Top Banner
SURVEY HARGA MATERIAL MATERIAL NON LOKAL No U r a i a n Sat. Harga Bahan / Quary Tk. Anggrek Tk. Gloria Tk. Nirmala ( Rp. ) ( Rp. ) ( Rp. ) 1 Besi Beton Ø 19 Btg - - - 2 Besi Beton Ø 16 Btg 168,000 170,000 165,000 3 Besi Beton Ø 14 Btg 182,500 180,000 130,000 4 Besi Beton Ø 12 Btg 96,000 95,000 95,000 5 Btg 66,000 66,500 70,000 6 Btg 42,000 40,000 48,000 7 Btg 24,000 22,500 25,000 8 Baja tulangan 9 Portland Cement (PC) Tiga Roda Zak 52,000 51,500 51,000 10 Semen Portland @ 40 kg ( PC ) Kg 1,300 1,288 1,275 11 Kawat Beton Kg 20,000 19,000 19,000 12 Kaca Polos 5 mm M2 150,000 120,000 122,000 13 Seng gelombang hijau Bjls. 0,20 mm (fabrika Lbr 57,000 37,000 36,500 14 Seng plat Bjls 0,30 - 40 cm Lbr 25,000 22,500 24,000 15 Paku biasa 1-3 cm Kg 25,000 15,000 15,000 16 Paku biasa 5-12 cm Kg 19,000 19,000 19,000 17 Paku seng Kg 22,000 17,500 17,000 18 Pipa PVC Ø 2" M1 15,000 12,000 11,500 19 Pipa PVC Ø 4" M1 33,750 35,000 35,500 20 Pipa galvanis medium A Ø 1/2" M1 20,000 20,000 21,500 21 Kran Air Ø 1/2" Bh 25,000 15,000 20,000 22 seal tape Bh 3,000 1,500 2,000 23 Pipa hawa Ø 2" (jadi) Unit 75,000 65,000 50,000 24 Tripleks 6 mm Lbr 94,000 52,500 54,000 25 Tripleks 9 mm Lbr 140,000 108,000 110,000 26 Politur Jadi/Vernis Ltr 58,000 45,000 42,500 27 Amplas Lbr 5,000 3,000 2,500 28 Teakwood 3 mm Lbr 70,000 75,000 78,500 29 Tripleks aluminium uk. Pintu 3mm Lbr 100,000 95,000 98,000 30 Cat tembok / Cat penutup Kg 25,000 15,000 14,500 31 Plamur tembok Kg 35,000 10,500 10,000 32 Cat Kilat / Cat penutup Kg 53,000 37,000 38,000 33 Cat Menie seng / Meni besi Kg 35,000 22,000 22,000 34 Cat Menie Kayu Kg 55,000 22,000 22,000 35 Cat dasar Kg 55,000 22,000 22,000 36 Lem kayu Ltr 20,000 28,500 27,000 37 Kuas Cat Bh 10,000 7,500 8,000 38 Minyak cat Kg 55,000 22,500 25,000 39 Kawat Harmonika uk. Lubang 5 cm M2 38,000 22,500 25,000 40 Besi beton / baja tulangan Kg 10,000 - - 41 Minyak Bekisting / Residu Ltr 5,000 5,000 - 42 Engsel Jendela angin Bh 35,000 43 Engsel Pintu Kualitas baik Bh 20,000 12,500 13,500 Besi Beton Ø 10 Besi Beton Ø 8 Besi Beton Ø 6
291

Boq Kosong

Jul 10, 2016

Download

Documents

Mercy Woda
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Boq Kosong

SURVEY HARGA MATERIAL

MATERIAL NON LOKAL

No U r a i a n Sat. Harga Bahan / Quary

Tk. Anggrek Tk. Gloria Tk. Nirmala ( Rp. ) ( Rp. ) ( Rp. )

1 Besi Beton Ø 19 Btg - - - 2 Besi Beton Ø 16 Btg 168,000 170,000 165,000 3 Besi Beton Ø 14 Btg 182,500 180,000 130,000 4 Besi Beton Ø 12 Btg 96,000 95,000 95,000 5 Btg 66,000 66,500 70,000 6 Btg 42,000 40,000 48,000 7 Btg 24,000 22,500 25,000 8 Baja tulangan9 Portland Cement (PC) Tiga Roda Zak 52,000 51,500 51,000

10 Semen Portland @ 40 kg ( PC ) Kg 1,300 1,288 1,275 11 Kawat Beton Kg 20,000 19,000 19,000 12 Kaca Polos 5 mm M2 150,000 120,000 122,000 13 Seng gelombang hijau Bjls. 0,20 mm (fabrikas Lbr 57,000 37,000 36,500 14 Seng plat Bjls 0,30 - 40 cm Lbr 25,000 22,500 24,000 15 Paku biasa 1-3 cm Kg 25,000 15,000 15,000 16 Paku biasa 5-12 cm Kg 19,000 19,000 19,000 17 Paku seng Kg 22,000 17,500 17,000 18 Pipa PVC Ø 2" M1 15,000 12,000 11,500 19 Pipa PVC Ø 4" M1 33,750 35,000 35,500 20 Pipa galvanis medium A Ø 1/2" M1 20,000 20,000 21,500 21 Kran Air Ø 1/2" Bh 25,000 15,000 20,000 22 seal tape Bh 3,000 1,500 2,000 23 Pipa hawa Ø 2" (jadi) Unit 75,000 65,000 50,000 24 Tripleks 6 mm Lbr 94,000 52,500 54,000 25 Tripleks 9 mm Lbr 140,000 108,000 110,000 26 Politur Jadi/Vernis Ltr 58,000 45,000 42,500 27 Amplas Lbr 5,000 3,000 2,500 28 Teakwood 3 mm Lbr 70,000 75,000 78,500 29 Tripleks aluminium uk. Pintu 3mm Lbr 100,000 95,000 98,000 30 Cat tembok / Cat penutup Kg 25,000 15,000 14,500 31 Plamur tembok Kg 35,000 10,500 10,000 32 Cat Kilat / Cat penutup Kg 53,000 37,000 38,000 33 Cat Menie seng / Meni besi Kg 35,000 22,000 22,000 34 Cat Menie Kayu Kg 55,000 22,000 22,000 35 Cat dasar Kg 55,000 22,000 22,000 36 Lem kayu Ltr 20,000 28,500 27,000 37 Kuas Cat Bh 10,000 7,500 8,000 38 Minyak cat Kg 55,000 22,500 25,000 39 Kawat Harmonika uk. Lubang 5 cm M2 38,000 22,500 25,000 40 Besi beton / baja tulangan Kg 10,000 - - 41 Minyak Bekisting / Residu Ltr 5,000 5,000 - 42 Engsel Jendela angin Bh 35,000 43 Engsel Pintu Kualitas baik Bh 20,000 12,500 13,500

Besi Beton Ø 10Besi Beton Ø 8Besi Beton Ø 6

Page 2: Boq Kosong

44 Grendel Jendela Bh 20,000 7,500 7,500 45 Plamur kayu / dempul jadi Kg 25,000 21,000 20,000 46 Kunci Tanam Pintu Uk. Besar 2 x Putar (baik) bh 175,000 90,000 100,000 47 Kait angin Bh 5,000 2,500 3,000 48 Grendel Pintu Panjang Bh 12,000 10,000 12,000 49 Kloset Duduk INA Bh 2,500,000 117,500 115,000 50 Flour drain (Stainlees Steel) Bh 40,000 8,000 9,000

No U r a i a n Sat. Harga Bahan / Quary

Tk. Anggrek Tk. Gloria Tk. Nirmala ( Rp. ) ( Rp. ) ( Rp. )

51 Besi Beugel/Mourbaut /besi streep (pengikat Kg 25,000 15,000 15,000 52 Pipa Penguras PVC Ø 3/4" (biru) Bh 12,000 10,000 12,000 53 Instalasi Listrik ( Meteran Baru ) Daya 2200 Unit 3,262,000 Harga dari PLN 54 Titik Lampu + Instalasi Listrik dalam bangun Titik 224,000 - - 55 Lampu pijar 40 Watt Bh 6,000 4,000 3,500 56 Lampu SL Philips 18 Watt Bh 37,500 37,000 35,000 57 Lampu TL 40 Watt (complit) Bh 110,000 82,500 80,000 58 Saklar Tunggal Bh 17,500 17,000 17,000 59 Saklar Ganda Bh 22,500 20,000 22,000 60 Stop Kontak Bh 17,500 17,000 17,000 61 Sekring MCB 2 Group Bh 72,500 75,000 75,000

MATERIAL BATU

No U r a i a n Satuan Lokasi Bahan / Quary

Tanjung Ia Lokoboko Roworeke ( Rp. ) ( Rp. ) ( Rp. )

1 Pasir Pasang (PP) / Pasir Beton (PB) M3 66,667 66,667 70,000 2 Batu Pecah 2 - 3 cm M3 200,000 200,000 150,000 3 Batu Kali/belah/gunung M3 83,333 83,333 70,000 4 Bata merah Bh - 1,000 1,000 5 Tanah Urug M3 45,000 45,000 35,000

Tk. Gloria Tk.Woloare Tk. Nirmala ( Rp. ) ( Rp. ) ( Rp. )

5 Batu Roster 30/ 30 cm Bh - 11,000 -

MATERIAL KAYU

No U r a i a n Sat. Lokasi Bahan / Quary

Boanawa Bumi Indah Sumber Kasih ( Rp. ) ( Rp. ) ( Rp. )

MATERIAL KAYU1 List kayu profil, lebar 6 cm M1 12,000 11,000 12,500 2 List kaca M3 2,000 6,750 2,000 3 Kayu bayam (balok) 3,250,000 9,500,000 9,000,000 4 Kayu Bayam (Papan) 3,700,000 ### 10,000,000 5 Usuk Kayu Kls II (kaso-kaso 5/7 cm) 3,250,000 3,600,000 3,200,000 6 Papan Bekesting (Kelas III)/Perancah 1,750,000 2,500,000 2,000,000

Page 3: Boq Kosong

7 Kayu Hutan Kelas II ( balok ) Batu M3 3,500,000 3,600,000 3,600,000

Ng. panda Lokoboko Ndona ( Rp. ) ( Rp. ) ( Rp. )

8 Bambu Btg 15,000 20,000 20,000 9 Ijuk Kg 15,000 15,000 12,000

Di BuatKonstruktor

VERLY EDWIN, ST

Ende, Mei 2012

Page 4: Boq Kosong

SURVEY HARGA MATERIAL

Harga Bahan / Quary SK. Bupati

( Rp. ) ( Rp. )

- - 203,000 165,000 184,000 130,000 104,000 95,000 70,000 66,500 47,000 42,000 28,000 24,000 10,000 10,000 57,000 52,000 1,425 1,300 28,000 20,000 173,000 150,000 40,000 57,000 25,000 25,000 20,000 25,000 23,000 19,000 24,000 22,000 24,000 15,000 45,500 33,750 121,000 20,000 45,000 25,000 - 3,000 - 75,000 34,000 94,000 296,000 140,000 50,000 58,000 5,000 5,000 83,000 70,000 - 100,000 22,000 25,000 20,000 35,000 47,000 53,000 29,000 35,000 29,000 55,000 29,000 55,000 32,000 20,000 19,000 10,000 26,000 55,000 26,000 38,000 10,000 10,000 - 5,000 31,000 35,000 31,000 20,000

Harga yang dipakai

Page 5: Boq Kosong

17,000 20,000 52,000 25,000 202,000 175,000 19,000 5,000 17,000 12,000 190,000 2,500,000 35,000 40,000

Harga Bahan / Quary SK. Bupati

( Rp. ) ( Rp. ) 15,000 25,000 - 12,000 - 3,262,000 - 224,000

6,000 37,500 110,000 17,500 22,500 17,500 75,000

Lokasi Bahan / Quary SK. Bupati

( Rp. ) ( Rp. ) sk bupati

42,000 66,667 Tanah Urug Biasa 42,000 87,000 200,000 Pasir Urug 87,000 85,000 83,333 Pasir beton / Pasir Pasang 85,000 1,000 1,000 Batu belah / kali 83,000 55,000 45,000

SK. Bupati Tk. Gloria ( Rp. )

- 11,000 Batu pecah (koral Beton) 2/3 c 170,000

Lokasi Bahan / Quary SK. Bupati

( Rp. ) ( Rp. )

11,000 11,000 Papan Begisting 1,700,000 3,300,000 6,750 6,750 Balok kayu klas II 3,150,000 3,618,000 9,900,000 9,500,000

### 10,500,000 3,685,000 3,600,000 2,750,000 2,500,000

Harga yang dipakai

Harga yang dipakai

Harga yang dipakai

Page 6: Boq Kosong

3,850,000 3,600,000 Papan Kayu Klas II 3,500,000 5,246,000

SK. Bupati ( Rp. )

22,000 20,000 50,000 15,000

Di BuatKonstruktor

VERLY EDWIN, ST

Ende, Mei 2012

Page 7: Boq Kosong

KOP PERUSAHAAN

REKAPITULASI RENCANA ANGGARAN BIAYA ( RAB )

PROGRAM : Peningkatan Sarana dan Prasarana Aparatur

KEGIATAN : Pembangunan Gedung Kantor

PEKERJAAN : Lanjutan Pembangunan Kantor Perpustakaan dan Arsip Daerah

LOKASI : Jl. Diponegoro - Kel. Onekore - Kec. Ende Tengah

TAHUN ANGGARAN : 2015

No U R A I A N

1 2

I PEK. PERSIAPAN

II PEK. PASANGAN & PLESTERAN

III PEK. BETON 1PC : 2PSR : 3KRL

IV PEK. KAYU DAN KACA

V PEK. ATAP DAN PLAFOND

VI PEK. KERAMIK , LANTAI DAN DINDING

VII PEK. PENGECATAN

VIII PEK. PENGGANTUNG DAN PENGUNCI

IX PEK . INSTALASI LISTRIK & SANITASI

X PEK. BESI

XI PEK. PAGAR PENGAMAN

XII PEK. GARASI

Jumlah

PPn 10%

Total

A BIAYA KONSTRUKSI Dibulatkan

TERBILANG :

Ende, 2016

P E N A W A RPT/CV/Fa. ................................

.........................................J a b a t a n

Disetujui Oleh :Kontraktor Pelaksana

CV. KSU PEGAWAI NEGERI

H. DJAE DAHLANKuasa Direktur

Diperiksa Oleh :Staf Teknik

Dinas Kimpraswil Kab. Ende

ANTONIUS MANINip : 620 020 639

Disetujui Oleh :Kontraktor Pelaksana

CV. KSU PEGAWAI NEGERI

H. DJAE DAHLANKuasa Direktur

Diperiksa Oleh :Staf Teknik

Dinas Kimpraswil Kab. Ende

ANTONIUS MANINip : 620 020 639

Disetujui Oleh :Kontraktor Pelaksana

CV. KSU PEGAWAI NEGERI

H. DJAE DAHLANKuasa Direktur

Diperiksa Oleh :Staf Teknik

Dinas Kimpraswil Kab. Ende

ANTONIUS MANINip : 620 020 639

Disetujui Oleh :Kontraktor Pelaksana

CV. KSU PEGAWAI NEGERI

H. DJAE DAHLANKuasa Direktur

Diperiksa Oleh :Staf Teknik

Dinas Kimpraswil Kab. Ende

ANTONIUS MANINip : 620 020 639

CV. KONINDOEngineering & Management ConsultantPerwakilan EndeJl. Radio No. 2 - Kota Raja, Ende - 86311Telp. (0381) 22642

Page 8: Boq Kosong

KOP PERUSAHAAN

REKAPITULASI RENCANA ANGGARAN BIAYA ( RAB )

Peningkatan Sarana dan Prasarana Aparatur

Lanjutan Pembangunan Kantor Perpustakaan dan Arsip Daerah

Jl. Diponegoro - Kel. Onekore - Kec. Ende Tengah

JUMLAH

Ende, 2016

P E N A W A RPT/CV/Fa. ................................

