MBA.782.J.I.T. CAJ9.10.1 Operations Management Just-In-Time J.I.T. Philosophy Characteristics of J.I.T. J.I.T. in Services J.I.T. Implementation Issues Benefits of J.I.T.
32

MBA.782.J.I.T.CAJ9.10.1 Operations Management Just-In-Time J.I.T. Philosophy Characteristics of J.I.T. J.I.T. in Services J.I.T. Implementation Issues.

Dec 28, 2015

Download

Documents

Charles Dalton
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: MBA.782.J.I.T.CAJ9.10.1 Operations Management Just-In-Time J.I.T. Philosophy Characteristics of J.I.T. J.I.T. in Services J.I.T. Implementation Issues.

MBA.782.J.I.T. CAJ9.10.1

Operations Management

Just-In-Time

• J.I.T. Philosophy

• Characteristics of J.I.T.

• J.I.T. in Services

• J.I.T. Implementation Issues

• Benefits of J.I.T.

Page 2: MBA.782.J.I.T.CAJ9.10.1 Operations Management Just-In-Time J.I.T. Philosophy Characteristics of J.I.T. J.I.T. in Services J.I.T. Implementation Issues.

MBA.782.J.I.T. CAJ9.10.2

• Goal of full employment in post-WW II period

• Government (MITI) supported improvement of targeted industries

• Imported technologies

• Efforts concentrated on factory floor

• Leads to success in ________ markets

• U.S. industry _______ ___

Just-In-Time

Japanese Approach to Productivity

Page 3: MBA.782.J.I.T.CAJ9.10.1 Operations Management Just-In-Time J.I.T. Philosophy Characteristics of J.I.T. J.I.T. in Services J.I.T. Implementation Issues.

MBA.782.J.I.T. CAJ9.10.3

• “Big JIT” (Lean Production System)

– is primarily a ________________ of management that stresses three fundamental concepts:

1. The Elimination of ________ 2. Continuous Improvement

3. Respect for ________• “Little JIT”

– Focuses more _____________ on scheduling goods inventories and providing service resources where and when needed ....

Just-In-Time

JIT: Part Philosophy-Part Technique

Page 4: MBA.782.J.I.T.CAJ9.10.1 Operations Management Just-In-Time J.I.T. Philosophy Characteristics of J.I.T. J.I.T. in Services J.I.T. Implementation Issues.

MBA.782.J.I.T. CAJ9.10.4

Just-In-Time

Elimination of Waste

• Short Definition:

– Waste is anything that does not add

________ to the product

• Value means satisfying the customer’s needs,

both actual and perceived,

at a price the customer can afford and

feels is reasonable.

• Adding value does not mean _________ costs .

Page 5: MBA.782.J.I.T.CAJ9.10.1 Operations Management Just-In-Time J.I.T. Philosophy Characteristics of J.I.T. J.I.T. in Services J.I.T. Implementation Issues.

MBA.782.J.I.T. CAJ9.10.5

(1) Waste from overproduction

(2) Waste of waiting time

(3) Transportation waste

(4) _____________ waste

(5) Processing waste

(6) Waste of __________

(7) Waste from product defects ....

Just-In-Time

Toyota’s Seven Categories of Waste

Page 6: MBA.782.J.I.T.CAJ9.10.1 Operations Management Just-In-Time J.I.T. Philosophy Characteristics of J.I.T. J.I.T. in Services J.I.T. Implementation Issues.

MBA.782.J.I.T. CAJ9.10.6

• Group Technology

• JIT Production

• Kanban Production Control Systems

• Reducing Setup Times

• Uniform Plant Loading

• JIT Inventory

Just-In-Time

Methods of Attacking Waste

Page 7: MBA.782.J.I.T.CAJ9.10.1 Operations Management Just-In-Time J.I.T. Philosophy Characteristics of J.I.T. J.I.T. in Services J.I.T. Implementation Issues.

MBA.782.J.I.T. CAJ9.10.7

Just-In-Time

Page 8: MBA.782.J.I.T.CAJ9.10.1 Operations Management Just-In-Time J.I.T. Philosophy Characteristics of J.I.T. J.I.T. in Services J.I.T. Implementation Issues.

