J.I.T. - Just In Time. History. The basic elements of JIT were developed by Toyota in the 1950s. This evolved into the Toyota Production System . Adopted, as part of ‘Lean manufacturing’, by many process manufacturers. Supplier. Stock. Process. What is JIT and why do we do it?. - PowerPoint PPT Presentation

Transcript

J.I.T. -Just In Time

• The basic elements of JIT were developed by Toyota in the 1950s.

• This evolved into the Toyota Production System.

• Adopted, as part of ‘Lean manufacturing’, by many process manufacturers

History

What is JIT and why do we do it?

Supplier Stock Process

• Minimise level• Working capital• Cashflow• Space• Avoid

obsolescence

• Demand driven• Easy to plan• Continuous• Flexible• Part of Lean

• Aligned to plan• Continuity of

supply critical• Quality control• Spread risk

What is JIT and why do we do it?

• This theory is applicable to repetitive manufacturing processes• Ensure that the right parts are in the right place at the right time• Minimise waste by reducing inventory (increasing inventory

turnover)• Ensure the use of a stable plan (no late/ rush orders)• Ensure quick set up times on all production lines• This allows short production runs & small purchasing lot sizes• Use preventative maintenance plans (during non production time

to avoid unexpected breakdowns)• Ensure that there is a well trained flexible workforce (to minimise

line manning issues)• Implement a supplier quality assurance programme (to ensure

there are no issues with raw materials)

• Each order is exploded into its component parts• Production orders are raised and scheduled on the production

plan• Raw material orders are raised by the Buyers/ Resource

Planners• Raw material delivery schedules are agreed with the suppliers• Materials are stored close to their point of use• Production personnel request materials using a computerised

Kanban system• A preventative maintenance system is used to maintain

production lines• A vendor appraisal/ supplier award system is used to maintain

quality/ cost/ service

Case Study – Edrington

Production Order - sample

Break out production order

Delivery Schedule

Dry Goods Storage

Kanban

 

RDT – Picking List

Vendor Appraisal95.4 95.0

92.290.8 89.6 89.5 89.2 89.1 88.9 88.5 87.9 87.7 87.3 86.4 85.5 85.3 84.6

83.081.5 81.3 79.9 78.9 78.1

60.00

65.00

70.00

75.00

80.00

85.00

90.00

95.00

100.00

Interlok

SK

Corrugate

Haven

Labelgraphics

Beam

glow

P. P

roducts

Gilm

our and Dean

McN

aughtans

JC R

ibeiro

SK

Com

posite

UC

P

Ardagh G

lass

Allied G

lass

Guala

Lithoprint

OI A

lloa

Stölzle Flaconnage

Chesapeake E

K

John Watson

Mt G

abriel

Erben

MS

O C

leland

AC

Relvas

top related