PHILIPPINE RED CROSS IN PARTNERSHIP WITH BRITISH RED CROSSILOILO CHAPTER

WATER AND SANITATION IN SCHOOL PROJECTPROGRAM OF WORKS

REGION NAME OF SCHOOL

6 LANJAGAN PRIMARY SCHOOL

BUDGET ALLOCATION:DIRECT COST

NO DESCRIPTION1 Expenses

1A Insurances

1B Bonds and Guarantees

2 Mobilization

2A General Project Mobilisation/Demob, Safety & Health

3 Construction of Toilet Detached & Hand washing facilities

3A Earthworks

3B Concrete Works

3C Steel Works

3D Formworks

3E Masonry Works

3F Doors and Windows

3G Roofing Works

3H Carpentry Works

3I Electrical Works

3J Plumbing Works

3K Sanitary Works

3L Painting Works

3M Tile Works

3N Hardwares

4 Construction of Septic Vault

4A Earthworks

4B Concrete Works

4C Steel Works

4D Formworks

4E Masonry Works

5 Provision/Rehabilitation of pipe connections

5A Installation of 3/4" PVC Pipe and water network

6 Water Source, water tank and electric pump

6A Provision of water tank, stand and electric pump

Direct Cost: SUBTOTALIndirect Cost (19% of total direct cost): SUBTOTALTax (12%)

ESTIMATED TOTAL COST (PHP)

Prepared by:Ardhe D. Sicad Wash TPA

PHILIPPINE RED CROSS IN PARTNERSHIP WITH BRITISH RED CROSSILOILO CHAPTER

WATER AND SANITATION IN SCHOOL PROJECTPROGRAM OF WORKS

PROJECT TITLE

CONSTRUCTION OF 3-SEATER TOILET DETACHED WITH HANDWASHING FACILITIES

APPROVED BUDGET FOR CONTRACT:DIRECT COST

UNIT QTY

location 1

location 1

location 1

each 1

each 1

each 1

each 1

each 1

each 1

each 1

each 1

each 1

each 1

each 1

each 1

each 1

each 1

each 1

each 1

each 1

each 1

each 1

each 1

each 1

Direct Cost: SUBTOTALIndirect Cost (19% of total direct cost): SUBTOTALTax (12%)

ESTIMATED TOTAL COST (PHP)

Noted by:

PHILIPPINE RED CROSS IN PARTNERSHIP WITH BRITISH RED CROSSILOILO CHAPTER

WATER AND SANITATION IN SCHOOL PROJECTPROGRAM OF WORKS

PROJECT TITLE

CONSTRUCTION OF 3-SEATER TOILET DETACHED WITH HANDWASHING FACILITIES

COMPLETION PERIOD: 2 MONTHSDIRECT COST

TOTAL COST

- -

TAX EXEMPT -

Daphnie S. Dela CruzField Operations Head

PHILIPPINE RED CROSS IN PARTNERSHIP WITH BRITISH RED CROSSILOILO CHAPTER

WATER AND SANITATION IN SCHOOL PROJECTPROGRAM OF WORKS

REGION NAME OF SCHOOL

6 TAGUBANHAN ELEMENTARY SCHOOL

BUDGET ALLOCATION:DIRECT COST

NO DESCRIPTION1 Expenses

1A Insurances

1B Bonds and Guarantees

2 Mobilization

2A General Project Mobilisation/Demob, Safety & Health

3 Construction of Toilet Detached & Hand washing facilities

3A Earthworks

3B Concrete Works

3C Steel Works

3D Formworks

3E Masonry Works

3F Doors and Windows

3G Roofing Works

3H Carpentry Works

3I Electrical Works

3J Plumbing Works

3K Sanitary Works

3L Painting Works

3M Tile Works

3N Hardwares

4 Construction of Septic Vault

4A Earthworks

4B Concrete Works

4C Steel Works

4D Formworks

4E Masonry Works

5 Provision/Rehabilitation of pipe connections

5A Installation of 3/4" PVC Pipe and water network

6 Water Source, water tank and electric pump

6A Provision of water tank, stand and electric pump

Direct Cost: SUBTOTALIndirect Cost (19% of total direct cost): SUBTOTALTax (12%)

ESTIMATED TOTAL COST (PHP)

Prepared by:Ardhe D. Sicad Wash TPA

PHILIPPINE RED CROSS IN PARTNERSHIP WITH BRITISH RED CROSSILOILO CHAPTER

WATER AND SANITATION IN SCHOOL PROJECTPROGRAM OF WORKS

PROJECT TITLE

CONSTRUCTION OF 3-SEATER TOILET DETACHED WITH HANDWASHING FACILITIES

APPROVED BUDGET FOR CONTRACT:DIRECT COST

UNIT QTY

location 1

location 1

location 1

each 1

each 1

each 1

each 1

each 1

each 1

each 1

each 1

each 1

each 1

each 1

each 1

each 1

each 1

each 1

each 1

each 1

each 1

each 1

each 1

each 1

Direct Cost: SUBTOTALIndirect Cost (19% of total direct cost): SUBTOTALTax (12%)