MBA.782.J.I.T. CAJ9.10.8

• Movement is waste

• Group Technology and work cells to ________ distance to move people and materials

• Flexible or movable equipment to increase flexibility

• Design _________ space for inventory

Attacking Waste

Group Technology

Page 9: MBA.782.J.I.T.CAJ9.10.1 Operations Management Just-In-Time J.I.T. Philosophy Characteristics of J.I.T. J.I.T. in Services J.I.T. Implementation Issues.

MBA.782.J.I.T. CAJ9.10.9

• Departmental Specialization

Saw Saw

Lathe PressPress

Grinder

LatheLathe

Saw

Press

Heat Treat

Grinder

Attacking Waste

Group Technology

Page 10: MBA.782.J.I.T.CAJ9.10.1 Operations Management Just-In-Time J.I.T. Philosophy Characteristics of J.I.T. J.I.T. in Services J.I.T. Implementation Issues.

MBA.782.J.I.T. CAJ9.10.10 9

• Group technology cells

Press

Lathe

Grinder

Grinder

A

2

BSaw

Heat Treat

LatheSaw Lathe

PressLathe

1

Attacking Waste

Group Technology

Page 11: MBA.782.J.I.T.CAJ9.10.1 Operations Management Just-In-Time J.I.T. Philosophy Characteristics of J.I.T. J.I.T. in Services J.I.T. Implementation Issues.

MBA.782.J.I.T. CAJ9.10.11

• Management philosophy• _____ system though the plant

WHAT IT IS

• Employee participation• Industrial engineering/basics• Continuing improvement• Total quality control• Small lot sizes

WHAT IT REQUIRES

• Attacks waste• ________ problems and bottlenecks• Achieves streamlined production

WHAT IT DOES

• Stable environment

WHAT IT ASSUMES

Attacking Waste

Just-In-Time Production

Page 12: MBA.782.J.I.T.CAJ9.10.1 Operations Management Just-In-Time J.I.T. Philosophy Characteristics of J.I.T. J.I.T. in Services J.I.T. Implementation Issues.

MBA.782.J.I.T. CAJ9.10.12

Traditional Push System

• Material is “_________” onto downstream workstations regardless of whether the resources are available.

• Production begins in __________ of customer needs

• Emphasis on production; production first

• “_______” ahead of next unit

– good selection from which to build efficient schedules and improve utilization

Just-In-Time Production

Push vs. Pull

Page 13: MBA.782.J.I.T.CAJ9.10.1 Operations Management Just-In-Time J.I.T. Philosophy Characteristics of J.I.T. J.I.T. in Services J.I.T. Implementation Issues.

MBA.782.J.I.T. CAJ9.10.13

J.I.T. Pull System

• Customer _________ activates production so it produces only when it is needed

• Material is “__________” to a workstation just as it is needed.

• Supplies and components are pulled through the

system to arrive ______ they are needed _______ they are needed.

Just-In-Time Production

Push vs. Pull

Page 14: MBA.782.J.I.T.CAJ9.10.1 Operations Management Just-In-Time J.I.T. Philosophy Characteristics of J.I.T. J.I.T. in Services J.I.T. Implementation Issues.

MBA.782.J.I.T. CAJ9.10.14

• Kanban is Japanese for ______, or “instruction card”

• It is a simple _________ pull system for controlling inventory in the production system based on a standardized container or lot size.

• Toyota uses two types of kanbans;

– production kanban - authorizes ____________ of a given number of parts

– withdrawal kanban - authorizes the ___________ of a given number of parts.

Attacking Waste

Kanban Production Control Systems

Page 15: MBA.782.J.I.T.CAJ9.10.1 Operations Management Just-In-Time J.I.T. Philosophy Characteristics of J.I.T. J.I.T. in Services J.I.T. Implementation Issues.

MBA.782.J.I.T. CAJ9.10.15

The final assemblyschedule drives thewhole process.

A

B

Storage

Machine Center Assembly Line

ProductionKanban

WithdrawalKanban

Attacking Waste

Kanban Production Control Systems

Page 16: MBA.782.J.I.T.CAJ9.10.1 Operations Management Just-In-Time J.I.T. Philosophy Characteristics of J.I.T. J.I.T. in Services J.I.T. Implementation Issues.