.........................................J a b a t a n

Dibuat Oleh :Konsultan Pengawas

CV. PRIMA MULTI CIPTA

SONNY DA COSTAPengawas

Mengetahui Pengendali KegiatanKasubdin Produksi

Peternakan

Ir. F. P. SAMALATYNip : 620 021 001

Dibuat Oleh :Konsultan Pengawas

CV. PRIMA MULTI CIPTA

SONNY DA COSTAPengawas

Mengetahui Pengendali KegiatanKasubdin Produksi

Peternakan

Ir. F. P. SAMALATYNip : 620 021 001

Dibuat Oleh :Konsultan Pengawas

CV. PRIMA MULTI CIPTA

SONNY DA COSTAPengawas

Mengetahui Pengendali KegiatanKasubdin Produksi

Peternakan

Ir. F. P. SAMALATYNip : 620 021 001

Dibuat Oleh :Konsultan Pengawas

CV. PRIMA MULTI CIPTA

SONNY DA COSTAPengawas

Mengetahui Pengendali KegiatanKasubdin Produksi

Peternakan

Ir. F. P. SAMALATYNip : 620 021 001

Page 9: Boq Kosong

REKAPITULASI RENCANA ANGGARAN BIAYA ( RAB )

PROGRAM : Peningkatan Sarana dan Prasarana AparaturKEGIATAN : Pembangunan Gedung KantorPEKERJAAN : Lanjutan Pembangunan Kantor Perpustakaan dan Arsip Daerah LOKASI : Jl. Diponegoro - Kel. Onekore - Kec. Ende TengahTAHUN ANGGARAN : 2015

No U R A I A N JUMLAH

A PEKERJAAN KONSTRUKSI

I PEK. PERSIAPAN Rp.

II PEK. PASANGAN & PLESTERAN Rp.

III PEK. BETON 1PC : 2PSR : 3KRL Rp.

IV PEK. KAYU DAN KACA Rp.

V PEK. ATAP DAN PLAFOND Rp.

VI PEK. KERAMIK , LANTAI DAN DINDING Rp.

VII PEK. PENGECATAN Rp.

VIII PEK. PENGGANTUNG DAN PENGUNCI Rp.

IX PEK . INSTALASI LISTRIK & SANITASI Rp.

X PEK. BESI Rp.

XI PEK. PAGAR PENGAMAN Rp.

XII PEK. GARASI Rp.

Real Cost Rp.

PPn 10% Rp.

Jumlah Rp.

A BIAYA KONSTRUKSI Dibulatkan Rp.B BIAYA PERENCANAAN TEKNIK

( 5,00 % X JUMLAH BIAYA PEK. KONSTRUKSI ) Rp.C BIAYA PENGAWASAN TEKNIK

(3,00 % X JUMLAH BIAYA PEK. KONSTRUKSI ) Rp. BIAYA PENGELOLAAN KEGIATAN (1,75 % X JUMLAH BIAYA PEK. KONSTRUKSI ) JUMLAH TOTAL ( A + b + C ) Rp. DIBULATKAN Rp.

TERBILANG : RUPIAH

Err:509

Disetujui Oleh :Kontraktor Pelaksana

CV. KSU PEGAWAI NEGERI

H. DJAE DAHLANKuasa Direktur

Diperiksa Oleh :Staf Teknik

Dinas Kimpraswil Kab. Ende

ANTONIUS MANINip : 620 020 639

Mengetahui Pengendali Kegiatan

Kasubdin Produksi Peternakan

Ir. F. P. SAMALATYNip : 620 021 001

Disetujui Oleh :Kontraktor Pelaksana

CV. KSU PEGAWAI NEGERI

H. DJAE DAHLANKuasa Direktur

Diperiksa Oleh :Staf Teknik

Dinas Kimpraswil Kab. Ende

ANTONIUS MANINip : 620 020 639

Mengetahui Pengendali Kegiatan

Kasubdin Produksi Peternakan

Ir. F. P. SAMALATYNip : 620 021 001

Disetujui Oleh :Kontraktor Pelaksana

CV. KSU PEGAWAI NEGERI

H. DJAE DAHLANKuasa Direktur

Diperiksa Oleh :Staf Teknik

Dinas Kimpraswil Kab. Ende

ANTONIUS MANINip : 620 020 639

Mengetahui Pengendali Kegiatan

Kasubdin Produksi Peternakan

Ir. F. P. SAMALATYNip : 620 021 001

Disetujui Oleh :Kontraktor Pelaksana

CV. KSU PEGAWAI NEGERI

H. DJAE DAHLANKuasa Direktur

Diperiksa Oleh :Staf Teknik

Dinas Kimpraswil Kab. Ende

ANTONIUS MANINip : 620 020 639

Mengetahui Pengendali Kegiatan

Kasubdin Produksi Peternakan

Ir. F. P. SAMALATYNip : 620 021 001

CV. KONINDOEngineering & Management ConsultantPerwakilan EndeJl. Radio No. 2 - Kota Raja, Ende - 86311Telp. (0381) 22642

CV. KONINDOEngineering ConsultantPerwakilan EndeJl. Radio No. 2 - Kota Raja, Ende - 86311Telp./Mobile : 085237949596

DiperiksaKonsultan Perencana

CV. KONINDOEngineering Consultant

FRANS S. da COSTA, STKepala Perwakilan

PETRUS BOLI, ST Penata Tk. I

Nip : 19550314 198302 1 003

DibuatKonsultan Perencana

CV. KONINDOEngineering Consultant

VERLY EDWIN, STEstimator

PETRUS BOLI, ST Penata Tk. I

Nip : 19550314 198302 1 003

Page 10: Boq Kosong

Disetujui Oleh :Kontraktor Pelaksana

CV. KSU PEGAWAI NEGERI

H. DJAE DAHLANKuasa Direktur

Diperiksa Oleh :Staf Teknik

Dinas Kimpraswil Kab. Ende

ANTONIUS MANINip : 620 020 639

Mengetahui Pengendali Kegiatan

Kasubdin Produksi Peternakan

Ir. F. P. SAMALATYNip : 620 021 001

Disetujui Oleh :Kontraktor Pelaksana

CV. KSU PEGAWAI NEGERI

H. DJAE DAHLANKuasa Direktur

Diperiksa Oleh :Staf Teknik

Dinas Kimpraswil Kab. Ende

ANTONIUS MANINip : 620 020 639

Mengetahui Pengendali Kegiatan

Kasubdin Produksi Peternakan

Ir. F. P. SAMALATYNip : 620 021 001

Disetujui Oleh :Kontraktor Pelaksana

CV. KSU PEGAWAI NEGERI

H. DJAE DAHLANKuasa Direktur

Diperiksa Oleh :Staf Teknik

Dinas Kimpraswil Kab. Ende

ANTONIUS MANINip : 620 020 639

Mengetahui Pengendali Kegiatan

Kasubdin Produksi Peternakan

Ir. F. P. SAMALATYNip : 620 021 001

Disetujui Oleh :Kontraktor Pelaksana

CV. KSU PEGAWAI NEGERI

H. DJAE DAHLANKuasa Direktur

Diperiksa Oleh :Staf Teknik

Dinas Kimpraswil Kab. Ende

ANTONIUS MANINip : 620 020 639

Mengetahui Pengendali Kegiatan

Kasubdin Produksi Peternakan

Ir. F. P. SAMALATYNip : 620 021 001

Disetujui Oleh :Kontraktor Pelaksana

CV. KSU PEGAWAI NEGERI

H. DJAE DAHLANKuasa Direktur

Diperiksa Oleh :Staf Teknik

Dinas Kimpraswil Kab. Ende

ANTONIUS MANINip : 620 020 639

Disetujui Oleh :Kontraktor Pelaksana

CV. KSU PEGAWAI NEGERI

H. DJAE DAHLANKuasa Direktur

Diperiksa Oleh :Staf Teknik

Dinas Kimpraswil Kab. Ende

ANTONIUS MANINip : 620 020 639

DiperiksaKonsultan Perencana

CV. KONINDOEngineering Consultant

FRANS S. da COSTA, STKepala Perwakilan

PETRUS BOLI, ST Penata Tk. I

Nip : 19550314 198302 1 003Disetujui/Mengetahui Kuasa Pengguna Anggaran /

Kantor Perpustakaan dan Arsip DaerahKabupaten Ende

Drs. PALA AHMADUNIP. 19580518 199108 1 001

DibuatKonsultan Perencana

CV. KONINDOEngineering Consultant

VERLY EDWIN, STEstimator

PETRUS BOLI, ST Penata Tk. I

Nip : 19550314 198302 1 003

Mengetahui Kepala Dinas Pekerjaan Umum

Kabupaten Ende

Ir. LEWANG FRANSISKUSNip : 19620107 199403 1 005

Page 11: Boq Kosong
Page 12: Boq Kosong

REKAPITULASI RENCANA ANGGARAN BIAYA ( RAB )

Peningkatan Sarana dan Prasarana Aparatur

Lanjutan Pembangunan Kantor Perpustakaan dan Arsip Daerah Jl. Diponegoro - Kel. Onekore - Kec. Ende Tengah

JUMLAH

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

- - -

RUPIAH

Err:509

Dibuat Oleh :Konsultan Pengawas

CV. PRIMA MULTI CIPTA

SONNY DA COSTAPengawas

Mengetahui Pengendali Kegiatan

Kasubdin Produksi Peternakan

Ir. F. P. SAMALATYNip : 620 021 001

Dibuat Oleh :Konsultan Pengawas

CV. PRIMA MULTI CIPTA

SONNY DA COSTAPengawas

Mengetahui Pengendali Kegiatan

Kasubdin Produksi Peternakan

Ir. F. P. SAMALATYNip : 620 021 001

Dibuat Oleh :Konsultan Pengawas

CV. PRIMA MULTI CIPTA

SONNY DA COSTAPengawas

Mengetahui Pengendali Kegiatan

Kasubdin Produksi Peternakan

Ir. F. P. SAMALATYNip : 620 021 001

Dibuat Oleh :Konsultan Pengawas

CV. PRIMA MULTI CIPTA

SONNY DA COSTAPengawas

Mengetahui Pengendali Kegiatan

Kasubdin Produksi Peternakan

Ir. F. P. SAMALATYNip : 620 021 001

DibuatKonsultan Perencana

CV. KONINDOEngineering Consultant

VERLY EDWIN, STEstimator

PETRUS BOLI, ST Penata Tk. I

Nip : 19550314 198302 1 003

Page 13: Boq Kosong

Dibuat Oleh :Konsultan Pengawas

CV. PRIMA MULTI CIPTA

SONNY DA COSTAPengawas

Mengetahui Pengendali Kegiatan

Kasubdin Produksi Peternakan

Ir. F. P. SAMALATYNip : 620 021 001

Dibuat Oleh :Konsultan Pengawas

CV. PRIMA MULTI CIPTA

SONNY DA COSTAPengawas

Mengetahui Pengendali Kegiatan

Kasubdin Produksi Peternakan

Ir. F. P. SAMALATYNip : 620 021 001

Dibuat Oleh :Konsultan Pengawas

CV. PRIMA MULTI CIPTA

SONNY DA COSTAPengawas

Mengetahui Pengendali Kegiatan

Kasubdin Produksi Peternakan

Ir. F. P. SAMALATYNip : 620 021 001

Dibuat Oleh :Konsultan Pengawas

CV. PRIMA MULTI CIPTA

SONNY DA COSTAPengawas

Mengetahui Pengendali Kegiatan

Kasubdin Produksi Peternakan

Ir. F. P. SAMALATYNip : 620 021 001

Dibuat Oleh :Konsultan Pengawas

CV. PRIMA MULTI CIPTA

SONNY DA COSTAPengawas

DibuatKonsultan Perencana

CV. KONINDOEngineering Consultant

VERLY EDWIN, STEstimator

PETRUS BOLI, ST Penata Tk. I

Nip : 19550314 198302 1 003

Mengetahui Kepala Dinas Pekerjaan Umum

Kabupaten Ende

Ir. LEWANG FRANSISKUSNip : 19620107 199403 1 005

Page 14: Boq Kosong
Page 15: Boq Kosong

1,000,000,000.00 1,000,000,000.00 ( 8.23% X JUMLAH BIAYA PEK. KONSTRUKSI )

( 5.35% X JUMLAH BIAYA PEK. KONSTRUKSI )

1,000,000,000.000 - 9.550 1,000,000,000.000 - 1.750

1,000,000,000.00

1,010,951,500.00

0.00%

Page 16: Boq Kosong

1

31.5

6.00%

92.00%

98.00%

Page 17: Boq Kosong
Page 18: Boq Kosong
Page 19: Boq Kosong
Page 20: Boq Kosong
Page 21: Boq Kosong
Page 22: Boq Kosong
Page 23: Boq Kosong
Page 24: Boq Kosong
Page 25: Boq Kosong
Page 26: Boq Kosong
Page 27: Boq Kosong
Page 28: Boq Kosong
Page 29: Boq Kosong
Page 30: Boq Kosong
Page 31: Boq Kosong
Page 32: Boq Kosong
Page 33: Boq Kosong
Page 34: Boq Kosong
Page 35: Boq Kosong
Page 36: Boq Kosong
Page 37: Boq Kosong
Page 38: Boq Kosong
Page 39: Boq Kosong
Page 40: Boq Kosong
Page 41: Boq Kosong
Page 42: Boq Kosong
Page 43: Boq Kosong
Page 44: Boq Kosong
Page 45: Boq Kosong
Page 46: Boq Kosong
Page 47: Boq Kosong
Page 48: Boq Kosong
Page 49: Boq Kosong
Page 50: Boq Kosong
Page 51: Boq Kosong
Page 52: Boq Kosong
Page 53: Boq Kosong
Page 54: Boq Kosong
Page 55: Boq Kosong
Page 56: Boq Kosong
Page 57: Boq Kosong
Page 58: Boq Kosong
Page 59: Boq Kosong
Page 60: Boq Kosong
Page 61: Boq Kosong
Page 62: Boq Kosong
Page 63: Boq Kosong
Page 64: Boq Kosong
Page 65: Boq Kosong
Page 66: Boq Kosong
Page 67: Boq Kosong
Page 68: Boq Kosong
Page 69: Boq Kosong
Page 70: Boq Kosong
Page 71: Boq Kosong
Page 72: Boq Kosong
Page 73: Boq Kosong
Page 74: Boq Kosong
Page 75: Boq Kosong
Page 76: Boq Kosong
Page 77: Boq Kosong
Page 78: Boq Kosong
Page 79: Boq Kosong
Page 80: Boq Kosong
Page 81: Boq Kosong
Page 82: Boq Kosong
Page 83: Boq Kosong
Page 84: Boq Kosong
Page 85: Boq Kosong
Page 86: Boq Kosong
Page 87: Boq Kosong
Page 88: Boq Kosong
Page 89: Boq Kosong
Page 90: Boq Kosong
Page 91: Boq Kosong
Page 92: Boq Kosong
Page 93: Boq Kosong
Page 94: Boq Kosong
Page 95: Boq Kosong
Page 96: Boq Kosong
Page 97: Boq Kosong
Page 98: Boq Kosong
Page 99: Boq Kosong
Page 100: Boq Kosong
Page 101: Boq Kosong
Page 102: Boq Kosong
Page 103: Boq Kosong
Page 104: Boq Kosong
Page 105: Boq Kosong
Page 106: Boq Kosong

Dibuat Oleh :Konsultan Pengawas

CV. PRIMA MULTI CIPTA

SONNY DA COSTA, STPengawas

Page 107: Boq Kosong
Page 108: Boq Kosong
Page 109: Boq Kosong

Dibuat Oleh :Konsultan Pengawas

CV. PRIMA MULTI CIPTA

SONNY DA COSTA, STPengawas

Page 110: Boq Kosong
Page 111: Boq Kosong
Page 112: Boq Kosong
Page 113: Boq Kosong
Page 114: Boq Kosong

RUPIAH

0.00

pagu dana 143,130,000.00

Pws

Page 115: Boq Kosong

Kontruksi

4.50

-

-

-

- -

- -

- -

Mengetahui Pengendali Kegiatan

Kasubdin Produksi Peternakan

Ir. F. P. SAMALATYNip : 620 021 001

Mengetahui Pengendali Kegiatan

Kasubdin Produksi Peternakan

Ir. F. P. SAMALATYNip : 620 021 001

Page 116: Boq Kosong
Page 117: Boq Kosong

Ratus Se 00000000

Ribu 1 Satu 0

Juta 2 Dua 0

Puluh 3 Tiga 0

Belas 4 Empat 0

Sen 5 Lima 0

Rupiah 6 Enam 0

000000000000000 7 Tujuh 0

spasi 8 Delapan 0

Milyar 9 Sembilan 0

Trilyun 0 Rupiah 0

0 0

0

0 0

0

- 4,700,000

4,700,000.00

Page 118: Boq Kosong

Mengetahui Kepala Dinas Pekerjaan Umum

Kabupaten Ende

Ir. L. Y. V. MARIOPembina

Nip : 19620323 199211 1 002

Page 119: Boq Kosong
Page 120: Boq Kosong

KOP PERUSAHAAN

RENCANA ANGGARAN BIAYA (RAB)

