama I1114082Yopi Saparudin I1114083Yosethyaji Arif Setiawan I1114084Yudi Risdiyanto I1114085

1. VOLUME TANAH

Luas Lahan 475 m2

Volume Galian 807,5 m3 (BM)

Dalam galian 1,7 m

Volume tanah keadaan Bank (BM), volume tanah keadaan Loose (LM), volume stripping dan Volume dipadatkan (CM)

Volume Bank ( BM ) = 807,5 m3

Volume Loose ( LM ) = Koef. volume Loose x Volume Bank

= 1.2 x 807.5

= 969 m3

Volume Stripping = Luas Lahan x Tebal Stripping

= 475 m2 x 0,3 m

= 142,5 m3 (BM)

= 142,5 x 1,2 = 171 m3 (LM)

Volume Compact (CM) = Koef. volume Compact x (BM – Volume stripping)

= 0.8 x ( 807,5 – 142,5 )

= 532 m3

2. ALAT KERJA

BULLDOZER KOMATSU D31P-20

Untuk stripping Lapisan

permukaan tanah

EXCAVATOR BACKHOE KOMATSU PC100

Untuk malaksanakan pekerjaan

galian tanah dan loading ke dumptruck

DUMP TRUCK HINO DUTRO 130 HD 6,8 PS

Untuk mengangkut tanah hasil

galian menuju lembah teknik untuk

dipadatkan

TANDEM ROLLER KOMATSU S6D102E

Untuk melaksanakan pekerjaan

pemadatan tanah

3. METODE KERJA

a. Clearing & Stripping

b. Pekerjaan Galian

c. Pekerjaan Pemadatan

4. STRIPPING

Produktifitas alat dihitung dengan cara berikut.

Efisiensi kerja = 85% (50 menit per jam)

Fixed time = 0,15 menit

Tebal stripping = 0,3 m

Jarak gusur = 15 m

Volume tanah = 142,5 m3

Volume lepas = 1,25 × 142,5

= 178,125 m3

Load factor = Vb/Vl

= 142,5 /178,125

= 0,8 (swell 20%)

Kapasitas pisau = 2,875 × 0,3

= 0,863 m3

Kapasitas (bank) = 0,863 × 0,8

= 0,69 m3

Waktu maju =

=

= 0,20 menit

Waktu mundur =

=

= 0,15 menit

= 0,5 menit

Total cycle time (CT)= fixed time + waktu maju + waktu mundur

= 0,15 + 0,2 + 0,15

= 0,5 menit

Total produktifitas =

=

= 55,2 m3/jam

Pekerjaan pembersihan dilakukan dengan alat jenis bulldozer buatan Komatsu D31P-20 dengan produktivitas 55,2 m3/jam. Perkiraan kebutuhan alat dan waktu dihitung dengan cara berikut.

Volume stripping = 142,5 m3

Produktivitas = 55,2 m3/jam

Jumlah alat = 1 buah

Waktu pekerjaan =

=

= 2,58 jam

5. CUTING & LOADING

Produktifitas alat dihitung dengan cara berikut.

Efisiensi kerja = 85% (50 menit per jam)

Fill factor = 100 % (tanah loose)

Kapasitas bucket = 0,55 m3

Waktu menggali (t1) = 5 detik

Waktu wing (t2) = 7 detik (90º)

Waktu membuang (t3) = 5 detik (truk)

Total cycle time (CT)= t1 + 2t2 + t3

= 5 + (2 × 7) + 5

= 24 detik

= 0,4 menit

Total produktifitas =

=

= 83,33 m3/jam

Setelah pekerjaan pembersihan maka dilanjutkan pekerjaan galian dengan alat excavator buatan buatan Komatsu tipe PC100 yang langsung ditujukan ke alat angkut dengan produktivitas alat sebesar 83,33 m3/jam Perkiraan kebutuhan dan waktu dihitung dengan cara berikut.

Volume galian = 807,5 m3

Produktivitas = 83,33 m3/jam

Jumlah alat = 1 buah

Waktu pekerjaan =

=

= 9,69 jam

6. TRANSPORTING

Produktifitas alat dihitung dengan cara berikut.