MBA.782.J.I.T. CAJ9.10.16

To Lower Cycle Inventory, _________ Lot Size...

Average cycle inventory

Lot size = 100

Lot size = 50

On-

hand

inve

ntor

y

5 10 15 20 25 30Time (hours)

100 –

75 –

50 –

25 –

0 –

Attacking Waste

Reducing Setup Times

Page 17: MBA.782.J.I.T.CAJ9.10.1 Operations Management Just-In-Time J.I.T. Philosophy Characteristics of J.I.T. J.I.T. in Services J.I.T. Implementation Issues.

MBA.782.J.I.T. CAJ9.10.17

Lot size = 5Lot 1 Lot 2

Lot size = 2

Lot 1 Lot 2 Lot 3 Lot 4 Lot 5

However, reducing lot sizes __________ the number of lots...

Minimizing Setup Times

Small Lot Sizes

Lot size = 10

Lot 1

Page 18: MBA.782.J.I.T.CAJ9.10.1 Operations Management Just-In-Time J.I.T. Philosophy Characteristics of J.I.T. J.I.T. in Services J.I.T. Implementation Issues.

MBA.782.J.I.T. CAJ9.10.18

Just-In-Time

Small Lot Sizes

...which ___________ Inventory Costs...

-

100

200

300

400

500

600

700

800

900

1,000

0 50 100 150 200 250

Quantity

Tota

l Ann

ual C

ost

Total Cost

Holding Cost

Setup Cost

Page 19: MBA.782.J.I.T.CAJ9.10.1 Operations Management Just-In-Time J.I.T. Philosophy Characteristics of J.I.T. J.I.T. in Services J.I.T. Implementation Issues.

MBA.782.J.I.T. CAJ9.10.19

Just-In-Time

Small Lot Sizes...unless Setup Costs are _________ ...

-

100

200

300

400

500

600

700

800

900

1,000

0 50 100 150 200 250

Quantity

Tota

l Ann

ual C

ost

Total Cost

Holding Cost

Setup Cost

Page 20: MBA.782.J.I.T.CAJ9.10.1 Operations Management Just-In-Time J.I.T. Philosophy Characteristics of J.I.T. J.I.T. in Services J.I.T. Implementation Issues.

MBA.782.J.I.T. CAJ9.10.20

• Does not mean building a single product

• Make _______ materials use schedules

• Distribute production quantities ________ over time (firm monthly schedules)

• Build the ______ mix of products every day

– using smaller lot sizes

Attacking Waste

Uniform Plant Loading

Page 21: MBA.782.J.I.T.CAJ9.10.1 Operations Management Just-In-Time J.I.T. Philosophy Characteristics of J.I.T. J.I.T. in Services J.I.T. Implementation Issues.

MBA.782.J.I.T. CAJ9.10.21

A A B B B C

JIT Small Lots

Time

A A B B B C

A

Large-Lot Approach

Time

A A A B B B B B B C C

• J.I.T. produces the same amount in the same time ____ setup times (costs) are lowered.• Small lots also increase flexibility to meet customer demands.

Attacking Waste

Uniform Plant Loading

Page 22: MBA.782.J.I.T.CAJ9.10.1 Operations Management Just-In-Time J.I.T. Philosophy Characteristics of J.I.T. J.I.T. in Services J.I.T. Implementation Issues.

MBA.782.J.I.T. CAJ9.10.22

• __________ the number of suppliers

• Buyer and supplier form _______________ to reduce waste

• _______________ supplier relationships to

– improve the on-time delivery

– minimize paperwork

– make frequent deliveries in small lot sizes

– reduce in-plant and in-transit inventories

Just-In-Time

Suppliers

Page 23: MBA.782.J.I.T.CAJ9.10.1 Operations Management Just-In-Time J.I.T. Philosophy Characteristics of J.I.T. J.I.T. in Services J.I.T. Implementation Issues.

MBA.782.J.I.T. CAJ9.10.23

• Employee _______________ in product and process improvements

• Requires

– Employee empowerment

– Cross-trained employees

– fewer job classifications to ensure flexibility of employees.