PROGRAM : Peningkatan Sarana dan Prasarana AparaturKEGIATAN : Pembangunan Gedung KantorPEKERJAAN : Lanjutan Pembangunan Kantor Perpustakaan dan Arsip Daerah LOKASI : Jl. Diponegoro - Kel. Onekore - Kec. Ende TengahTAHUN ANGGARAN : 2015

No Jenis Pekerjaan Vol. Sat.1 2 3 4

I PEK. PERSIAPAN

1 Papan Nama Proyek 1.00 Ls

2 Pembelian Bahan steling dan Pembuatannya 1.00 Ls

3 Pembongkaran Kolom Lt. 2 1.00 Ls

4 Pembersihan Lokasi ( Awal dan Akhir ) 1.00 Ls

5 Penyediaan Air Kerja 1.00 Ls

6 Sewa listrik 1.00 Ls

7 Administrasi dan Dokumentasi 1.00 Ls Jumlah

II PEK. PASANGAN & PLESTERAN

1 Pas. Dinding bata merah 1/2 batu camp. 1pc : 6psr 105.17

2 Pas. Kaca Glass Block 48.00 Bh

3 Pas. Batu roster 20/20 cm 1.44

4 Plest. Tembok camp. 1pc : 6psr 432.29

5 Acian Dinding Semen 432.29 Jumlah

III PEK. BETON 1PC : 2PSR : 3KRLKolom

1 Beton Kolom 30/30 2.65 - Pembesian 316.31 Kg

- Begisting kolom 10.58

2 Beton Kolom bulat Ø 25 cm 4.40

- Begisting untuk kolom 4.40

3 Beton Kolom Praktis 15/15 1.40 - Pembesian 165.46 Kg

- Begisting untuk Kolom 4.68 Balok

4 Beton Ring Balok 20/30 Lt. 2 4.18 - Pembesian 751.96 Kg

- Begisting untuk Ringbalk 12.53

5 Cor Ring Balok Talang Beton 11/25 Lt. 2 0.92 - Pembesian 73.13 Kg

M2

M2

M2

M2

M3

M2

M3

M2

M3

M2

M3

M2

M3

CV. KONINDOEngineering & Management ConsultantPerwakilan EndeJl. Radio No. 2 - Kota Raja, Ende - 86311Telp. (0381) 22642

Page 121: Boq Kosong

- Begisting untuk Ringbalk 10.89

6 Beton Balok Latai 11/20 2.76 - Pembesian 494.40 Kg

- Begisting untuk Balok Latai 17.54

7 Beton Ring Balok 11/20 Lt. 2 0.35 - Pembesian 50.97 Kg

- Begisting untuk Ringbalk 3.15

8 Beton Balok Gewel 11/20 ut. Lt 2 0.18 - Pembesian 35.22 Kg

- Begisting 1.63 Plat dan Tangga

9 Plat Beton Lt. 3, Dak Talang, Pet kusen & Penutup tang 11.64 - Pembesian 424.88 Kg

- Begisting untuk Lantai 80.47 Jumlah

No Jenis Pekerjaan Vol. Sat.1 2 3 4IV PEK. KAYU DAN KACA 1 Pek. Kusen Kayu Bayam 6/12 cm 2.00 2 Pas. Daun Pintu & Jendela Panil Kaca kayu bayam 60.63 3 Pas.Kaca polos 5 mm 11.26 4

- Ukuran 60/115 cm (34 bh) 23.46

- Ukuran 50/115 cm (16 bh) 3.68

5 Pas. Daun Pintu Panil Papan kayu bayam 10.70 Jumlah

V PEK. ATAP DAN PLAFOND

1 Pek. Rangka Atap baja ringan Galvalum 209.50

2 Pas. Atap seng genteng 0.25 (multi roof) 209.50

3 Pas. Bubungan genteng seng 38.00

4 Pas. Listplank dengan kalsiplank Iggi Truss 0,008/20 c 17.50

5 Pas. rangka Plafond dari hollow galvalum Uk. 4 x 4 cm 223.04

6 Pas. Plafond Gipsum 9 mm 223.04

7 Meng,List Plafond Gypsum Minimalis lebar 10cm 150.50 Jumlah

VI PEK. KERAMIK , LANTAI DAN DINDING

1 Pas. Plint granit 60 x 10 182.20

2 Pas. Lantai Granit 60 x 60 warna Creem 246.95

3 Pas. Dinding Keramik KM/WC 20 x 25 (platinum) 9.60 Jumlah

VII PEK. PENGECATAN

1 Politur Kayu Kusen & Boven 67.87

M2

M3

M2

M3

M2

M3

M2

M3

M2

M3

M2

M2

Pembuatan dan pas. teralis jendela besi ulir Ø 8" finising cat hitam Dof

M2

M2

M2

M3

M2

M1

M1

M2

M2

M1

M1

M2

M2

M2

Page 122: Boq Kosong

2 Cat Tembok 432.2862

3 Cat Plafond dengan cat tembok 223.04

4 Politur Daun Pintu 18.357 Jumlah

VIII PEK. PENGGANTUNG DAN PENGUNCI 1 Pasang Kunci Tanam 2x Putar Kw. 1 6.00 Bh2 Pasang Engsel Pintu ( 3 bh / daun ) 27.00 Bh3 Pasang Engsel Jendela angin ( 2 bh / daun ) 112.00 Bh4 Pasang Grendel Jendela 44.00 Bh5 Pasang Grendel Pintu Panjang 8.00 Bh

Jumlah IX PEK . INSTALASI LISTRIK & SANITASI 1 Pas. Meteran Listrik daya 2200 Kwh 1.00 Unit 2 Pas. kabel Tray U (300x50x2400x1,2 mm) 60.00 M1 3 Pas. Tutup kabel Tray (300x50x2400x1,2 mm) 60.00 M1 4 Pas. Tee Kabel Tray U (300x300x50x1,2 mm) 2.00 M1 5 Pas. Cross Kabel Tray (300x300x100x1,2 mm) 1.00 M1 6 Hanger/Penyangga Kabel Tray (300x1,2 mm) 60.00 Bh 7 Pas. Titik Lampu + Instalasi Listrik dalam bangunan 23.00 titik 8 Pas. Kabel Listrik NYA 3 x 2,5 mm (50 m) 8.00 Roll 9 Pas. Lampu TL 40 Watt 22.00 bh

10 Pas. Lampu Philips LED 7 watt 11.00 bh 11 Pas. Saklar Tunggal 1.00 bh 12 Pas. Saklar Ganda 9.00 bh 13 Pas. Stop Kontak 10.00 bh 14 Pas. Sekring MCB 2 Grup 2.00 unit 15 Pas. Penagkal Petir 2.00 unit

16 1.00 unit 17 Dinamo Air daya hisap 20 m 1.00 Buah 18 Reservoir air Stainlees steel 1100 liter 2.00 Buah 19 Pembuatan Septicktank dan Peresapan 1.00 unit 20 Pas. Kloset Duduk Mono Block (Merk Toto) 1.00 bh

No Jenis Pekerjaan Vol. Sat.1 2 3 4

21 Floor Drain Logam/Stainlees steel 1.00 bh 22 Pipa penguras PVC Ø 3/4" 1.00 bh 23 Kran Air Stainlees steel 1.00 bh 24 Pemasangan Wastafell 1.00 Buah

25 Instalasi Air Pipa galvanis Ø 1/2" 30.00

26 Instalasi Air kotor pipa PVC dia 2" 50.00

27 Instalasi Air kotor pipa PVC dia 4" 20.00 28 Pembuatan Bak Peresapan Air Kotor/Hujan 1.00 Unit

Jumlah X PEK. BESI

M2

M2

M2

Pek. Bak Penampung Air 4,5 M3

M1

M1

M1

Page 123: Boq Kosong

1 42.30

2 52.79

3 Penulisan papan nama kantor (Logam/stainlees steel) 1.00 Ls Jumlah

XI PEK. PAGAR PENGAMAN 1 Pembongkaran Pagar Depan dan Pojok Belakang Gedu 1.00 Ls

2 Galian Pondasi Pagar depan 1.35

3 Pas. Pondasi Pagar depan 1.35

4 Urugan Tanah 5.50

5 Pas. Lantai semen samping dan Belakang gedung lama 29.50

6 Pas. Tembok Belakang Gedung 1pc : 6psr 8.25

7 Cor Sloof Beton 15/20, camp. 1pc : 2psr : 3krl 1.02 - Pembesian 152.74 Kg

- Begisting 5.92

8 Cor Kolom Beton 11/20, camp. 1pc : 2psr : 3krl 2.82 - Pembesian 133.88 Kg

- Begisting 3.97

9 Cor Ring Balk Beton 11/20, camp. 1pc : 2psr : 3krl 0.22 - Pembesian 33.01 Kg

- Begisting 2.00

10 Pas. Dind. Pagar dan Bak Taman 1/2 bata. 1pc : 6psr 34.68

11 Plesteran Dinding Tembok 1pc : 6psr 137.08

12 Acian Dinding Tembok 137.08

13 Cat dinding Tembok 137.08 14 58.47

15 Perataan/Stripping Are Paving 190.00

16 Pemasangan Paving Block uk. 10/20 cm 190.00 Jumlah

XII PEK. GARASI 1 Galian pondasi 0.75

2 Cor pondasi telapak 1pc : 3psr : 5krl 0.90

3 42.00

Jumlah

Ende, 2016

P E N A W A RPT/CV/Fa. ................................

Pemasangan Relling Tangga dan Balkon (Besi Hollow) Stainlees Steel uk. 4/4 dan 2/4 cm

M2

Pembuatan dan Pemasangan Pagar Depan (Besi Hollow) Stainlees Steel uk. 4/4 dan 2/4 cm

M2

M3

M3

M3

M2

M3

M3

M2

M3

M2

M3

M2

M2

M2

M2

M2

Pas. Dinding Granit Pagar depan Ukuran 60 x 60 cm warna Cream

M2

M2

M2

M3

M3

Pembuatan & pemasangan garasi dari besi hollow Uk. 2/4cm, 4/4cm, 5/5cm + Atap polycarbonat finishing cat hitam dof

M2

Page 124: Boq Kosong

.........................................J a b a t a n

Page 125: Boq Kosong

KOP PERUSAHAAN

RENCANA ANGGARAN BIAYA (RAB)

Lanjutan Pembangunan Kantor Perpustakaan dan Arsip Daerah

Harga Satuan Jumlah Harga5 6

Jumlah

Jumlah

Page 126: Boq Kosong

Jumlah

Harga Satuan Jumlah Harga5 6

Jumlah

Jumlah

Jumlah

Page 127: Boq Kosong

Jumlah

Jumlah

Harga Satuan Jumlah Harga5 6

Jumlah

Page 128: Boq Kosong

Jumlah

Jumlah

Jumlah

Ende, 2016

P E N A W A RPT/CV/Fa. ................................

Page 129: Boq Kosong

.........................................J a b a t a n

Page 130: Boq Kosong

PERHITUNGAN VOLUME PEKERJAAN

PROGRAM Peningkatan Sarana dan Prasarana AparaturKEGIATAN Pembangunan Gedung KantorPEKERJAAN Lanjutan Pembangunan Kantor Perpustakaan dan Arsip Daerah LOKASI Jl. Diponegoro - Kel. Onekore - Kec. Ende TengahTAHUN ANGGARAN 2015

No. Uraian Pekerjaan KeteranganDimensi

LuasLbr Tgi Jml

( Bh ) 1 Pas. Tembok Lt.1 3.10 92.535

Pas. Tembok Lt.2 3.00 99 Pas. Tembok Balkon Lt.2 1.00 8Pas. Tembok gewel LT. 3 1.65 0.50 4.54Pas. Tembok Penutup tangga LT. 3 1.00 1.00 4.00

208.073Luasan Lubang kusenPV1 = 4Bh 2.15 1.45 3.00 9.35

0.25 0.45 16.00 1.80 PV2 = 5Bh 2.15 0.95 5.00 10.21

0.25 0.45 20.00 2.25 P3. 1 Bh 2.15 0.8 1.00 1.72JV1. 11 Bh 1.9 1.35 11.00 28.215

0.25 0.45 44.00 4.95BV1 9 Bh 0.25 0.45 36.00 4.05JV2. 17 Bh 1.25 1.35 17.00 28.69

0.25 0.45 68.00 7.65Br Baru roster 0.4 1.2 3.00 1.44Glass Block GB1 0.8 0.60 4.00 1.92BV Dia 42 CM 0.66

102.91 Jumlah Total Pas. Dinding Tembok 105.17

2 Glass Block 0.8 0.60 4.00 1.923 Baru roster 0.4 1.2 3.00 1.44

4 Plest. Tembok = Luas Pas. Tbk - 3.50 115.50 Luas Lubang Kusen / C - B 3.50 184.80

300.30394.79

Plesteran/Acian Gewel 0.00 Plesteran samping lorong 2.5 37.50 Luas total Plesteran/acian tembok 432.29

Cor Kolom Beton struktur 0.35 0.60 18.00 Cor Kolom bundar Beton struktur 0.785 1.00 2.00

0.785 2.00 2.00

Cor Kolom Beton praktis Lt. 1 sudah dikerjakan Cor Kolom Beton praktis utk pagar balkon 0.15 1.00 11.00 Cor Kolom Beton praktis Lt. 2 0.15 3.05 11.00 Cor Kolom Beton praktis Lt. 3 0.15 1.85 3.00

( m1) ( m1) ( m2 )

:::::

Page 131: Boq Kosong

No. Uraian Pekerjaan KeteranganDimensi

LuasLbr Tgi Jml

( Bh ) ( m1) ( m1) ( m2 ) Cor Kolom Beton praktis Lt. 3 ut. Plat Penutup 0.15 3.50 2.00

Cor Ring Balok Beton ut. Lt. 2 0.20 0.30 Cor Plat Lantai 3 & Penutup tangga 2.00 0.12 Cor Plat tudung pintu dan jendela 1.75 0.12

2.00 0.10

Cor Plat tudung pintu dan jendela PV1 = 4Bh 0.40 0.10 4.00JV1. 11 Bh 0.40 0.10 11.00JV2. 17 Bh 0.40 0.10 17.00

Cor Tangga Beton & Bordes 1.00 0.12 anak tangga 0.28 0.18

bordes 1.00 0.12

Cor. Balok Latai ut. Lt 1 0.10 0.20Cor. Balok Latai ut. Lt 2 0.10 0.20

Cor. Balok Gewel ut. Lt 2 0.15 0.20

Page 132: Boq Kosong

No. Uraian Pekerjaan KeteranganDimensi

LuasLbr Tgi Jml

( Bh ) ( m1) ( m1) ( m2 )

4 Pek. Kayu Kusen 6/12 cmPV1 = 4Bh 0.12 0.06 4.00

Boven 0.12 0.06 16.00 PV2 = 2Bh 0.12 0.06 2.00

Boven 0.12 0.06 6.00 P3. 1 Bh 0.12 0.06 1.00

JV1. 4 Bh 0.12 0.06 4.00 Boven 0.12 0.06 16.00

BV1. 9 Bh 0.12 0.06 36.00 JV2. 17 Bh 0.12 0.06 18.00

Boven 0.12 0.06 72.00

Terbuang

5 Pas. Daun Pintu & Jendela Panil Kaca 5 mmPV1 = 4Bh 1.32 2.11 4.00 11.14JV1. 11 Bh 1.24 1.82 11.00 24.82JV2. 17 Bh 1.24 1.17 17.00 24.66

60.636 Pas. Kaca polos 5 mm pada boven

PV1 = 4Bh 0.17 0.37 16.00 1.01PV2 = 5Bh 0.17 0.37 15.00 0.94BV1. 9 Bh 0.17 0.37 36.00 2.26JV1. 11 Bh 0.17 0.37 44.00 2.77JV2. 17 Bh 0.17 0.37 68.00 4.28