Efisiensi kerja = 85% (50 menit per jam)

Fill factor = 100 % (tanah loose)

Jarak angkut = 400 m

Kapasitas bucket = 7 m3

Kapasitas berat = kapasitas bucket(bank) × konversi tanah

= (7 / 1,25) × 1,6

= 8960 kg = 8,96 ton

Berat total = berat dump truck

+ berat angkut

= 2355 + 8960

= 11315 kg = 11,315 ton

 Tahanan gelinding = 60 lb/ton

Tahanan kelandaian = 2% x 20 lb/ton = -40 lb/ton

Tahanan total = 20 lb/ton

Rimpull yang diperlukan= 20 lb/ton x 11,315 ton = 226,3 lb

Pada waktu mengangakat beban kecepatan maksimum truck

hanya bisa mencapai 32,7

Tahanan gelinding = 60 lb/ton

Tahanan kelandaian = 2% x 20 lb/ton

= 40 lb/ton

Tahanan total = 100 lb/ton

Berat kosong truck = 2,57 ton

Rimpull yang diperlukan = 100 lb/ton x 2,355 ton

= 235,5 lb

Pada waktu mengangakat beban kecepatan maksimum truck

hanya bisa mencapai 32,7 m

Cycle time

Loading = = 0,188 jam

Mengangkut = = 0,00856 jam

Kembali = = 0,00856 jam

Fixed time 2 menit = 0,033 jam

Membuang dan mengatur posisi 1 menit = 0,0165 jam

Total cycle time = 0,2053 jam = 13 menit

Jumlah trip / jam = 60/13 = 4,6 trip ~ 4 trip

Produksi alat angkut = jumlah trip × kapasitas alat angkut

= 4 × 7

= 28 m3/jam

Manajemen faktor dan medan kerja baik = 0,85 (baik)

Total produktifitas = Efisiensi kerja × FM × produktifitas

= 0,85 × 0,85 × 28

= 20,23 m3/jam

Keperluan alat =

=

= 4,1 ≈ 4 buah

Pekerjaan pengangkutan dilakukan dengan alat jenis DUMP TRUCK Hino type Dutro dengan produktivitas alat sebesar 20,33 m3/jam. Pekerjaan pengangkutan dihitung dengan cara berikut.

Volume pemuatan = 969 m3 (loose)

Produktivitas = 20,33 m3/jam

Jumlah alat = 4 buah

Waktu pekerjaan =

=

= 11,91 jam

7. COMPACTING

Volume tanah compact (disyaratkan) = 532 m3

Luas Lembah Teknik = 34 m x 25 m = 850 m2

Ditetapkan tebal tanah = 60 cm; 3 layer tanah @ 20 cm

Didapat volume tanah compact = 850 m2 x 0,6 m = 510 m3

Pemadatan tanah menggunakan alat Tandem Roller Komatsu tipe S6D102E berat 22266.7 lb

Lebar efektif compactor = 213 cm

Jumlah pass yang diperlukan = 10 kali

Kecepatan operasi = 5  km/h

Kondisi manajemen baik dan kondisi medan baik

Produksi compactor / jam = = 798,75 m2/lapis/jam

Waktu pemadatan = = 1,064 jam/lapis

Lapis tanah = 4 lapis

Waktu total pemadatan = 1,064 x 4 = 4,256 jam

Waktu pengerjaan = 4,25 / 8 = 0,53 hari ~ 1 hari

8. ESTIMASI BIAYA

No Nama Alat Jumlah Waktu Kerja (jam) Harga Sewa Per Jam Total 1 Bulldozer 1 2,58 IDR 130.000,00 IDR 335.400,002 Excavator 1 9,69 IDR 190.000,00 IDR 1.841.100,003 Dump Truck 4 11,91 IDR 68.750,00 IDR 3.275.250,004 Tandem Roller 1 8 IDR 14.000,00 IDR 112.000,00

5.563.750,00IDR

No Nama Jumlah Waktu Kerja (jam) Harga Sewa Per Jam Total 1 Op. Dump Truck 4 11,91 12.500,00IDR 595.500,00IDR 3 Op.Bulldozer 1 2,58 13.750,00IDR 35.475,00IDR

630.975,00IDR

No Nama Bahan Jumlah Waktu Kerja (jam) Harga Bahan Total 1 Solar Dump Truck 4 11,91 110.000,00IDR 5.240.400,00IDR 2 Solar bulldozer 1 2,58 95.200,00IDR 245.616,00IDR

No Nama Kegiatan Satuan Jumlah Harga Total 1 Mobilisasi Alat ls 1 3.000.000,00IDR 3.000.000,00IDR

8.486.016,00IDR 14.680.741,00IDR

1.468.075,00IDR 16.148.816,00IDR

SEWA ALAT

TotalTENAGA KERJA

TotalBAHAN

Total

MOBILITAS

Total Biaya PelaksanaanJasa10%TOTAL

SEKIAN

TERIMA KASIH

top related