Introduction to HMMH Progra… · 20/06/2018  · HMMH Overview: Roundtable Assistance Fort Lauderdale – Hollywood International Airport Noise Advisory Committee •HMMH involved

Post on 09-Aug-2020

0 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

Transcript

Introduction to HMMH Presented to CLT Airport Community Roundtable

June 20, 2018

Gene Reindel

HMMH Overview: Our Mission

HMMH solves complex problems affecting our environment

We develop and apply innovative technical tools, communicate

effectively, and exceed client expectations

HMMH Overview: Aviation Services

Noise

Air Quality

Airport and Airspace Design

Renewable Energy

Software Tools

Training

HMMH Overview: Roundtable Assistance

Fort Lauderdale – Hollywood International Airport Noise Advisory Committee • HMMH involved since 1990 as the Noise Consultant to Broward County Aviation

Department

San Francisco International Airport/Community Noise Roundtable • HMMH involved since the 1990s

• Currently Technical Consultant to the Roundtable

Oakland Airport/Community Noise Management Forum • HMMH involved since 1997 as the Noise Consultant to the Port of Oakland

Baltimore/Washington International Thurgood Marshall Airport Community Roundtable • HMMH involved since its inception in 2017

4

DC Metroplex BWI Community Roundtable

Initiative of the Maryland Aviation Administration • At the request of the FAA

Responsibilities include: • Monitoring the implementation of air traffic procedures

• Identifying possible alternatives

• Evaluating noise effects and other environmental effects of possible route changes

• Making recommendations to the FAA for further consideration

5

DC Metroplex BWI Community Roundtable

HMMH Role • Facilitate monthly Roundtable meetings

• Provide support to MAA staff in preparation of meetings and conference calls

• Prepare legislative and community briefings

• Prepare and present flight track and complaint data to Roundtable

• Participate in FAA’s Capital Project Working Group and Review

• Develop Roundtable web-portal and educational materials

6

Reported Change Los Angeles International Airport

Prepared for the LAX/Community Noise Roundtable

7

LAX Northerly Arrivals

8

February 2014 February 2015 September 2015

LAX Northerly Arrivals – Altitude Density Plots

9

February 2014

February 2015

September 2015

NextGen Aircraft Procedures Southern California Metroplex – Analysis Prior to Implementation

Prepared for Elected Officials

10

LAX Runway 25L Arrivals (No Action Procedures) Flight Track Density

11

LAX Comparison of Runway 25L Arrivals (No Action Procedures) to Runway 25L Arrivals (Proposed Action Procedures)

12

NextGen Aircraft Procedures Northern California Metroplex – Analysis After Implementation

Prepared for Oakland International Airport Community Noise Forum (roundtable)

13

Flight Track Evaluations – RAIDR

14

OAK Arrivals through “Montclair” Gate: April 1 – September 30, 2014

Flight Track Evaluations – WNDSR1

15

OAK Arrivals through “Montclair” Gate: April 1 – September 30, 2015

Flight Track Evaluations – RAIDR/WNDSR Gate Penetration Distribution

16

OAK Arrivals through “Montclair” Gate

NextGen Aircraft Procedures Boston Logan International Airport RNAV Study

Alternative Approach for Recommending Changes to Procedures

17

BOS RWY 33L Departures Density Plots: 2010 vs. 2015

18

Pre-RNAV Post-RNAV

BOS RWY 22R and 22L Departure Concepts

Reduced Separation with RWY 27 Arrival Flow

Early turn after take-off to reduce noise over community

19

BOS RWY 4R Arrivals Density Plots 2010 vs. 2015

20

Pre-RNAV Post-RNAV

BOS RWY 4R Arrivals Noise Mitigation Concepts

Standard steep approaches

2-segment steep approaches

Late turn to final approach

Overflight of areas with high ambient noise (i.e. expressway approach

Add photo here to fill width of this box

21

Thank you

22

top related