11.267 Pas. Daun Pintu Panil papan

PV2 = 5Bh 0.87 2.11 5.00 9.18Pas. Daun Double teakwood Lapis Aluminium (Km/Wc)

P3. 1 Bh 0.72 2.11 1.00 1.5210.70

8 Tralis Besi Ulir - ukuran 60/115 cm (34 bh) 0.6 1.15 34.00 23.46 - ukuran 50/115 cm (16 bh) 0.2 1.15 16.00 3.68

27.14

PEK. ATAP DAN PLAFOND 9 Pas. Kap kuda-kuda

KK. 1 = 2 bh 0.12 0.06 2.00 KK. 2 = 2 bh 0.12 0.06 2.00 KK. 3 = 2 bh 0.12 0.06 1.00

1/2 KK = 2 bh 0.12 0.06 2.00 Konsul 0.12 0.06 2.00

Ditambah 10% terbuang

Pas. Gording 0.12 0.06 1.00 Jurai / Bubungan 0.12 0.06 36.00

Ditambah 10% terbuang

Total Kuda-kuda + gording Usuk 5/7 0.07 0.05 1.00 Reng 3/4 0.04 0.03 1.00

Page 133: Boq Kosong

No. Uraian Pekerjaan KeteranganDimensi

LuasLbr Tgi Jml

( Bh ) ( m1) ( m1) ( m2 )

Pas. Talang Atap Seng BJLS 0,30 11.50 9 Pas. Atap seng sakra roof BJLS 0,25

Bidang 1 10.5 2.00 95.55 Bidang 2 4.75 2.00 38.00 Bidang 3 2.5 15.00 Bidang 4 3.5 19.25 Bidang 5 3 12.00 Bidang 6 3 2.00 18.00 Bidang 7 3 5.25 Bidang 8 1.5 6.45

209.5010 Pasang kaso+reng genteng kayu kayu Batu kls II 209.5011 Pas. Bubungan Atap Seng sakura roof 3812 Talang miring/ jurai dalam 1013 Pas. Listplank

Page 134: Boq Kosong

No. Uraian Pekerjaan KeteranganDimensi

LuasLbr Tgi Jml

( Bh ) ( m1) ( m1) ( m2 )

14 Pas. Plafond Tripleks 6 mm Lt. 1 7.5 75.00

5.5 30.251.5 3.00

Lt. 2 8.3 81.343.75 26.63

Konsul 1.5 6.83223.04

15 Pas. List Plafond 150.50

PEK. KERAMIK , LANTAI DAN DINDING 16 Pas. Plint Keramik 10 x 60

17 Pas. Lantai Keramik 60 x 60 Lt,.1 + Lt. 2 7.5 2.00 135.007.5 2.00 82.50

Lt. 3 3.5 19.25 Kurang lubang tangga -4 -8.00

Tangga 2 18.20246.95

Pas. Lantai Keramik KM/WC 20 x 20 1.5 2.25

18 Pas. Dinding & bak Keramik KM/WC 20 x 25 1.6 8.320.8 1.28

9.60

PEK. PENGECATAN 19 Politur Kayu Kusen & Boven

PV1 = 4Bh 0.21 4.00 4.70Boven 0.21 16.00 2.35

PV2 = 5Bh 0.21 5.00 4.36Boven 0.21 15.00 2.21

P3. 1 Bh 0.21 1.00 1.05JV1. 11 Bh 0.21 11.00 11.20

Tengah 0.32 11.00 6.34Boven 0.21 44.00 6.47

BV1. 9 Bh 0.21 36.00 5.29JV2. 17 Bh 0.12 17.00 7.65

Tengah 0.32 17.00 6.26Boven 0.21 68.00 10.00

67.87 Cat Kayu Kusen & Boven (politur) 67.87

20 Cat Tembok 432.2921 Cat Listplank 17.5022 Cat Plafond 223.0423 Politur Daun Pintu

PV2 = 5Bh 0.87 2.11 10.00 18.36

PEK. PENGGANTUNG DAN PENGUNCI 24 Pasang Kunci Tanam 2x Putar 6.00 25 Pasang Engsel Pintu ( 3 bh / daun )

Lt. 1

Lt. 2

Lt. 1

Lt. 2

Page 135: Boq Kosong

No. Uraian Pekerjaan KeteranganDimensi

LuasLbr Tgi Jml

( Bh ) ( m1) ( m1) ( m2 )PV1 = 3Bh 18.00 PV2 = 2Bh 6.00

P3. 1 Bh 3.00 27.00

26 Pasang Engsel Jendela ( 2bh/ daun) JV1. 11 Bh 44.00 JV2. 17 Bh 68.00

112.00 27 Pasang Grendel Jendela ( 1bh/daun)

JV1. 11 Bh 22.00 JV2. 17 Bh 22.00

44.00 Pasang Kait Angin Jendela

JV1. 11 Bh 44.00 JV2. 17 Bh 68.00

112.00 28 Pasang Grendel Pintu Panjang

PV1 = 4Bh 8.00

Page 136: Boq Kosong

No. Uraian Pekerjaan KeteranganDimensi

LuasLbr Tgi Jml

( Bh ) ( m1) ( m1) ( m2 )

PEK . INSTALASI LISTRIK & SANITASI 30 Pas. Instalasi Listrik dalam bangunan 23.00

Pas. Kabel NGA 3 x 2,5 mm 8.00 31 Pas. Lampu TL 40 Watt 22.00 32 Pas. Lampu Philips 18 Watt 11.00 33 Pas. Saklar Tunggal 1.00 34 Pas. Saklar Ganda 9.00 35 Pas. Stop Kontak 10.00 36 Pas. MCB 3 Grup 2.00 37 Bak Penampung Air 4,5 M3 38 Dinamo Air daya hisap 20 m 39 Reservoir air Stainlees steel 1100 liter 40 Pembuatan Septicktank dan Peresapan 1.00 41 Pas. Kloset Duduk 1.00 42 Floor Drain 1.00 43 Pipa penguras 1.00 44 Kran Air 1.00 45 Pemasangan Wastafell 1.00 46 Instalasi Air Pipa GIP dia 1/2" 30.00 47 Instalasi Air kotor pipa PVC dia 2" 1.00 48 Instalasi Air kotor pipa PVC dia 4" 1.00 49 Pas. Penagkal Petir 4.00

Pas. Tembok Pagar Belakang Gedung Gal. Pondasi 0.8 0.8Pas. Pondasi 0.5 2.3

Pas. Dinding tembok 1.2 31.20sloof

kolomring balk

PEK. PAGAR PENGAMAN Pek. Galian Tanah Pagar pojok blkng gedung 0.6 0.7 Pondasi pintu pagar

50 Galian tanah Pond. Pagar Depan 0.4 0.4551 Pas. Pondasi Pas. Pondasi 0.4 0.4552 Timbunan tanah 1.00 0.553 Lantai semen biasa 1 29.50

54 Pas. Tembok Belakang Gedung 0.5 1.5 Cor Sloof Beton 11/20, lihat hitungan beton 0.15 0.2 Cor Sloof Beton 11/20, lihat hitungan beton Cor Sloof Beton 11/20, lihat hitungan beton

55 Pas. Tembok pagar depan Gedung Pagar Pojok belakang 1.4 12.60 Pagar depan 0.3 6.27 Papan Nama 3.00 6.00 Bak Taman 0.60 9.81

34.68 Siar Pondasi Pondasi 0.30 3.30

56 Plesteran, Acian/Cat Dinding Tembok Pagar Pojok belakang 2.00 2 88.00 Pagar depan 0.3 2 25.08 Papan Nama 3.00 2 24.00 Bak Taman 0.50 1 16.35

137.08

Page 137: Boq Kosong

No. Uraian Pekerjaan KeteranganDimensi

LuasLbr Tgi Jml

( Bh ) ( m1) ( m1) ( m2 )57 Pasang granito pagar depan

Pagar depan 0.3 2 25.08 Papan Nama 3.00 1.5 18.00 Tiang Kolom 1.20 2.40 7 8.40 Tepian Atas pagar 0.30 ### 9 2.70 Tepian Samping pagar 0.30 3.00 2 0.60 Tepian Bawah pagar 0.20 3.69

58.47 Pagar besi hollow pagar 1.83 42.09

pintu pagar Dorong 2.3 9.20 pintu pagar Lorong 1.5 1.50

52.79

Pekerjaan Garasi58 Galian pondasi 0.50 ### 6.00 59 Cor pondasi telapak 1pc : 3psr : 5krl 0.50 0.60 6.00 60 Pemb. & pas. garasi dari pipa Galvanis 7.00 42.00

Med. A Ø 2", Ø 1" + Atap polycarbonat61 Bak Peresapan 2

Page 138: Boq Kosong

No. Uraian Pekerjaan KeteranganDimensi

LuasLbr Tgi Jml

( Bh ) ( m1) ( m1) ( m2 )

62 Pasang relling tangga dan pagar balkonRelling tangga Lt.2 1.00 9.00Relling tangga Lt.3 1.00 9.00Relling tangga kanopy 1.00 13.00Pagar balkon 1.00 11.30

42.3063 Penulisan papan nama kantor (Logam/stainlees steel)

64 Pas. Paving BlockBid. 1 5 40.00

11 110.004 40.00

190.00

Ende, 2016

DibuatKonsultan Perencana

CV. KONINDOEngineering Consultant

VERLY EDWIN, STEstimator

PETRUS BOLI, ST Penata Tk. I

Nip : 19550314 198302 1 003

DiperiksaPenanggung Jawab

CV. KONINDOEngineering Consultant

FRANS S. da COSTA, STKepala Perwakilan

PETRUS BOLI, ST Penata Tk. I

Nip : 19550314 198302 1 003

Page 139: Boq Kosong

PERHITUNGAN VOLUME PEKERJAAN

Lanjutan Pembangunan Kantor Perpustakaan dan Arsip Daerah

KodeVol

A

jml 48

B

jml 48

CD

1.32 0.55 1.10 1.65

0.25 0.75 0.12

( m3 )

Page 140: Boq Kosong

KodeVol

( m3 ) 0.16 1.28 1.62 0.48 1.16 0.70 2.34

0.22 0.59 0.92 1.74

0.920.190.241.35

0.59 1.902.490.24

Page 141: Boq Kosong

KodeVol

( m3 )

0.16 0.08 0.06 0.03

0.04 0.18

0.080.180.640.36

1.81 0.10 0.18

2.00

0.46 0.27 0.04 0.23 0.11 1.11 0.11 1.22 0.74 1.04 0.18 1.96 3.18 0.40 0.16

Page 142: Boq Kosong

KodeVol

( m3 ) 0.56

Page 143: Boq Kosong

KodeVol

( m3 )

Page 144: Boq Kosong

KodeVol

( m3 )

Page 145: Boq Kosong

KodeVol

( m3 )

17.2831.05

4.62

1.351.35

5.5

8.25

Page 146: Boq Kosong

KodeVol

( m3 )

0.750 0.900

Page 147: Boq Kosong

KodeVol

( m3 )

Ende, 2016

DibuatKonsultan Perencana

CV. KONINDOEngineering Consultant

VERLY EDWIN, STEstimator

PETRUS BOLI, ST Penata Tk. I

Nip : 19550314 198302 1 003

Page 148: Boq Kosong

KOP PERUSAHAAN

ANALISA HARGA SATUAN PEKERJAAN

PROGRAM : Peningkatan Sarana dan Prasarana AparaturKEGIATAN : Pembangunan Gedung KantorPEKERJAAN : Lanjutan Pembangunan Kantor Perpustakaan dan Arsip Daerah LOKASI : Jl. Diponegoro - Kel. Onekore - Kec. Ende TengahTAHUN ANGGARAN : 2015

1. PT - 6.1 1 m³ Galian tanah biasa sedalam 1 meterSNI 2010

Kebutuhan Indeks

Tenaga KerjaPekerja OH 0.400Mandor OH 0.040

Jumlah harga per-satuan pekerjaan

2. PT - 6.11SNI 2010

Kebutuhan Indeks

Bahan Tanah urug 1.2000

Tenaga KerjaPekerja OH 0.3000 Mandor OH 0.0100

Jumlah harga per-satuan pekerjaan

3. PP - 6.7.SNI 2010

Kebutuhan Indeks

Batu belah 15/20cm 1.1000

Bahan PC Kg 117.0000

PP 0.5610

Tenaga Kerja

Pekerja OH 1.5000 Tukang batu OH 0.6000 Kepala Tukang OH 0.0600 Mandor OH 0.0750

Jumlah harga per-satuan pekerjaan

4. PB - 6.1 1 m3 Membuat beton tumbuk, 1 PC : 3 Ps : 5 Kr4 dari 28

Kebutuhan IndeksSNI 2002

Bahan

PC Kg 218.0000

Satuan

Mengurug 1 m3 tanah peninggian lantai bangunan

Satuan

m3

1 m3 Pasang pondasi batu kali, 1 Pc : 6 Ps

Satuan

m3

m3

Satuan

Page 149: Boq Kosong

Bahan PB 0.5200

Koral beton 2/3 0.8700

Tenaga Kerja

Pekerja OH 1.6500 Tukang batu OH 0.2500 Kepala Tukang OH 0.0250 Mandor OH 0.0800

Jumlah harga per-satuan pekerjaan

5. PB - 6.13 Membuat 1 m3 beton bertulang 1 PC : 2 Ps : 3 KrSNI 2010

Kebutuhan Indeks

Bahan

PC Kg 336.0000

PB 0.5400

Koral Beton 2/3 0.8100

Tenaga Kerja

Pekerja OH 2.0000 Tukang batu OH 0.3500 Kepala Tukang OH 0.0350 Mandor OH 1.0000

Jumlah harga per-satuan pekerjaan

6. PB - 6.25 1 Kg Pembesian dengan Besi polosSNI 2010

Kebutuhan Indeks

BahanBesi beton Kg 1.0500 kawat beton Kg 0.0150

Tenaga Kerja

Pekerja OH 0.0070 Tukang batu OH 0.0070 Kepala Tukang OH 0.0070 Mandor OH 0.0030

Jumlah harga per-satuan pekerjaan

7. PB - 6.29 1M2 Pasang bekisting untuk sloofSNI 2010

Kebutuhan Indeks

BahanPapan Kayu kelas III Kg 0.0450

m3

m3

Satuan

m3

m3

Satuan

Satuan

Page 150: Boq Kosong

Bahan Paku 5 - 12 cm Kg 0.3000 Minyak bekisting ltr 0.1000

Tenaga Kerja

Pekerja OH 0.3000 Tukang batu OH 0.2600 Kepala Tukang OH 0.0260 Mandor OH 0.0050

Jumlah harga per-satuan pekerjaan

8. PB - 6.30 Memasang 1M2 bekisting untuk kolomSNI 2010

Kebutuhan Indeks

Bahan

Papan Begesting 0.0400

Paku 5 - 12 cm Kg 0.4000 Minyak bekisting ltr 0.2000

Balok kayu kelas II 0.0150

Tripleks 9 mm Lbr 0.3500 Bambu Btg 2.0000

Tenaga Kerja

Pekerja OH 0.3000 Tukang batu OH 0.3300 Kepala Tukang OH 0.0330 Mandor OH 0.0060

Jumlah harga per-satuan pekerjaan

9. PB - 6.31 Memasang 1M2 bekisting untuk balok (latai, ringbalk, gewel)SNI 2010

Kebutuhan Indeks

Bahan

Papan Begesting 0.0400

Paku 5 - 12 cm Kg 0.4000 Minyak bekisting ltr 0.2000

Balok kayu kelas II 0.0180

Tripleks tebal 9 cm Lbr 0.3500 Bambu Btg 2.0000

Tenaga Kerja

Pekerja OH 0.3200 Tukang batu OH 0.3300 Kepala Tukang OH 0.0330 Mandor OH 0.0060

Jumlah harga per-satuan pekerjaan

10. PB - 6.32 Memasang 1M2 bekisting untuk lantaiSNI 2010

Kebutuhan Indeks

Bahan

Papan Begesting 0.0400

Paku 5 - 10 cm Kg 0.4000

Satuan

m3

m3

Satuan

m3

m3

Satuan

m3

Page 151: Boq Kosong

BahanMinyak bekisting ltr 0.2000

Balok kayu kelas II 0.0150

Tripleks tebal 9 cm Lbr 0.3500 Bambu Btg 6.0000

Tenaga Kerja

Pekerja OH 0.3200 Tukang batu OH 0.3300 Kepala Tukang OH 0.0330 Mandor OH 0.0060

Jumlah harga per-satuan pekerjaan

11. PD - 6.13SNI 2010

Kebutuhan Indeks

Bahan

Bata Merah 5 x 11 x 22 cm Bh 70.0000 PC Kg 8.3200

Pasir Pasang 0.0490

Tenaga Kerja

Pekerja OH 0.3200 Tukang batu OH 0.1000 Kepala Tukang OH 0.0100 Mandor OH 0.0150

Jumlah harga per-satuan pekerjaan

12. PD - 6.25SNI 2010

Kebutuhan Indeks

Bahan

Terawang (roster ) Bh 25.2000 PC Kg 12.8000

PP 0.0350

Tenaga Kerja

Pekerja OH 0.3000 Tukang batu OH 0.1000 Kepala Tukang OH 0.0100 Mandor OH 0.0150

Jumlah harga per-satuan pekerjaan

13. PPL - 6.17 1 M² Plesteran 1 Pc : 6 Ps, tebal 20 mmSNI 2010

Kebutuhan Indeks

BahanPC Kg 6.2400

PP 0.0300

Tenaga Kerja

Pekerja OH 0.2500 Tukang batu OH 0.2000 Kepala Tukang OH 0.0200 Mandor OH 0.0125

Jumlah harga per-satuan pekerjaan

m3

1 m2 dinding bata merah tebal 1/2 bata 1 PC : 6 PS

Satuan

m3

Pasang 1 m2 dinding terawang (roster) ukuran 20/20 cm

Satuan

M3

Satuan

m3

Page 152: Boq Kosong

14. 6.27SNI-DT-91-

Kebutuhan Indeks0010-2007Hal. 9 dari 11

Bahan PC Kg 3.2500

Tenaga Kerja

Pekerja OH 0.2000 Tukang batu OH 0.1000 Kepala Tukang OH 0.0100 Mandor OH 0.0100

Jumlah harga per-satuan pekerjaan

15. PK - 6.51SNI 2010

Kebutuhan Indeks

Bahan Papan Bayam 0.0145

Paku 5 cm -12 cm Kg 0.0600

Tenaga Kerja

Pekerja OH 0.1000 Tukang kayu OH 0.2000 Kepala Tukang OH 0.0250 Mandor OH 0.0050

Jumlah harga per-satuan pekerjaan

16.