– training support

– quality at the source

Just-In-Time

Flexible Workforce

Page 24: MBA.782.J.I.T.CAJ9.10.1 Operations Management Just-In-Time J.I.T. Philosophy Characteristics of J.I.T. J.I.T. in Services J.I.T. Implementation Issues.

MBA.782.J.I.T. CAJ9.10.24

Just-In-Time

Page 25: MBA.782.J.I.T.CAJ9.10.1 Operations Management Just-In-Time J.I.T. Philosophy Characteristics of J.I.T. J.I.T. in Services J.I.T. Implementation Issues.

MBA.782.J.I.T. CAJ9.10.25

Continuous Improvement

J.I.T. Inventory

• Traditional View:

– inventory exists “just-in-______” problems arise.

• J.I.T. Tactics

– substantially reduce, if not eliminate, inventory

– inventory is the “root of all ______”

– only the minimum inventory necessary to keep the system running.

– inventory reduction ___________ the problems and provides opportunities for improvement

Page 26: MBA.782.J.I.T.CAJ9.10.1 Operations Management Just-In-Time J.I.T. Philosophy Characteristics of J.I.T. J.I.T. in Services J.I.T. Implementation Issues.

MBA.782.J.I.T. CAJ9.10.26

ScrapUnreliable

VendorsCapacity

Imbalances

J.I.T. Inventory

Lowering Inventory Reduces Waste

W.I.P. inventory level(hides problems)

Page 27: MBA.782.J.I.T.CAJ9.10.1 Operations Management Just-In-Time J.I.T. Philosophy Characteristics of J.I.T. J.I.T. in Services J.I.T. Implementation Issues.

MBA.782.J.I.T. CAJ9.10.27

ScrapUnreliable

VendorsCapacity

Imbalances

J.I.T. Inventory

Lowering Inventory Reduces Waste

Reducing inventory _________problems so they can be solved.

W.I.P.

Page 28: MBA.782.J.I.T.CAJ9.10.1 Operations Management Just-In-Time J.I.T. Philosophy Characteristics of J.I.T. J.I.T. in Services J.I.T. Implementation Issues.

MBA.782.J.I.T. CAJ9.10.28

Scrap

Reducing inventory further reveals_______ problems to be solved.

Unreliable Vendors

Capacity Imbalances

W.I.P.

J.I.T. Inventory

Lowering Inventory Reduces Waste

Page 29: MBA.782.J.I.T.CAJ9.10.1 Operations Management Just-In-Time J.I.T. Philosophy Characteristics of J.I.T. J.I.T. in Services J.I.T. Implementation Issues.

MBA.782.J.I.T. CAJ9.10.29

All the J.I.T. techniques used in manufacturing

are used in services:

Suppliers - food delivery to restaurants Layouts - baggage claim area at airport Inventory - pharmeceuticals networks Scheduling - personnel schedules rather

than production / inventory

Just-In-Time

J.I.T. in Services

Page 30: MBA.782.J.I.T.CAJ9.10.1 Operations Management Just-In-Time J.I.T. Philosophy Characteristics of J.I.T. J.I.T. in Services J.I.T. Implementation Issues.

MBA.782.J.I.T. CAJ9.10.30

Just-In-Time

Implementation Issues

• Requires time, trust, and changing _____________

• Putting a new philosophy into action

– allowing utilization to ______– reduction in buffer inventory

– allowing workers to ______ the line

– trusting vendors and customers

– committing resources to train workers

– gaining worker ______

Page 31: MBA.782.J.I.T.CAJ9.10.1 Operations Management Just-In-Time J.I.T. Philosophy Characteristics of J.I.T. J.I.T. in Services J.I.T. Implementation Issues.

MBA.782.J.I.T. CAJ9.10.31

Reduced _____________ investment Reduced _________ requirements Reduced manufacturing lead times

Increased labor ______________ Simplier planning systems Work force participation Increased product quality

Just-In-Time

Benefits of J.I.T.

Page 32: MBA.782.J.I.T.CAJ9.10.1 Operations Management Just-In-Time J.I.T. Philosophy Characteristics of J.I.T. J.I.T. in Services J.I.T. Implementation Issues.

MBA.782.J.I.T. CAJ9.10.32

Read Chapter 10

Concepts / Terminology

Review Lecture Notes

Just-In-Time

Chapter Wrap-Up