ESTIMATED TOTAL COST (PHP)

Noted by:

PHILIPPINE RED CROSS IN PARTNERSHIP WITH BRITISH RED CROSSILOILO CHAPTER

WATER AND SANITATION IN SCHOOL PROJECTPROGRAM OF WORKS

PROJECT TITLE

CONSTRUCTION OF 3-SEATER TOILET DETACHED WITH HANDWASHING FACILITIES

COMPLETION PERIOD: 2 MONTHSDIRECT COST

TOTAL COST

- -

TAX EXEMPT -

Daphnie S. Dela CruzField Operations Head

PHILIPPINE RED CROSS IN PARTNERSHIP WITH BRITISH RED CROSSILOILO CHAPTER

WATER AND SANITATION IN SCHOOL PROJECTPROGRAM OF WORKS

REGION NAME OF SCHOOL

6 PINAY ESPINOSA ELEMENTARY SCHOOL

BUDGET ALLOCATION:DIRECT COST

NO DESCRIPTION1 Expenses

1A Insurances

1B Bonds and Guarantees

2 Mobilization

2A General Project Mobilisation/Demob, Safety & Health

3 Construction of Toilet Detached & Hand washing facilities

3A Earthworks

3B Concrete Works

3C Steel Works

3D Formworks

3E Masonry Works

3F Doors and Windows

3G Roofing Works

3H Carpentry Works

3I Electrical Works

3J Plumbing Works

3K Sanitary Works

3L Painting Works

3M Tile Works

3N Hardwares

4 Construction of Septic Vault

4A Earthworks

4B Concrete Works

4C Steel Works

4D Formworks

4E Masonry Works

5 Provision/Rehabilitation of pipe connections

5A Installation of 3/4" PVC Pipe and water network

6 Water Source, water tank and electric pump

6A Provision of water tank, stand and electric pump

Direct Cost: SUBTOTALIndirect Cost (19% of total direct cost): SUBTOTALTax (12%)

ESTIMATED TOTAL COST (PHP)

Prepared by:Ardhe D. Sicad Wash TPA

PHILIPPINE RED CROSS IN PARTNERSHIP WITH BRITISH RED CROSSILOILO CHAPTER

WATER AND SANITATION IN SCHOOL PROJECTPROGRAM OF WORKS

PROJECT TITLE

CONSTRUCTION OF 4-SEATER TOILET DETACHED WITH HANDWASHING FACILITIES

APPROVED BUDGET FOR CONTRACT:DIRECT COST

UNIT QTY

location 1

location 1

location 1

each 1

each 1

each 1

each 1

each 1

each 1

each 1

each 1

each 1

each 1

each 1

each 1

each 1

each 1

each 1

each 1

each 1

each 1

each 1

each 1

each 1

Direct Cost: SUBTOTALIndirect Cost (19% of total direct cost): SUBTOTALTax (12%)

ESTIMATED TOTAL COST (PHP)

Noted by:

PHILIPPINE RED CROSS IN PARTNERSHIP WITH BRITISH RED CROSSILOILO CHAPTER

WATER AND SANITATION IN SCHOOL PROJECTPROGRAM OF WORKS

PROJECT TITLE

CONSTRUCTION OF 4-SEATER TOILET DETACHED WITH HANDWASHING FACILITIES

COMPLETION PERIOD: 2 MONTHSDIRECT COST

TOTAL COST

- -

TAX EXEMPT -

Daphnie S. Dela CruzField Operations Head

PHILIPPINE RED CROSS IN PARTNERSHIP WITH BRITISH RED CROSSILOILO CHAPTER

WATER AND SANITATION IN SCHOOL PROJECTPROGRAM OF WORKS

REGION NAME OF SCHOOL

6 PINAY ESPINOSA ELEMENTARY SCHOOL

BUDGET ALLOCATION: DIRECT COST

NO DESCRIPTION1 Expenses

1A Insurances

1B Bonds and Guarantees

2 Mobilization

2A General Project Mobilisation/Demob, Safety & Health

3 Rehabiltation of Concrete Tank and WASH Facilities

3A Earthworks

3B Concrete Works

3C Steel Works

3D Formworks

3E Masonry Works

3F Doors and Windows

3G Roofing Works

3H Carpentry Works

3I Electrical Works

3J Plumbing Works

3K Sanitary Works

3L Painting Works

3M Tile Works

3N Hardwares

Direct Cost: SUBTOTALIndirect Cost (19% of total direct cost): SUBTOTALTax (12%)