Kebutuhan Indeks

Bahan

Main truss C-60-75 2.4000

Roof bottom/reng A.33-0.45 5.1000

Self Drilling screw Dia 10 x Bh 25.0000 16 x 20 mm (truss screw)Self Drilling screw Dia 12 x Bh 35.0000 14 x 22 mm (roof batten screw)Dynabol dia 10 panjang 8 cm Bh 1.0000

Tenaga Kerja

Pekerja OH 0.2470 Tukang Besi Profil OH 0.1760 Kepala Tukang Besi profil OH 0.1170 genset)Tambahan Upah Ls 0.7450

Alat Bantu Gambar Design 1.0000

Jumlah harga per-satuan pekerjaan

17. PPA - 6.32SNI 2010

Kebutuhan Indeks

Memasang 1 m2 acian

Satuan

1 m1 Pasang lisplang ukuran 2 x (3 x 20), kayu bayam :

Satuan

m3

1 m2 Pekerjaan konstruksi kuda-kuda dari baja ringan galvalum

Satuan

M1

M1

M2

1 m2 Pasang atap genteng metal / multi roof

Satuan

Page 153: Boq Kosong

Kebutuhan Indeks

BahanGenteng metal Bh 1.0200 Paku Sekrup Kg 0.2000

Tenaga Kerja

Pekerja OH 0.2500 Tukang kayu OH 0.1500 Kepala Tukang OH 0.0150 Mandor OH 0.0130

Jumlah harga per-satuan pekerjaan

18. PPA - 6.36SNI 2010

Kebutuhan Indeks

BahanNok genteng Bh 1.1000 Paku Sekrup Kg 0.0500

Tenaga Kerja

Pekerja OH 0.2000 Tukang kayu OH 0.1000 Kepala Tukang OH 0.0100 Mandor OH 0.0100

Jumlah harga per-satuan pekerjaan

19. PK - 6.1SNI 2010

Kebutuhan Indeks

Bahan Balok kayu Bayam 1.1000

Tenaga Kerja

Pekerja OH 7.0000 Tukang kayu OH 21.0000 Kepala Tukang OH 2.1000 Mandor OH 0.3500

20. PK - 6.8SNI 2010

Kebutuhan Indeks

Bahan Papan kayu bayam 0.0400

Tenaga Kerja

Pekerja OH 1.0000 Tukang kayu OH 2.5000 Kepala Tukang OH 0.2500 Mandor OH 0.2500

Jumlah harga per-satuan pekerjaan

21. PK - 6.9 1 M² Pasang pintu dan jendela kaca panel kayu bayam :SNI 2010

Kebutuhan Indeks

Bahan Kayu Bayam, papan 0.0350

Satuan

1 m2 Pasang Nok genteng metal

Satuan

Membuat dan memasang 1 m3 Kusen pintu dan kusen jendela, kayu Bayam

Satuan

m3

1 m2 Pasang pintu panel kayu bayam

Satuan

m3

Satuan

M3

Page 154: Boq Kosong

Bahan Kaca polos 5 mm Kg 0.8000

Tenaga Kerja

Pekerja OH 0.8000 Tukang kayu OH 2.0000 Kepala Tukang OH 0.2000 Mandor OH 0.0400

Jumlah harga per-satuan pekerjaan

22.

Kebutuhan Indeks

BahanHollow Galvalum 4 x 4 cm Btg 1.0000 Sekrup Fixer Bh 9.0000

Tenaga Kerja

Pekerja OH 0.1500 Tukang kayu OH 0.2500 Kepala Tukang OH 0.0250 Mandor OH 0.0750

Jumlah harga per-satuan pekerjaan

23. PLL - 6.24 1 m2 pasang Langit-langit gipsum Tebal 9 mm SNI 2010

Kebutuhan Indeks

BahanGipsum 9 mm Lbr 0.3640 Paku Sekrup Kg 0.1100

Tenaga Kerja

Pekerja OH 0.1000 Tukang kayu OH 0.0500 Kepala Tukang OH 0.0050 Mandor OH 0.0050

Jumlah harga per-satuan pekerjaan

24. PLL - 6.19SNI 2010

Kebutuhan Indeks

BahanList Gibsum M' 1.1000 Paku 1 - 3 cm Kg 0.0100

Tenaga Kerja

Pekerja OH 0.0500 Tukang kayu OH 0.0500 Kepala Tukang OH 0.0050 Mandor OH 0.0030

1 m2 pasang rangka Langit-langit dari hollow galvalum 4 x 4 cm

Satuan

Satuan

Memasang 1 m1 list langit-langit Gipsum lebar 10 cm

Satuan

Page 155: Boq Kosong

Jumlah harga per-satuan pekerjaan

25. AnalisaBOW

Kebutuhan Indeks

BahanBatu kali 0.0700

PC Kg 14.5200 PP 0.0440

Tenaga Kerja

Pekerja OH 0.2000 Tukang batu OH 0.1000 Kepala Tukang OH 0.0100 Mandor OH 0.0100

Jumlah harga per-satuan pekerjaan

26. PKK - 6.2 1 buah pasang kunci tanam SNI 2010

Kebutuhan Indeks

Bahan Kunci tanam Bh 1.0000

Tenaga Kerja

Pekerja OH 0.0100 Tukang kayu OH 0.5000 Kepala Tukang OH 0.0100 Mandor OH 0.0050

Jumlah harga per-satuan pekerjaan

27. PKK - 6.5 1 buah pasang engsel pintuSNI 2010

Kebutuhan Indeks

Bahan Engsel pintu Bh 1.0000

Tenaga Kerja

Pekerja OH 0.0150 Tukang kayu OH 0.1500 Kepala Tukang OH 0.0150 Mandor OH 0.00075

Jumlah harga per-satuan pekerjaan

28. PKK - 6.7 1 buah pasang engsel jendela AnginSNI 2010

Kebutuhan Indeks

Bahan Engsel angin Bh 1.0000

Tenaga Kerja

Pekerja OH 0.0100 Tukang kayu OH 0.1000 Kepala Tukang OH 0.0100 Mandor OH 0.00050

Jumlah harga per-satuan pekerjaan

1 M2 Pas. Lantai tebal 5 cm camp. 1pc : 6psr tebal 6mm camp. 1pc : 3psr diberi semen minyak

Satuan

M3

M3

Satuan

Satuan

Satuan

Page 156: Boq Kosong

29. PS - 6.1 Memasang 1 buah duduk monoblokSNI 2010

Kebutuhan Indeks

BahanKloset Duduk Monoblock (Toto) Bh 1.0000 Perlengkapan Hk 0.0600

Tenaga Kerja

Pekerja OH 3.3000 Tukang Batu OH 1.5000 Kepala Tukang OH 0.1500 Mandor OH 0.1600

Jumlah harga per-satuan pekerjaanCatatan : HK = Harga Kloset

30. PS - 6.19 Memasang 1 M' pipa galvanis Ø 1/2 "SNI 2010

Kebutuhan Indeks

BahanPipa galvanis Ø 1/2" M' 1.2000 Perlengkapan Hp 0.3500

Tenaga Kerja

Pekerja OH 0.0540 Tukang Batu OH 0.0900 Kepala Tukang OH 0.0090 Mandor OH 0.0270

Jumlah harga per-satuan pekerjaanCatatan : HP = Harga Pipa

31. PS - 6.29 Memasang 1 M' pipa PVC Ø 2 "SNI 2010

Kebutuhan Indeks

BahanPipa PVC M' 1.2000 Perlengkapan Hp 0.3500

Tenaga Kerja

Pekerja OH 0.0540 Tukang Batu OH 0.0900 Kepala Tukang OH 0.0090 Mandor OH 0.0027

Jumlah harga per-satuan pekerjaan

32. PS - 6.32 Memasang 1 M' pipa PVC Ø 4 "SNI 2010

Kebutuhan Indeks

BahanPipa PVC M' 1.2000 Perlengkapan Hp 0.3500

Satuan

Satuan

Satuan

Satuan

Page 157: Boq Kosong

Tenaga Kerja

Pekerja OH 0.0810 Tukang Batu OH 0.1350 Kepala Tukang OH 0.0135 Mandor OH 0.0041

Jumlah harga per-satuan pekerjaan

33. PS - 6.35 Memasang 1 buah kran diameter 1/2 "SNI 2010

Kebutuhan Indeks

BahanKran air Bh 1.0000 Seal tape Bh 0.0250

Tenaga Kerja

Pekerja OH 0.0100 Tukang Batu OH 0.1000 Kepala Tukang OH 0.0100 Mandor OH 0.0050

Jumlah harga per-satuan pekerjaan

34. PS - 6.36 Memasang 1buah Floor drainSNI 2010

Kebutuhan Indeks

Bahan Floor drain Bh 1.0000

Tenaga Kerja

Pekerja OH 0.0100 Tukang Batu OH 0.1000 Kepala Tukang OH 0.0100 Mandor OH 0.0050

Jumlah harga per-satuan pekerjaan

35. PC - 6.8SNI 2010

Kebutuhan Indeks

Bahan

Cat Meni kayu Kg 0.2000 Plamir Kg 0.1500 Cat dasar Kg 0.1700 Cat penutup 2 kali/cat Kilap Kg 0.2600

Tenaga Kerja

Pekerja OH 0.0700 Tukang cat OH 0.0900 Kepala Tukang OH 0.0090 Mandor OH 0.0025

Jumlah harga per-satuan pekerjaan

Satuan

Satuan

1 m2 pengecetan bidang kayu baru ( 1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup )

Satuan

Page 158: Boq Kosong

36. PC - 6.11SNI 2010

Kebutuhan Indeks

BahanMinyak Politur Ltr 0.1500 Politur jadi/vernis Ltr 0.3720 Amplas Lbr 2.0000

Tenaga Kerja

Pekerja OH 0.0400 Tukang cat OH 0.0600 Kepala Tukang OH 0.0160 Mandor OH 0.0025

Jumlah harga per-satuan pekerjaan

37. PC - 6.14SNI 2010

Kebutuhan Indeks

BahanPlamir Kg 0.1200 Cat dasar Kg 0.1200 Cat tembok 2 kali Kg 0.2600

Tenaga Kerja

Pekerja OH 0.0400 Tukang cat OH 0.1200 Kepala Tukang OH 0.0120 Mandor OH 0.0020

Jumlah harga per-satuan pekerjaan

38. PPL - 6.13SNI 2010

Kebutuhan Indeks

Bahan

Ubin granit 60 x 60 cm Bh 2.7000 PC Kg 8.1900

Pasir pasang 0.0215

Semen warna Kg 1.3000

Tenaga Kerja

Pekerja OH 0.6200 Tukang batu OH 0.3500 Kepala Tukang OH 0.0350 Mandor OH 0.0300

Jumlah harga per-satuan pekerjaan

39. PPL - 6.13SNI 2010

Kebutuhan Indeks

Bahan

Ubin granit 60 x 60 cm Bh 2.7000 PC Kg 9.3000

Pasir pasang 0.0180

Semen warna Kg 1.5000

1 m2 Peleburan kayu dengan politur

Satuan

1 m2 pengecetan tembok baru / plafond ( 1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup )

Satuan

1 m2 Pasang Lantai Granit uk. 60 x 60 cm

Satuan

M3

1 m2 Pasang Dinding Granit uk. 60 x 60 cm

Satuan

M3

Page 159: Boq Kosong

Tenaga Kerja

Pekerja OH 0.6000 Tukang batu OH 0.4500 Kepala Tukang OH 0.0450 Mandor OH 0.0300

Jumlah harga per-satuan pekerjaan

40. PPL - 6.69SNI 2010

Kebutuhan Indeks

Bahan

Keramik 20 x 25 cm Bh 20.0000 PC Kg 9.3000

Pasir Pasang 0.0180

Semen warna Kg 1.5000

Tenaga Kerja

Pekerja OH 0.6000 Tukang batu OH 0.4500 Kepala Tukang OH 0.0450 Mandor OH 0.0300

Jumlah harga per-satuan pekerjaan

41. PPL 6.28

SNI 2010Kebutuhan Indeks

Bahan

Granito 10 x 60 cm Bh 1.7000 PC Kg 1.6500

Pasir Pasang 0.0032 Semen warna Kg 0.1000

Tenaga Kerja

Pekerja OH 0.9000 Tukang batu OH 0.0900 Kepala Tukang OH 0.0090 Mandor OH 0.0045

Jumlah harga per-satuan pekerjaan

42. PKK - 6.17SNI 2010

Kebutuhan Indeks

Bahan Kaca Polos 5 mm Bh 1.1000

Tenaga Kerja

Pekerja OH 0.0155 Tukang batu OH 0.1550 Kepala Tukang OH 0.0155 Mandor OH 0.00075

Jumlah harga per-satuan pekerjaan

43. PS. 6.5 Memasang 1 Buah WastafelSNI 2010

Kebutuhan Indeks

1 m2 pasang dinding keramik uk. (20 x 25) cm

Satuan

M3

1 m1 Pasang plint Granito ukuran 10 x 60 cm

Satuan

M3

1 m2 Pasang Kaca, tebal 5 mm

Satuan

Satuan

Page 160: Boq Kosong

Bahan

Wastafel Bh 1.0000 Perlengkapan Kg 0.1200

Semen Portland 6.0000 Pasir Pasang Kg 0.0100

Tenaga Kerja

Pekerja OH 1.2000 Tukang batu OH 1.4500 Kepala Tukang OH 0.1500 Mandor OH 0.1000

Jumlah harga per-satuan pekerjaan

44.

Kebutuhan Indeks

BahanPaving Block 10 x 20 cm Bh 50.0000

Pasir Urug 0.1000

Tenaga Kerja

Pekerja OH 0.6200 Tukang batu OH 0.3500 Kepala Tukang OH 0.0350 Mandor OH 0.0300

Jumlah harga per-satuan pekerjaan

45.

