Fact Sheet Permitted Mill Seat Landfill Soil Borrow Area › File › DES › Landfill Expansion... · soil borrow areas. Reclamation. Following completion of the borrow areas, the

Post on 28-Jun-2020

2 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

Transcript

7/24/2013

For additional information contact: Russell Rutkowski, Monroe County 753-7515, or Jeffrey Richardson, Waste Management 494-3000.

Monroe County, as the owner and permittee of the Mill Seat Landfill, received permit approval on July 19, 2011 for twosoil borrow areas in the Town of Riga to satisfy the operational needs of the current permitted landfill. Thisinformational sheet provides brief overview of the existing site and the ongoing construction and operation of the soilborrow areas.

Mill Seat Landfill Facts.Mill Seat Landfill has been community partner forover 20 years. In 2002, Waste Management of NewYork, LLC (WMNY) assumed operation of the MillSeat Landfill through life-use lease with MonroeCounty. The current permitted landfill can be definedas:

977 acres Total Property owned by MonroeCounty and WMNY.

98.6 acres Permitted Landfill Footprint. 1,945 tons per day or 776,000 tons per year

Permitted Design Capacity. The current permitted landfill is set to expire in

2018.

Soil Needs.In 2008, following an analysis of the on-site soilneeds to construct and operate the presentlypermitted footprint area, it was determined thatthere were inadequate on-site soils from existingborrow areas to support the Mill Seat Landfillthrough the remaining life of the landfill (2018).Consequently, the County pursued NYCRR Part360, Solid Waste Management Facility (SWMF)Permit modification from the New York StateDepartment of Environmental Conservation(NYSDEC) to construct and operate two soil borrowareas, approximately 20 acres and 42 acres in size,which would provide sufficient soil for operations ofthe permitted landfill including final cover andclosure of the permitted landfill.

Community Input.The Soil Borrow Project was reviewed pursuant tothe New York State Environmental Quality ReviewAct (SEQRA) process, which included an importantpublic participation component. Severalopportunities for public participation were availableduring the Soil Borrow Project’s SEQR process, suchas:

public scoping meeting was held on December2, 2009, which allowed individuals to commenton issues they felt should be identified andaddressed in the Draft SupplementalEnvironmental Impact Statement (DSEIS).

SEQR public hearing was held on February 24,2011, in addition to 30-day public commentperiod, to receive comments on the completedDSEIS.

Permits and Approvals.Following the required permitting review process, theSoil Borrow Project received NYSDEC SWMF PermitModification; NYSDEC General Permit for StormwaterDischarge; and approval from Monroe County for thedemapping (i.e., closure) of portion of Brew Road.

Current Construction Status.Construction of the West Soil Borrow Area began inlate 2011. The most recent construction occurring aspart of the East Soil Borrow Area in the spring of2013 includes stormwater management pond andthe closure of portion of Brew Road.

site plan on the backside of this fact sheet providesthe layout ofthe permittedsoil borrowareas.

Reclamation. Followingcompletion ofthe borrowareas, the landwill be

reclaimed with two permanent ponds and uplandmeadows. Re-vegetation will restore the shores ofthe basins to natural state. typical reclaimed soilborrow area is shown in the photo provided.

Fact SheetPermitted Mill Seat Landfill Soil Borrow Area

NO

T8S

I.B

ase

map

imao

epr

oNde

dby

Aer

s-M

ebic

from

ieñal

phot

ogra

phy

0End

Juy

2,20

08.

2.Pr

oper

tyIr

onw

ere

piss

ided

byO

dder

Ass

ocia

tes

from

0ro

ing

fre

X07

3863

09A

-Pro

pnrt

yLi

near

idby

Pas

sers

Ass

ocia

tes

P551

Odw

irg

file

2007

6510

3b,S

osee

.

3.W

etla

ndbo

rert

larn

san

dbu

ffer

Sar

eba

sed

onB

aron

&L

ogud

itla.

PC

.W

etla

ndD

efin

eStio

nM

opda

ted

Aug

ust

12.

2009

.

MIL

LS

EA

TFA

CIL

ITY

PR

OJE

CT

LO

CA

TIO

NM

gflfl

PR

OP

OS

ED

SOIL

BO

RR

OW

AR

EA

PLA

N

MO

NR

OE

CO

UN

TY

FS

EIS

NE

WY

OR

KD

WG

.N

O08

015-

029d

FIG

UR

E1-

2

LE

GE

ND

-En

JS11

NG

LAN

DFI

LLLI

MTr

S

PRO

POSE

DB

OR

RO

WA

RE

ALI

MIT

S

MO

NR

OE

CO

VN

TY

PR

QP

IYLI

NE

(SE

EN

OT

E2)

—.

—W

AST

EM

AN

AG

EM

EN

TPR

OPE

RT

YU

NE

(SE

EN

OT

E2)

DE

LIN

EA

TE

DW

ET

LA

ND

LIM

ITS

(SE

EN

OT

ES)

800

0ci

o1?

ioA

PPR

OX

IMA

TE

SCA

LE

:r

=80

0

lam
Stamp

top related