FACTS ABOUT THE ALBUQUERQUE RAPID TRANSIT (ART) PROJECT

ART is a complex project that will cover almost nine miles of Central Avenue. Through 18 public

meetings and more than 6,600 contacts with individual stakeholders, the ART team has been receiving

input that has shaped the overall design. ART improvements include wider sidewalks wherever

feasible, a net increase in the number of trees, preservation of on-street parking, improved accessibility

and new pedestrian crossings.The overall result will be a safer, more walkable and rejuvenated Central

Avenue.

The figures below show how the ART fits into Central Avenue with and without a station. Travel lanes

and sidewalk widths will vary along the corridor.

Figure 1. Section @ Tulane

Figure 2. Section @ Washington

E X I S T I N G

E X I S T I N G

P R O P O S E D

P R O P O S E D

D I S C L A I M E R :Figures and numbers are based upon current design. Construction conditions may alter final numbers

Figure 3. On-street marked parking

Louisiana

San Mateo Blvd

Washington St

Carlisle Blvd

Girard Blvd

Yale Blvd

Broa

dway

Blv

d

6th

St

12th

St

INTE

RSTA

TE 2

5STATE 40

Atrisco Dr

Yucca Dr

Old

Coor

s Dr

Coor

s Bl

vd

University Blvd

o Grande

UTCIndian Sc

Lomas Blvd

Segment 1 Segment 2 Segment 3 Segment 4 Segment 5

P +7P +11 No changeNo change No change

P

Figure 4. Number of added trees

Figure 5. Bike Lanes (Existing and new)

Figure 6. Traffic signals added (A total of six traffic signals, and six ped. signals added)

Louisiana

San Mateo Blvd

Washington St

Carlisle Blvd

Girard Blvd

Yale Blvd

Broa

dway

Blv

d

6th

St

12th

St

INTE

RSTA

TE 2

5STATE 40

Atrisco Dr

Yucca Dr

Old

Coor

s Dr

Coor

s Bl

vd

University Blvd

o Grande

UTCIn

Lomas Blvd

Segment 1 Segment 2 Segment 3 Segment 4 Segment 5

+27 +19 No Change No Change+16

Louisiana

San Mateo Blvd

Washington St

Carlisle Blvd

Girard Blvd

Yale Blvd

Broa

dway

Blv

d

6th

St

12th

St

INTE

RSTA

TE 2

5STATE 40

Atrisco Dr

Yucca Dr

Old

Coor

s Dr

Coor

s Bl

vd

University Blvd

o Grande

UTCIn

Lomas Blvd

Segment 1 Segment 2 Segment 3 Segment 4 Segment 5

Bike Lane Added

Bike Lane Maintained

Bike LaneExtended

Existing Bike Lane

Proposed Bike Lane

No Bike Lane Existing Or Proposed

Louisiana

San Mateo Blvd

Washington St

Carlisle Blvd

Girard Blvd

Yale Blvd

Broa

dway

Blv

d

6th

St

12th

St

INTE

RSTA

TE 2

5STATE 40

Atrisco Dr

Yucca Dr

Old

Coor

s Dr

Coor

s Bl

vd

University Blvd

o Grande

UTCIn

Lomas Blvd

Segment 1 Segment 2 Segment 3 Segment 4 Segment 5

63Rd, 59Th, 52Nd,

Atrisco PlazaHigh St Princeton

Signal Added

Midblock Pedestrian Signal Added

D I S C L A I M E R :Figures and numbers are based upon current design. Construction conditions may alter final numbers

top related