Kebutuhan Indeks

Bahan

Galian Tanah 6.1583

Lantai Rabat 0.3000

Pas. Bata 1pc : 6psr 12.0000

Plat Beton Penutup 0.4347

Pembesian Kg 92.4589

Begesting 3.6225

Pipa PVC Ø1" + Sambungan 5.4000

Pipa Gib Ø2" (penguap/hawa) 1.2000

Tambahan Upah Ls 0.7450 Jumlah harga per-satuan pekerjaan

46. PT- 6.7SNI 2010

Kebutuhan Indeks

Tenaga KerjaPekerja OH 0.0500 Mandor OH 0.0050

M3

1 m2 Pasang Paving Block

Satuan

M3

1 Unit Bak Tanam 3 x 1 x 1,5 m ( vol = 4,5 M3 ) Air Bersih

Satuan

M3

M3

M2

M3

M2

M1

M1

1 m2 Pekerjaan stripping setinggi 1 meter

Satuan

Page 161: Boq Kosong

Jumlah harga per-satuan pekerjaan

47.

Kebutuhan Indeks

Bahan Galian Tanah 3.0000

Pasir Urug 0.2000

Lantai Biasa acian semen 2.0000

Pas. Bata 1pc : 6psr 12.0000

Plat Beton Penutup 0.2400

Pembesian 30.8333

Begesting 2.0000

Pipa PVC Ø4" + Sambungan 5.4000

Pipa Gib Ø2" (penguap/hawa) 1.2000

Galian Tanah Peresapan 3.3750

Pas. Ijuk Kg 5.4000

Bahan

Urugan Kerikil 2/3 cm 1.0500

Pipa PVC Ø4" Berlubang 9.0000

Urugan Tanah Perataan 1.1250

Tambahan Upah Ls 0.7450 Jumlah harga per-satuan pekerjaan

Ende, 2016

P E N A W A RPT/CV/Fa. ................................

.........................................J a b a t a n

1 Unit Septictank 2 x 1 x 1,5 m + Peresapan ( vol = 3M3 )

Satuan

M3

M3

M2

M2

M3

M2

M2

M1

M1

M3

M3

M1

M3

Page 162: Boq Kosong

KOP PERUSAHAAN

ANALISA HARGA SATUAN PEKERJAAN

Lanjutan Pembangunan Kantor Perpustakaan dan Arsip Daerah

Harga SatuanJumlahBahan / Upah

(Rp.) (Rp.)

Jumlah harga per-satuan pekerjaan

Harga SatuanJumlahBahan / Upah

(Rp.) (Rp.)

Jumlah harga per-satuan pekerjaan

Harga SatuanJumlahBahan / Upah

(Rp.) (Rp.)

Jumlah harga per-satuan pekerjaan

Harga SatuanJumlahBahan / Upah

(Rp.) (Rp.)

Page 163: Boq Kosong

Jumlah harga per-satuan pekerjaan

Harga SatuanJumlahBahan / Upah

(Rp.) (Rp.)

Jumlah harga per-satuan pekerjaan

Harga SatuanJumlahBahan / Upah

(Rp.) (Rp.)

Jumlah harga per-satuan pekerjaan

Harga SatuanJumlahBahan / Upah

(Rp.) (Rp.)

Page 164: Boq Kosong

Jumlah harga per-satuan pekerjaan

Harga SatuanJumlahBahan / Upah

(Rp.) (Rp.)

Jumlah harga per-satuan pekerjaan

Harga SatuanJumlahBahan / Upah

(Rp.) (Rp.)

Jumlah harga per-satuan pekerjaan

Harga SatuanJumlahBahan / Upah

(Rp.) (Rp.)

Page 165: Boq Kosong

Jumlah harga per-satuan pekerjaan

Harga SatuanJumlahBahan / Upah

(Rp.) (Rp.)

Jumlah harga per-satuan pekerjaan

Harga SatuanJumlahBahan / Upah

(Rp.) (Rp.)

Jumlah harga per-satuan pekerjaan

Harga SatuanJumlahBahan / Upah

(Rp.) (Rp.)

Jumlah harga per-satuan pekerjaan

Page 166: Boq Kosong

Harga SatuanJumlahBahan / Upah

(Rp.) (Rp.) - - - - - - - - - -

Jumlah harga per-satuan pekerjaan -

Harga SatuanJumlahBahan / Upah

(Rp.) (Rp.)

- - - - - - - - - - - -

Jumlah harga per-satuan pekerjaan -

Harga SatuanJumlahBahan / Upah

(Rp.) (Rp.)

- -

- - - -

- -

- - - - - - - -

- -

- - Jumlah harga per-satuan pekerjaan -

Harga SatuanJumlah

Page 167: Boq Kosong

Bahan / Upah Jumlah(Rp.) (Rp.)

- - - - - - - - - - - -

Jumlah harga per-satuan pekerjaan -

Harga SatuanJumlahBahan / Upah

(Rp.) (Rp.) - - - - - - - - - - - -

Jumlah harga per-satuan pekerjaan -

Harga SatuanJumlahBahan / Upah

(Rp.) (Rp.) - - - - - - - - - -

Jumlah -

Harga SatuanJumlahBahan / Upah

(Rp.) (Rp.)

- - - - - - - - - -

Jumlah harga per-satuan pekerjaan -

Harga SatuanJumlahBahan / Upah

(Rp.) (Rp.)

- -

Membuat dan memasang 1 m3 Kusen pintu dan kusen jendela, kayu Bayam

Page 168: Boq Kosong

- - - - - - - - - -

Jumlah harga per-satuan pekerjaan -

Harga SatuanJumlahBahan / Upah

(Rp.) (Rp.) - - - - - - - - - - - -

Jumlah harga per-satuan pekerjaan -

Harga SatuanJumlahBahan / Upah

(Rp.) (Rp.) - - - - - - - - - - - -

Jumlah harga per-satuan pekerjaan -

Harga SatuanJumlahBahan / Upah

(Rp.) (Rp.)

- - - - - - - - - -

Page 169: Boq Kosong

Jumlah harga per-satuan pekerjaan -

Harga SatuanJumlahBahan / Upah

(Rp.) (Rp.)

- - - - - - - - - - - - - -

Jumlah harga per-satuan pekerjaan -

Harga SatuanJumlahBahan / Upah

(Rp.) (Rp.) - - - - - - - - - -

Jumlah harga per-satuan pekerjaan -

Harga SatuanJumlahBahan / Upah

(Rp.) (Rp.) - - - - - - - - - -

Jumlah harga per-satuan pekerjaan -

Harga SatuanJumlahBahan / Upah

(Rp.) (Rp.) - - - - - - - - - -

Jumlah harga per-satuan pekerjaan -

Pas. Lantai tebal 5 cm camp. 1pc : 6psr tebal 6mm camp. 1pc : 3psr diberi semen minyak

Page 170: Boq Kosong

Harga SatuanJumlahBahan / Upah

(Rp.) (Rp.) - - - - - - - - - - - -

Jumlah harga per-satuan pekerjaan -

Harga SatuanJumlahBahan / Upah

(Rp.) (Rp.) - - - - - - - - - - - -

Jumlah harga per-satuan pekerjaan -

Harga SatuanJumlahBahan / Upah

(Rp.) (Rp.) - - - - - - - - - - - -

Jumlah harga per-satuan pekerjaan -

Harga SatuanJumlahBahan / Upah

(Rp.) (Rp.) - - - -

Page 171: Boq Kosong

- - - - - - - -

Jumlah harga per-satuan pekerjaan -

Harga SatuanJumlahBahan / Upah

(Rp.) (Rp.)

- - - - - - - - - -

Jumlah harga per-satuan pekerjaan -

Harga SatuanJumlahBahan / Upah

(Rp.) (Rp.) - - - - - - - - - -

Jumlah harga per-satuan pekerjaan -

Harga SatuanJumlahBahan / Upah

(Rp.) (Rp.) - - - - - - - - - - - - - - - -

Jumlah harga per-satuan pekerjaan -

pengecetan bidang kayu baru ( 1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup )

Page 172: Boq Kosong

Harga SatuanJumlahBahan / Upah

(Rp.) (Rp.) - - - - - - - - - - - - - -

Jumlah harga per-satuan pekerjaan -

Harga SatuanJumlahBahan / Upah

(Rp.) (Rp.) - - - - - - - - - - - - - -

Jumlah harga per-satuan pekerjaan -

Harga SatuanJumlahBahan / Upah

(Rp.) (Rp.) - - - -

- - - - - - - - - - - -

Jumlah harga per-satuan pekerjaan -

Harga SatuanJumlahBahan / Upah

(Rp.) (Rp.) - - - -

- - - -

pengecetan tembok baru / plafond ( 1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup )

Page 173: Boq Kosong

- - - - - - - -

Jumlah harga per-satuan pekerjaan -

Harga SatuanJumlahBahan / Upah

(Rp.) (Rp.) - - - -

- - - - - - - - - - - -

Jumlah harga per-satuan pekerjaan -

Harga Satuan

JumlahBahan / Upah(Rp.) (Rp.)

- - - -

- - - - - - - - - - - -

Jumlah harga per-satuan pekerjaan -

Harga SatuanJumlahBahan / Upah

(Rp.) (Rp.) - - - - - - - - - -

Jumlah harga per-satuan pekerjaan -

Harga SatuanJumlahBahan / Upah

(Rp.) (Rp.)

Page 174: Boq Kosong

- - - -

- - - -

- - - - - - - -

Jumlah harga per-satuan pekerjaan -

Harga SatuanJumlahBahan / Upah

(Rp.) (Rp.) - -

- - - - - - - - - -

Jumlah harga per-satuan pekerjaan -

Harga SatuanJumlahBahan / Upah

(Rp.) (Rp.)

- -

- -

- -

- - - -

- -

- -

- -

Jumlah harga per-satuan pekerjaan -

Harga SatuanJumlahBahan / Upah

(Rp.) (Rp.) - - - -

Page 175: Boq Kosong

Jumlah harga per-satuan pekerjaan -

Harga SatuanJumlahBahan / Upah

(Rp.) (Rp.)

- -

- -

- -

- -

- -

- -

- -

- -

- -

- - - -

- -

- -

- -

Jumlah harga per-satuan pekerjaan -

Ende, 2016

P E N A W A RPT/CV/Fa. ................................

.........................................J a b a t a n

Page 176: Boq Kosong

KOP PERUSAHAAN

DAFTAR HARGA SATUAN UPAH DAN BAHAN

PROGRAM : Peningkatan Sarana dan Prasarana Aparatur

KEGIATAN : Pembangunan Gedung Kantor

PEKERJAAN : Lanjutan Pembangunan Kantor Perpustakaan dan Arsip Daerah

LOKASI : Jl. Diponegoro - Kel. Onekore - Kec. Ende Tengah

TAHUN ANGGARAN : 2015

No Uraian Harga Satuan Satuan

UPAH KERJA

1 Pekerja O/H2 Tukang Batu / Kayu / Besi / Cat O/H3 Kepala Tukang Batu / Kayu / Besi / Cat O/H4 Mandor O/H

BAHAN

1 Tanah Urug M32 Pasir Urug (PU) M33 Pasir Pasang (PP) / Pasir Beton (PB) M34 Koral Beton 2/3 M35 Koral Beton 2/3 M36 Batu Kali/belah/gunung M37 Bata merah Bh8 Batu Roster 30/ 30 cm Bh9 Batako 40/20/10 cm Bh

10 Tanah Urug M311 List kayu profil, lebar 6 cm M'12 List kaca M'13 Kayu Hutan Kelas II ( balok ) Batu M314 Kayu Hutan Kelas II ( papan ) Batu M315 Kayu bayam (balok) M316 Kayu Bayam (Papan) M317 Balok Kelapa M318 Usuk Kayu Kls II (kaso-kaso 5/7 cm) M319 Papan Bekesting (Kelas III) M320 Bambu Btg21 Ijuk Kg22 Portland Cement (PC) @ 40 Kg Tiga Roda Zak23 Portland Cement (PC) @ 40 Kg Tiga Roda Kg24 Semen Warna @ 40 Kg Tiga Roda Zak25 Semen Warna @ 40 Kg Tiga Roda Kg26 Kawat Beton Kg27 Kaca Polos 5 mm M2

Page 177: Boq Kosong

28 Seng gelombang hijau Bjls. 0,20 mm (fabrikasi) Lbr29 Seng plat Bjls 0,30 - 40 cm Lbr30 Paku biasa 1-3 cm Kg31 Paku biasa 5-12 cm Kg32 Paku seng Kg33 Pipa PVC Ø 1" M134 Pipa PVC Ø 2" M135 Pipa PVC Ø 4" M136 Pipa galvanis medium A Ø 1/2" M137 Kran Air Ø 1/2" Bh38 seal tape Bh39 Pipa hawa Ø 2" (jadi) Unit40 Gipsum Board Lbr41 Tripleks 9 mm Lbr

No Uraian Harga Satuan Satuan

42 Politur Jadi/Vernis Ltr43 Amplas Lbr44 Teakwood 3 mm Lbr45 Tripleks aluminium uk. Pintu 3mm Lbr46 Cat tembok / Cat penutup Kg47 Plamur tembok Kg48 Cat Kilat / Cat penutup Kg49 Cat Menie seng / Meni besi Kg50 Cat Menie Kayu Kg51 Cat dasar Kg52 Lem kayu Ltr53 Kuas Cat Bh54 Minyak Politur Kg55 Minyak cat Kg56 Kawat Harmonika uk. Lubang 5 cm M257 Besi beton / baja tulangan Kg58 Minyak Bekisting / Residu Ltr59 Engsel Jendela angin Bh60 Engsel Pintu Kualitas baik Bh61 Grendel Jendela Bh62 Plamur kayu / dempul jadi Kg63 Kunci Tanam Pintu Uk. Besar 2 x Putar (baik) bh64 Kait angin Bh65 Grendel Pintu Panjang Bh66 Kloset duduk mono block ( setara Toto ) Bh67 Flour drain (Stainlees Steel) Bh68 Besi Beugel/Mourbaut /besi streep (pengikat kuda-kuda) Kg69 Pipa Penguras PVC Ø 3/4" (biru) Bh70 Instalasi Listrik ( Meteran Baru ) Daya 2200 KV Unit

Page 178: Boq Kosong

71 Titik Lampu + Instalasi Listrik dalam bangunan Titik72 Lampu pijar 40 Watt Bh73 Lampu Philips LED 7 watt Bh74 Lampu TL 40 Watt (complit) Bh75 Saklar Tunggal Bh76 Saklar Ganda Bh77 Pas. Kabel Listrik NYA 3 x 2,5 mm (50 m) Roll78 Stop Kontak Bh79 Sekring MCB 2 Group Bh80 Tralis pengaman jendela Lis besi strip M281 Pemasangan Meteran PDAM Ls82 M2

83 Profil Tank Stainles steel 1100 ltr Bh84 Dinamo air daya isap 20 m Bh85 Glass Block 20/20 cm Bh86 Granit 60 x 60 cm Doz

Granit 60 x 60 cm Bh87 Plint Granit 60 x 10 cm Doz

Plint Granit 60 x 10 cm Bh88 Keramik 20 cm x 25 cm Bh89 Batu Roster 20/20 cm Bh90 Genteng Metal ( Multi Roof ) 0,25 mm Bh91 Nok Genteng (Multiroof) 0,25 mm Bh92 Hollow Galvalum 4 x 4 cm Btg93 Hollow Galvalum 4 x 4 cm Btg94 Sekrup Fixer Bh95 Paku Sekrup Kg96 Paving Block uk. 10/20 cm Bh97 Pipa Gib untuk Penguap/Hawa + accesories M198 Penangkal Petir Unit

No Uraian Harga Satuan Satuan

99 Wastafel Bh100 Pembuatan garasi rangka Baja/Besi Hollow M2101 Main truss C-60-75 M1102 Roof bottom/reng A.33-0.45 M1103 Self Drilling screw Dia 10 x 16 x 20 mm (truss screw) Bh104 Self Drilling screw Dia 12 x 14 x 22 mm (roof batten screw) Bh105 Dynabol dia 10 panjang 8 cm Bh106 Gambar Design M2107 Kalsiplank 0,08/20 cm M1108 Kabel Tray U (300x50x2400x1,2 mm) Buah109 Tutup kabel Tray (300x50x2400x1,2 mm) Buah110 Tee Kabel Tray U (300x300x50x1,2 mm) Buah

Pemasangan Reling Pagar & Tangga (Besi Hollow Stainlees Steel) Uk. 4/4 dan 2/4 cm

Page 179: Boq Kosong

111 Cross Kabel Tray (300x300x100x1,2 mm) Buah112 Hanger/Penyangga Kabel Tray (300x1,2 mm) Buah

Ende, 2016

P E N A W A RPT/CV/Fa. ................................