ESTIMATED TOTAL COST (PHP)

Prepared by:Ardhe D. Sicad Wash TPA

PHILIPPINE RED CROSS IN PARTNERSHIP WITH BRITISH RED CROSSILOILO CHAPTER

WATER AND SANITATION IN SCHOOL PROJECTPROGRAM OF WORKS

PROJECT TITLE

REHABILITATION OF SCHOOL WASH FACILITIES

APPROVED BUDGET FOR CONTRACT:DIRECT COST

UNIT QTY

location 1

location 1

location 1

each 1

each 1

each 1

each 1

each 1

each 1

each 1

each 1

each 1

each 1

each 1

each 1

each 1

each 1

Direct Cost: SUBTOTALIndirect Cost (19% of total direct cost): SUBTOTALTax (12%)

ESTIMATED TOTAL COST (PHP)

Noted by:

PHILIPPINE RED CROSS IN PARTNERSHIP WITH BRITISH RED CROSSILOILO CHAPTER

WATER AND SANITATION IN SCHOOL PROJECTPROGRAM OF WORKS

PROJECT TITLE

REHABILITATION OF SCHOOL WASH FACILITIES

COMPLETION PERIOD: 2 MONTHSDIRECT COST

TOTAL COST

- -

TAX EXEMPT -

Daphnie S. Dela CruzField Operations Head

PHILIPPINE RED CROSS IN PARTNERSHIP WITH BRITISH RED CROSSILOILO CHAPTER

WATER AND SANITATION IN SCHOOL PROJECTPROGRAM OF WORKS

REGION NAME OF HEALTH UNIT

6 AJUY RURAL HEALTH UNIT

BUDGET ALLOCATION: DIRECT COST

NO DESCRIPTION1 Expenses

1A Insurances

1B Bonds and Guarantees

2 Mobilization

2A General Project Mobilisation/Demob, Safety & Health

3

3A Earthworks

3B Concrete Works

3C Steel Works

3D Formworks

3E Masonry Works

3F Carpentry Works

3G Plumbing Works

3H Sanitary Works

3I Painting Works

3J Tile Works

3K Hardwares

4 Provision/Rehabilitation of pipe connections

5A Installation of 3/4" PVC Pipe and water network

4 Water Source, water tank and electric pump

5A Provision of water tank, stand and electric pump

Direct Cost: SUBTOTALIndirect Cost (19% of total direct cost): SUBTOTALTax (12%)

ESTIMATED TOTAL COST (PHP)

Prepared by:Ardhe D. Sicad Wash TPA

Construction of Placenta Pit with Sharps and Rehabilitation of WASH Faciliies

PHILIPPINE RED CROSS IN PARTNERSHIP WITH BRITISH RED CROSSILOILO CHAPTER

WATER AND SANITATION IN SCHOOL PROJECTPROGRAM OF WORKS

PROJECT TITLE

CONSTRUCTION OF PLACENTA PIT WITH SHARPS AND REHABILITATION OF WASH FACILITIES

APPROVED BUDGET FOR CONTRACT:DIRECT COST

UNIT QTY

location 1

location 1

location 1

each 1

each 1

each 1

each 1

each 1

each 1

each 1

each 1

each 1

each 1

each 1

each 1

each 1

Direct Cost: SUBTOTALIndirect Cost (19% of total direct cost): SUBTOTALTax (12%)

ESTIMATED TOTAL COST (PHP)

Noted by:

PHILIPPINE RED CROSS IN PARTNERSHIP WITH BRITISH RED CROSSILOILO CHAPTER

WATER AND SANITATION IN SCHOOL PROJECTPROGRAM OF WORKS

PROJECT TITLE

CONSTRUCTION OF PLACENTA PIT WITH SHARPS AND REHABILITATION OF WASH FACILITIES

COMPLETION PERIOD: 2 MONTHSDIRECT COST

TOTAL COST

- -

TAX EXEMPT -

Daphnie S. Dela CruzField Operations Head

PHILIPPINE RED CROSS IN PARTNERSHIP WITH BRITISH RED CROSSILOILO CHAPTER

WATER AND SANITATION IN SCHOOL PROJECTPROGRAM OF WORKS

REGION NAME OF HEALTH UNIT

6 BAY-ANG BARANGAY HEALTH CENTER

BUDGET ALLOCATION: DIRECT COST

NO DESCRIPTION1 Expenses

1A Insurances

1B Bonds and Guarantees

2 Mobilization

2A General Project Mobilisation/Demob, Safety & Health

3

3A Earthworks

3B Concrete Works

3C Steel Works

3D Formworks

3E Masonry Works

3F Carpentry Works

3G Plumbing Works

3H Sanitary Works

3I Painting Works

3J Tile Works

3K Hardwares

4 Provision/Rehabilitation of pipe connections

4A Installation of 3/4" PVC Pipe and water network

Direct Cost: SUBTOTALIndirect Cost (19% of total direct cost): SUBTOTALTax (12%)