.........................................J a b a t a n

Page 180: Boq Kosong

KOP PERUSAHAAN

DAFTAR HARGA SATUAN UPAH DAN BAHAN

Keterangan

5 Jam Kerja / Hari

harga dilokasi pekerjaan sudah termasuk semua

jenis pajak kecuali PPn 10%

Page 181: Boq Kosong

Keterangan

Page 182: Boq Kosong

Keterangan

Page 183: Boq Kosong

Ende, 2016

P E N A W A RPT/CV/Fa. ................................

.........................................J a b a t a n

Page 184: Boq Kosong

DAFTAR HARGA BAHAN BANGUNANDALAM WILAYAH KAB. ENDE TA. 2010

TOKO …………………………….

No. Jenis Barang Satuan Harga StandarSatuan Jual

File X -02-D-AM-K9 BCK 2010 jdh

Page 185: Boq Kosong

DAFTAR HARGA BAHAN BANGUNANDALAM WILAYAH KAB. ENDE TA. 2010

Keterangan

Page 186: Boq Kosong

UPAH TENAGA KERJA DAN HARGA SATUAN MATERIAL/BAHAN

Propinsi : Nusa Tenggra Timur Kabupaten : Ende Bulan :

KO UPAHNO TENAGA KERJA DE TENAGA KERJA NO TENAGA KERJA

(Rp./HARI)1 Mandor L.061 22,500.00 8 Pembantu Operator2 Mekanik L.071 22,500.00 9 Supir Truck3 Mekanik Pembantu L.072 20,000.00 10 Supir Personil4 Kepala Tukang L.073 22,500.00 11 Pembantu Supir5 Tukang L.079 20,000.00 12 Buruh Lap. tak terlatih6 Operator Terlatih L.081 20,000.00 13 Buruh Lap. kurang terlatih7 Operator kurang Terlatih L.082 17,500.00 14 Buruh Lapangan terlatih

HARGA JARAK JUMLAH PAJAKKO DI QUARRY/ ANGKUT ONGKOS HARGA GALIAN

NO MATERIAL UNIT DE SUMBER AN ANGKUT TANPA GOL. C(TANPA PAJAK) RATA ² PER UNIT PAJAK

(Rp) (KM) (Rp) (Rp) (Rp)

1 m³ M.010 30,000.00 8.00 #REF! #REF! 6,000.00 2 Kerikil dari Galian Bukit m³ M.011 22,500.00 8.00 #VALUE! 4,500.00 3 kerikil Sungai (Tdk disaring) m³ K.012 10,000.00 8.00 #REF! #REF!4 kerikil Sungai tersaring m³ K.016 #REF! 9.00 #VALUE!5 Batu Kali m³ M.013 30,000.00 8.00 #REF! #REF! 6,000.00 6 Kerikil Pecah disaring m³ K.017 #REF! 6.00 #REF! #REF!7 Batu belah 10 - 15 cm m³ M.020 30,000.00 8.00 #REF! #REF! 6,000.00 8 Batu Belah 7 - 10 cm m³ M.021 36,000.00 8.00 #VALUE! 7,200.00 9 Batu Pecah 5 - 7 cm m³ M.022 43,200.00 8.00 #VALUE! 8,640.00

10 Batu Pecah 3 - 5 cm m³ M.023 #REF! 8.00 #REF! #REF!11 Batu Pecah 2 - 3 cm m³ M.024 #REF! 8.00 #VALUE!12 Batu Pecah 1 - 2 cm m³ M.025 #REF! 8.00 #VALUE!13 Batu Pecah 0,5 - 1 cm m³ M.026 #REF! 8.00 #VALUE!14 Filler m³ M. 8.00 #VALUE!15 Gorong2 armco d = 60 cm m M.031 750,000.00 20.00 #REF! #REF!16 Gorong2 armco d = 80 cm m M.033 950,000.00 20.00 #REF! #REF!17 Gorong2 armco d = 100 cm m M.035 1,300,000.00 20.00 #VALUE!18 Tanah Urug/Timbun biasa m³ M.040 4,000.00 2.00 #REF! #REF! 800.00 19 Pasir ayak untuk beton m³ M.041 20,000.00 6.00 #VALUE! 4,000.00 20 Sirtu (tak diayak) m³ M.042 10,000.00 5.00 #REF! #REF! 2,000.00 21 Bahan Timbunan pilihan m³ M.050 7,500.00 5.00 #VALUE! 1,500.00 22 Aspal Bitumen kg M.061 3,700.00 20.00 #REF! #REF!23 Aspal Buton Tonne M.062 450,000.00 20.00 #REF! #REF!24 Minyak Flux Ltr M.063 2,200.00 20.00 #REF! #REF!25 Minyak Tanah Ltr M.065 600.00 20.00 #VALUE!26 Kayu Bakar m³ M.070 20,000.00 10.00 #REF! #REF!27 Semen PC 50/kg M.080 26,500.00 20.00 #REF! #REF!28 Kapur Bakar m³ M.081 105,000.00 15.00 #REF! #REF! 21,000.00 29 Batu Kapur m³ M.082 95,000.00 15.00 #VALUE! 19,000.00 30 Cat Jembatan kg M.090 12,500.00 20.00 #REF! #REF!31 Baja Tralls kg M.161 4,000.00 20.00 #REF! #REF!32 Kawat Bronjong kg M.162 3,500.00 20.00 #REF! #REF!33 Baut Baja kg M.163 7,500.00 20.00 #REF! #REF!34 Paku Jembatan kg M.166 4,500.00 20.00 #REF! #REF!35 Baja Tulangan Beton kg M.167 5,000.00 20.00 #REF! #REF!36 Alat-alat Bantu )** Set M.170 27,500.00 20.00 #REF! #REF!37 Kayu untuk Perancah m³ M.180 650,000.00 20.00 #REF! #REF!38 Kayu untuk Konstruksi Jbt. m³ M.181 1,500,000.00 20.00 #REF! #REF!39 Minyak Diesel/Solar Ltr M.183 1,400.00 20.00 #REF! #REF!40 Bensin/Premlum Ltr M.184 1,750.00 20.00 #VALUE!41 Minyak Pelumas Ltr M.185 17,500.00 20.00 42 Bronjong Macafery Unit 175,000.00 20.00 #REF!

LOKASI : ** = 1 Cangkul + 1 Skop + 1 Pikulan *** Upah tenaga kerja sudah termasuk Pajak dan Fee Over head

Diperiksa : Disiapkan oleh :Kepala Dinas Permukiman dan Prasarana Wilayah Kasubdin Sarana dan Prasarana Jalan

Kabupaten Ende, Dinas Kimpraswil Kabupaten Ende,

Page 187: Boq Kosong

MENDJATI NICOLAUS, BIE. MIKAEL PADI, STNIP : 110016542 NIP : 620014911

Mengetahui :Bupati Ende,

PAULINUS DOMI

Page 188: Boq Kosong

UPAH TENAGA KERJA DAN HARGA SATUAN MATERIAL/BAHAN K.9PEBRUARI 2002

UPAH TENA-KODE GA KERJA

(Rp.P/HARI)L.089 14,500.00 L.091 17,500.00 L.092 17,500.00 L.099 14,500.00 L.101 14,500.00 L.103 16,000.00 L.106 17,500.00

FEE dan PAJAK JUMLAH JUMLAHOVER (PPn) HARGA HARGA HEAD TANPA TERMASUK

PPN+FEE PAJAK(Rp) (Rp) (Rp) (Rp)

#REF! #REF! #REF! #REF!#VALUE! #VALUE! #VALUE! #VALUE!

#REF! #REF! #REF! #REF!#VALUE! #VALUE! #VALUE! #VALUE!

#REF! #REF! #REF! #REF!#REF! #REF! #REF! #REF!#REF! #REF! #REF! #REF!

#VALUE! #VALUE! #VALUE! #VALUE!#VALUE! #VALUE! #VALUE! #VALUE!

#REF! #REF! #REF! #REF!#VALUE! #VALUE! #VALUE! #VALUE!#VALUE! #VALUE! #VALUE! #VALUE!#VALUE! #VALUE! #VALUE! #VALUE!#VALUE! #VALUE! #VALUE! #VALUE!

#REF! #REF! #REF! #REF!#REF! #REF! #REF! #REF!

#VALUE! #VALUE! #VALUE! #VALUE!#REF! #REF! #REF! #REF!

#VALUE! #VALUE! #VALUE! #VALUE!#REF! #REF! #REF! #REF!

#VALUE! #VALUE! #VALUE! #VALUE!#REF! #REF! #REF! #REF!#REF! #REF! #REF! #REF!#REF! #REF! #REF! #REF!

#VALUE! #VALUE! #VALUE! #VALUE!#REF! #REF! #REF! #REF!#REF! #REF! #REF! #REF!#REF! #REF! #REF! #REF!

#VALUE! #VALUE! #VALUE! #VALUE!#REF! #REF! #REF! #REF!#REF! #REF! #REF! #REF!#REF! #REF! #REF! #REF!#REF! #REF! #REF! #REF!#REF! #REF! #REF! #REF!#REF! #REF! #REF! #REF!#REF! #REF! #REF! #REF!#REF! #REF! #REF! #REF!#REF! #REF! #REF! #REF!#REF! #REF! #REF! #REF!

#VALUE! #VALUE! #VALUE! #VALUE!#VALUE! #VALUE! #VALUE! #VALUE!

#VALUE! #VALUE! #VALUE!

*** Upah tenaga kerja sudah termasuk Pajak dan Fee Over head

Disiapkan oleh :Kasubdin Sarana dan Prasarana Jalan

Dinas Kimpraswil Kabupaten Ende,

Page 189: Boq Kosong

MIKAEL PADI, STNIP : 620014911

Mengetahui :Bupati Ende,

PAULINUS DOMI

Page 190: Boq Kosong

DAFTAR HARGA BAHAN BANGUNANTahun Angaran 2010

TOKO ………………………….

HARGA JARAK

No. U R A I A N KODE SATUAN STANDAR/DASAR QUARRY

(Rp) ( Km )

1 2 3 4 5

I BAHAN BANGUNAN NON LOKAL

1 Semen abu-abu @ 50 kg Zak2 Semen abu-abu @ 40 kg Zak3 Semen putih @ 50 kg Zak4 Semen putih @ 40 kg Zak5 Semen Tonasa @ 50 kg Zak6 Semen Tonasa @ 40 kg Zak7 Semen Kupang @ 40 kg Zak8 Semen Gresik @ 50 kg Zak9 Semen Gresik @ 40 kg Zak

10 Semen Bosowa @ 50 kg Zak11 Besi beton polos 5 mm panjang 12 m' Batang12 Besi beton polos 6 mm panjang 12 m' Batang13 Besi beton polos 8 mm panjang 12 m' Batang14 Besi beton polos 10 mm panjang 12 m' Batang15 Besi beton polos 12 mm panjang 12 m' Batang16 Besi beton polos 14 mm panjang 12 m' Batang17 Besi beton polos 16 mm panjang 12 m' Batang18 Kawat beton / bendral Kg19 Seng gelombang Bjls uk. 0,30 Lembar20 Seng gelombang Bjls uk. 0,20 Lembar21 Nok seng Bjls 0,20 - 30 cm Lembar22 Nok seng Bjls 0,30 Lembar23 Seng plat Bjls 0,20 Lembar24 Seng plat Bjls 0,20 - 40 cm Lembar25 Paku biasa 1-3 cm Kg26 Paku biasa 5-12 cm Kg27 Paku beton 1-3 cm Kg28 Paku beton 5-15 cm Kg29 Paku kayu 1-3 cm Kg30 Paku kayu 5-7 cm Kg31 Paku kayu 7-15 cm Kg32 Paku seng Kg33 Paku asbes Kg34 Pipa PVC dia 1/2 " Batang35 Pipa PVC dia 3/4 " Batang36 Pipa PVC dia 1 " Batang37 Pipa PVC dia 2 " Batang38 Pipa PVC dia 3 " Batang39 Pipa PVC dia 4 " Batang40 Pipa GIP Medium A dia 2,5 " Batang41 Pipa GIP Medium A dia 2 " Batang42 Pipa GIP Medium A dia 1" Batang43 Pipa GIP Medium A dia 3/4 " Batang44 Pipa GIP Medium A dia 1/2 " Batang45 Pipa GIP Medium B dia 2,5 " Batang46 Pipa GIP Medium B dia 2 " Batang47 Pipa GIP Medium B dia 1 " Batang48 Pipa GIP Medium B dia 3/4 " Batang49 Pipa GIP Medium B dia 1/2 " Batang50 Buis beton 20 f cm Buah51 Buis beton 10 f cm Buah52 Water muur GIP dia 4 " Buah53 Water muur GIP dia 3 " Buah54 Water muur GIP dia 2 " Buah55 Water muur GIP dia 1,5 " Buah56 Water muur GIP dia 1 " Buah57 Water muur GIP dia 3/4 " Buah58 Water muur GIP dia 1/2 " Buah59 Shocet PVC dia 6 " Buah

Page 191: Boq Kosong

60 Shocet PVC dia 4 " BuahFile X-02-D-AM-K9 BCK 2010 jdh

Page 192: Boq Kosong

1 2 3 4 5

61 Shocet PVC dia 3 " Buah62 Shocet PVC dia 2,5 " Buah63 Shocet PVC dia 2 " Buah64 Shocet PVC dia 1,5 " Buah65 Shocet PVC dia 1 " Buah66 Shocet PVC dia 3/4 " Buah67 Shocet PVC dia 1/2 " Buah68 Shocet GIP dia 4 " Buah69 Shocet GIP dia 3 " Buah70 Shocet GIP dia 2 " Buah71 Shocet GIP dia 1,5 " Buah72 Shocet GIP dia 1 1/4 " Buah73 Shocet GIP dia 1 " Buah74 Shocet GIP dia 3/4 " Buah75 Shocet GIP dia 1/2 " Buah76 Shok Nepel dia 1/2 " Buah77 Shok Nepel dia 3/4 " Buah78 Nepel GIP dia 4 " Buah79 Nepel GIP dia 3 " Buah80 Nepel GIP dia 2 " Buah81 Nepel GIP dia 1,5 " Buah82 Nepel GIP dia 1 " Buah83 Nepel GIP dia 3/4 " Buah84 Nepel GIP dia 1/2 " Buah85 Lem PVC Kg86 Klem sadle GIP dia 2 " x 0,5 " Buah87 Knee GIP dia 4 " Buah88 Knee GIP dia 3 " Buah89 Knee GIP dia 2 " Buah90 Knee GIP dia 1,5 " Buah91 Knee GIP dia 1 " Buah92 Knee GIP dia 3/4 " Buah93 Knee GIP dia 1/2 " Buah94 Elbow GIP dia 4 " Buah95 Elbow GIP dia 3 " Buah96 Elbow GIP dia 2 " Buah97 Elbow GIP dia 1,5 " Buah98 Elbow GIP dia 1 " Buah99 Elbow GIP dia 3/4 " Buah

100 Elbow GIP dia 1/2 " Buah101 Stop kran GIP dia 4 " Buah102 Stop kran GIP dia 3 " Buah103 Stop kran GIP dia 2 " Buah104 Stop kran GIP dia 1,5 " Buah105 Stop kran GIP dia 1 " Buah106 Stop kran GIP dia 3/4" Buah107 Stop kran GIP dia 1/2 " Buah108 Dop GIP dia 3 " Buah109 Dop GIP dia 2 " Buah110 Dop GIP dia 1,5 " Buah111 Dop GIP dia 1 " Buah112 Dop GIP dia 3/4 " Buah113 Dop GIP dia 1/2 " Buah114 Kran GIP dia 1 " Buah115 Kran GIP dia 3/4 " Buah116 Kran GIP dia 1/2 " Buah117 Tee GIP dia 4" x 4" Buah118 Tee GIP dia 4" x 3" Buah119 Tee GIP dia 4" x 2" Buah120 Tee GIP dia 4" x 1,5" Buah121 Tee GIP dia 4" x 1" Buah122 Tee GIP dia 4" x 3/4" Buah123 Tee GIP dia 4" x 1/2" Buah124 Tee GIP dia 3" x 3" Buah125 Tee GIP dia 3" x 2" Buah126 Tee GIP dia 3" x 1,5" Buah127 Tee GIP dia 3" x 1" Buah128 Tee GIP dia 3" x 3/4" Buah129 Tee GIP dia 3" x 1/2" Buah