ESTIMATED TOTAL COST (PHP)

Prepared by:Ardhe D. Sicad Wash TPA

Construction of Placenta Pit with Sharps and Rehabilitation of WASH Faciliies

PHILIPPINE RED CROSS IN PARTNERSHIP WITH BRITISH RED CROSSILOILO CHAPTER

WATER AND SANITATION IN SCHOOL PROJECTPROGRAM OF WORKS

PROJECT TITLE

CONSTRUCTION OF PLACENTA PIT WITH SHARPS AND REHABILITATION OF WASH FACILITIES

APPROVED BUDGET FOR CONTRACT:DIRECT COST

UNIT QTY

location 1

location 1

location 1

each 1

each 1

each 1

each 1

each 1

each 1

each 1

each 1

each 1

each 1

each 1

each 1

Direct Cost: SUBTOTALIndirect Cost (19% of total direct cost): SUBTOTALTax (12%)

ESTIMATED TOTAL COST (PHP)

Noted by:

PHILIPPINE RED CROSS IN PARTNERSHIP WITH BRITISH RED CROSSILOILO CHAPTER

WATER AND SANITATION IN SCHOOL PROJECTPROGRAM OF WORKS

PROJECT TITLE

CONSTRUCTION OF PLACENTA PIT WITH SHARPS AND REHABILITATION OF WASH FACILITIES

COMPLETION PERIOD: 2 MONTHSDIRECT COST

TOTAL COST

- -

TAX EXEMPT -

Daphnie S. Dela CruzField Operations Head

PHILIPPINE RED CROSS IN PARTNERSHIP WITH BRITISH RED CROSSILOILO CHAPTER

WATER AND SANITATION IN SCHOOL PROJECTPROGRAM OF WORKS

REGION NAME OF HEALTH UNIT

6 LANJAGAN BARANGAY HEALTH CENTER

BUDGET ALLOCATION: DIRECT COST

NO DESCRIPTION1 Expenses

1A Insurances

1B Bonds and Guarantees

2 Mobilization

2A General Project Mobilisation/Demob, Safety & Health

3

3A Earthworks

3B Concrete Works

3C Steel Works

3D Formworks

3E Masonry Works

3F Carpentry Works

3G Plumbing Works

3H Sanitary Works

3I Painting Works

3J Tile Works

3K Hardwares

4 Provision/Rehabilitation of pipe connections

4A Installation of 3/4" PVC Pipe and water network

5 Water Source, water tank and electric pump

5A Provision of water tank, stand and electric pump

Direct Cost: SUBTOTALIndirect Cost (19% of total direct cost): SUBTOTALTax (12%)

ESTIMATED TOTAL COST (PHP)

Prepared by:Ardhe D. Sicad Wash TPA

Construction of Placenta Pit with Sharps and Rehabilitation of WASH Faciliies

PHILIPPINE RED CROSS IN PARTNERSHIP WITH BRITISH RED CROSSILOILO CHAPTER

WATER AND SANITATION IN SCHOOL PROJECTPROGRAM OF WORKS

PROJECT TITLE

CONSTRUCTION OF PLACENTA PIT WITH SHARPS AND REHABILITATION OF WASH FACILITIES

APPROVED BUDGET FOR CONTRACT:DIRECT COST

UNIT QTY

location 1

location 1

location 1

each 1

each 1

each 1

each 1

each 1

each 1

each 1

each 1

each 1

each 1

each 1

each 1

each 1

Direct Cost: SUBTOTALIndirect Cost (19% of total direct cost): SUBTOTALTax (12%)

ESTIMATED TOTAL COST (PHP)

Noted by:

PHILIPPINE RED CROSS IN PARTNERSHIP WITH BRITISH RED CROSSILOILO CHAPTER

WATER AND SANITATION IN SCHOOL PROJECTPROGRAM OF WORKS

PROJECT TITLE

CONSTRUCTION OF PLACENTA PIT WITH SHARPS AND REHABILITATION OF WASH FACILITIES

COMPLETION PERIOD: 2 MONTHSDIRECT COST

TOTAL COST

- -

TAX EXEMPT -

Daphnie S. Dela CruzField Operations Head