Page 193: Boq Kosong

130 Tee GIP dia 2" x 2" Buah131 Tee GIP dia 2" x 1,5" Buah132 Tee GIP dia 2" x 1" Buah133 Tee GIP dia 2" x 3/4" Buah

File X-02-D-AM-K9 BCK 2010 jdh

Page 194: Boq Kosong

1 2 3 4 5

134 Tee GIP dia 2" x 1/2" Buah135 Tee GIP dia 1,5" x 1,5" Buah136 Tee GIP dia 1,5" x 1" Buah137 Tee GIP dia 1,5" x 3/4" Buah138 Tee GIP dia 1,5" x 1/2" Buah139 Tee GIP dia 1" x 1" Buah140 Tee GIP dia 1" x 3/4" Buah141 Tee GIP dia 1" x 1/2" Buah142 Tee GIP dia 3/4" x 3/4" Buah143 Tee GIP dia 3/4" x 1/2" Buah144 Tee GIP dia 1/2" x 1/2" Buah145 Reducer GIP / over chok dia 4" x 3" Buah146 Reducer GIP / over chok dia 4" x 2" Buah147 Reducer GIP / over chok dia 4" x 1,5" Buah148 Reducer GIP / over chok dia 4" x 1" Buah149 Reducer GIP / over chok dia 4" x 3/4" Buah150 Reducer GIP / over chok dia 4" x 1/2" Buah151 Reducer GIP / over chok dia 3" x 2" Buah152 Reducer GIP / over chok dia 3" x 1,5" Buah153 Reducer GIP / over chok dia 3" x 1" Buah154 Reducer GIP / over chok dia 3" x 3/4" Buah155 Reducer GIP / over chok dia 3" x 1/2" Buah156 Reducer GIP / over chok dia 2" x 1,5" Buah157 Reducer GIP / over chok dia 2" x 1" Buah158 Reducer GIP / over chok dia 2" x 3/4" Buah159 Reducer GIP / over chok dia 2" x 1/2" Buah160 Reducer GIP / over chok dia 1,5" x 1" Buah161 Reducer GIP / over chok dia 1,5" x 3/4" Buah162 Reducer GIP / over chok dia 1,5" x 1/2" Buah163 Reducer GIP / over chok dia 1" x 3/4" Buah164 Reducer GIP / over chok dia 1" x 1/2" Buah165 Reducer GIP / over chok dia 3/4" x 1/2" Buah166 Klem sadle GIP dia 4" x 2" Buah167 Klem sadle GIP dia 4" x 1" Buah168 Klem sadle GIP dia 4" x 3/4" Buah169 Klem sadle GIP dia 4" x 1/2" Buah170 Tripleks 3 mm Lembar171 Tripleks 4 mm Lembar172 Tripleks 6 mm Lembar173 Tripleks 9 mm Lembar174 Seng baja deck polos BD. 0,20 Lembar175 Seng baja deck polos BD. 0,30 Lembar176 Seng baja deck polos berwarna BD. 0,20 Lembar177 Seng baja deck polos berwarna BD. 0,30 Lembar178 Seng nok baja deck L 45 polos BD. 0,20 M'179 Seng nok baja deck L 45 polos BD. 0,30 M'180 Seng Leisplang berwarna BD. 0,30 M'181 Seng Leisplang berwarna BD. 0,20 M'182 Teakwood Lembar183 Minyak tanah Liter184 Minyak diesel / solar Liter185 Minyak bensin / premium Liter186 Minyak pelumas Liter187 Besi beton ulir Kg188 Baja tulangan ulir Kg189 Kawat baja Kg190 Baut baja Kg191 Paku jembatan Kg192 Baja tulangan polos Kg193 Kawat bronjong wonosari Unit194 Kawat bronjong jangkar Unit195 Kawat bronjong bofananda Unit196 Besi beugel / baut ( pengikat kuda-kuda ) Buah

File X-02-D-AM-K9 BCK 2010 jdh

Page 195: Boq Kosong

DAFTAR HARGA BAHAN BANGUNANTahun Angaran 2010

KET.

6

Page 196: Boq Kosong
Page 197: Boq Kosong

Hal. 2.6

Page 198: Boq Kosong
Page 199: Boq Kosong

Hal. 3.6

Page 200: Boq Kosong

DAFTAR HARGA BAHAN BANGUNANTahun Angaran 2012

TOKO ………………………….

HARGA JARAK

No. U R A I A N KODE SATUAN STANDAR/DASAR QUARRY

(Rp) ( Km )

1 2 3 4 5

I BAHAN BANGUNAN NON LOKAL

1 Gorong-gorong armco d = 60 cm M2 Gorong-gorong armco d = 80 cm M3 Gorong-gorong armco d = 100 cm M4 Bahan Timbunan pilihan M35 Semen abu-abu @ 50 kg Zak6 Semen abu-abu @ 40 kg Zak7 Semen putih @ 50 kg Zak8 Semen putih @ 40 kg Zak9 Semen Tonasa @ 50 kg Zak

10 Semen Tonasa @ 40 kg Zak11 Semen Kupang @ 40 kg Zak12 Semen Gresik @ 50 kg Zak13 Semen Gresik @ 40 kg Zak14 Semen Bosowa @ 50 kg Zak15 Besi beton polos 5 mm panjang 12 m' Batang16 Besi beton polos 6 mm panjang 12 m' Batang17 Besi beton polos 8 mm panjang 12 m' Batang18 Besi beton polos 10 mm panjang 12 m' Batang19 Besi beton polos 12 mm panjang 12 m' Batang20 Besi beton polos 14 mm panjang 12 m' Batang21 Besi beton polos 16 mm panjang 12 m' Batang22 Kawat beton / bendral Kg23 Porselint uk. 11 cm x 11 cm Doz24 Porselint uk. 10 cm x 15 cm Doz25 Porselint uk. 15 cm x 15 cm Doz26 Porselint uk. 20 cm x 20 cm Doz27 Porselint uk. 30 cm x 30 cm Doz28 Plint keramik uk. 30 cm x 10 cm Doz29 Keramik 20 cm x 20 cm Doz30 Keramik 20 cm x 25 cm Doz31 Ubin abu-abu 15 cm x 20 cm Doz32 Plint ubin berwarna 15 cm x 20 cm Doz33 Ubin wafel abu-abu 20 cm x 20 cm Buah34 Ubin wafel berwarna 20 cm x 20 cm Doz35 Kaca bening 3 mm M236 Kaca bening 5 mm M237 Kaca reyben 3 mm M238 Kaca reyben 5 mm M239 Genteng (setara genteng kodok ) Buah40 Karpus genteng (setara genteng kodok ) Buah41 Seng gelombang Bjls uk. 0,30 Lembar42 Seng gelombang Bjls uk. 0,20 Lembar43 Nok seng Bjls 0,20 - 30 cm Lembar44 Nok seng Bjls 0,30 Lembar45 Seng plat Bjls 0,20 Lembar46 Seng plat Bjls 0,20 - 40 cm Lembar47 Paku biasa 1-3 cm Kg48 Paku biasa 5-12 cm Kg49 Paku beton 1-3 cm Kg50 Paku beton 5-15 cm Kg51 Paku kayu 1-3 cm Kg52 Paku kayu 5-7 cm Kg53 Paku kayu 7-15 cm Kg54 Paku seng Kg55 Paku asbes Kg56 Pipa PVC dia 1/2 " Batang57 Pipa PVC dia 3/4 " Batang58 Pipa PVC dia 1 " Batang59 Pipa PVC dia 2 " Batang

Page 201: Boq Kosong

60 Pipa PVC dia 3 " Batang61 Pipa PVC dia 4 " Batang

Page 202: Boq Kosong

1 2 3 4 5

62 Pipa GIP Medium A dia 2,5 " Batang63 Pipa GIP Medium A dia 2 " Batang64 Pipa GIP Medium A dia 1" Batang65 Pipa GIP Medium A dia 3/4 " Batang66 Pipa GIP Medium A dia 1/2 " Batang67 Pipa GIP Medium B dia 2,5 " Batang68 Pipa GIP Medium B dia 2 " Batang69 Pipa GIP Medium B dia 1 " Batang70 Pipa GIP Medium B dia 3/4 " Batang71 Pipa GIP Medium B dia 1/2 " Batang72 Buis beton 20 f cm Buah73 Buis beton 10 f cm Buah74 Water muur GIP dia 4 " Buah75 Water muur GIP dia 3 " Buah76 Water muur GIP dia 2 " Buah77 Water muur GIP dia 1,5 " Buah78 Water muur GIP dia 1 " Buah79 Water muur GIP dia 3/4 " Buah80 Water muur GIP dia 1/2 " Buah81 Shocet PVC dia 6 " Buah82 Shocet PVC dia 4 " Buah83 Shocet PVC dia 3 " Buah84 Shocet PVC dia 2,5 " Buah85 Shocet PVC dia 2 " Buah86 Shocet PVC dia 1,5 " Buah87 Shocet PVC dia 1 " Buah88 Shocet PVC dia 3/4 " Buah89 Shocet PVC dia 1/2 " Buah90 Shocet GIP dia 4 " Buah91 Shocet GIP dia 3 " Buah92 Shocet GIP dia 2 " Buah93 Shocet GIP dia 1,5 " Buah94 Shocet GIP dia 1 1/4 " Buah95 Shocet GIP dia 1 " Buah96 Shocet GIP dia 3/4 " Buah97 Shocet GIP dia 1/2 " Buah98 Shok Nepel dia 1/2 " Buah99 Shok Nepel dia 3/4 " Buah

100 Nepel GIP dia 4 " Buah101 Nepel GIP dia 3 " Buah102 Nepel GIP dia 2 " Buah103 Nepel GIP dia 1,5 " Buah104 Nepel GIP dia 1 " Buah105 Nepel GIP dia 3/4 " Buah106 Nepel GIP dia 1/2 " Buah107 Lem PVC Kg108 Klem sadle GIP dia 2 " x 0,5 " Buah109 Knee GIP dia 4 " Buah110 Knee GIP dia 3 " Buah111 Knee GIP dia 2 " Buah112 Knee GIP dia 1,5 " Buah113 Knee GIP dia 1 " Buah114 Knee GIP dia 3/4 " Buah115 Knee GIP dia 1/2 " Buah116 Elbow GIP dia 4 " Buah117 Elbow GIP dia 3 " Buah118 Elbow GIP dia 2 " Buah119 Elbow GIP dia 1,5 " Buah120 Elbow GIP dia 1 " Buah121 Elbow GIP dia 3/4 " Buah122 Elbow GIP dia 1/2 " Buah123 Stop kran GIP dia 4 " Buah124 Stop kran GIP dia 3 " Buah125 Stop kran GIP dia 2 " Buah

Page 203: Boq Kosong

1 2 3 4 5

126 Stop kran GIP dia 1,5 " Buah127 Stop kran GIP dia 1 " Buah128 Stop kran GIP dia 3/4" Buah129 Stop kran GIP dia 1/2 " Buah130 Dop GIP dia 3 " Buah131 Dop GIP dia 2 " Buah132 Dop GIP dia 1,5 " Buah133 Dop GIP dia 1 " Buah134 Dop GIP dia 3/4 " Buah135 Dop GIP dia 1/2 " Buah136 Kran GIP dia 1 " Buah137 Kran GIP dia 3/4 " Buah138 Kran GIP dia 1/2 " Buah139 Tee GIP dia 4" x 4" Buah140 Tee GIP dia 4" x 3" Buah141 Tee GIP dia 4" x 2" Buah142 Tee GIP dia 4" x 1,5" Buah143 Tee GIP dia 4" x 1" Buah144 Tee GIP dia 4" x 3/4" Buah145 Tee GIP dia 4" x 1/2" Buah146 Tee GIP dia 3" x 3" Buah147 Tee GIP dia 3" x 2" Buah148 Tee GIP dia 3" x 1,5" Buah149 Tee GIP dia 3" x 1" Buah150 Tee GIP dia 3" x 3/4" Buah151 Tee GIP dia 3" x 1/2" Buah152 Tee GIP dia 2" x 2" Buah153 Tee GIP dia 2" x 1,5" Buah154 Tee GIP dia 2" x 1" Buah155 Tee GIP dia 2" x 3/4" Buah156 Tee GIP dia 2" x 1/2" Buah157 Tee GIP dia 1,5" x 1,5" Buah158 Tee GIP dia 1,5" x 1" Buah159 Tee GIP dia 1,5" x 3/4" Buah160 Tee GIP dia 1,5" x 1/2" Buah161 Tee GIP dia 1" x 1" Buah162 Tee GIP dia 1" x 3/4" Buah163 Tee GIP dia 1" x 1/2" Buah164 Tee GIP dia 3/4" x 3/4" Buah165 Tee GIP dia 3/4" x 1/2" Buah166 Tee GIP dia 1/2" x 1/2" Buah167 Reducer GIP / over chok dia 4" x 3" Buah168 Reducer GIP / over chok dia 4" x 2" Buah169 Reducer GIP / over chok dia 4" x 1,5" Buah170 Reducer GIP / over chok dia 4" x 1" Buah171 Reducer GIP / over chok dia 4" x 3/4" Buah172 Reducer GIP / over chok dia 4" x 1/2" Buah173 Reducer GIP / over chok dia 3" x 2" Buah174 Reducer GIP / over chok dia 3" x 1,5" Buah175 Reducer GIP / over chok dia 3" x 1" Buah176 Reducer GIP / over chok dia 3" x 3/4" Buah177 Reducer GIP / over chok dia 3" x 1/2" Buah178 Reducer GIP / over chok dia 2" x 1,5" Buah179 Reducer GIP / over chok dia 2" x 1" Buah180 Reducer GIP / over chok dia 2" x 3/4" Buah181 Reducer GIP / over chok dia 2" x 1/2" Buah182 Reducer GIP / over chok dia 1,5" x 1" Buah183 Reducer GIP / over chok dia 1,5" x 3/4" Buah184 Reducer GIP / over chok dia 1,5" x 1/2" Buah185 Reducer GIP / over chok dia 1" x 3/4" Buah186 Reducer GIP / over chok dia 1" x 1/2" Buah187 Reducer GIP / over chok dia 3/4" x 1/2" Buah188 Klem sadle GIP dia 4" x 2" Buah189 Klem sadle GIP dia 4" x 1" Buah190 Klem sadle GIP dia 4" x 3/4" Buah

Page 204: Boq Kosong

1 2 3 4 5

191 Klem sadle GIP dia 4" x 1/2" Buah192 Tripleks 3 mm Lembar193 Tripleks 4 mm Lembar194 Tripleks 6 mm Lembar195 Tripleks 9 mm Lembar196 Seng baja deck polos BD. 0,20 Lembar197 Seng baja deck polos BD. 0,30 Lembar198 Seng baja deck polos berwarna BD. 0,20 Lembar199 Seng baja deck polos berwarna BD. 0,30 Lembar200 Seng nok baja deck L 45 polos BD. 0,20 M'201 Seng nok baja deck L 45 polos BD. 0,30 M'202 Seng Leisplang berwarna BD. 0,30 M'203 Seng Leisplang berwarna BD. 0,20 M'204 Plat streep 30 x 3 mm Batang205 Plat streep 50 x 3 mm Batang206 Besi siku 30 x 30 x 3 Batang207 Besi siku 40 x 50 x 5 Batang208 Besi siku 50 x 50 x 5 Batang209 Lampu pijar 40 watt Buah210 Lampu TL 20 watt Buah211 Lampu TL 40 watt Buah212 Lampu TL 20 watt complit Buah213 Lampu TL 40 watt complit Buah214 Lampu taman Buah215 Fitting gantung Buah216 Fitting tempel Buah217 Stop kontak Buah218 Saklar Buah219 Kabel 2,5 mm Roll220 Sirap Lembar221 Kawat duri Roll222 Politur Kg223 Amplas Lembar224 Lem aica aibon Kg225 Paku kait Kg226 Paku sumbat Kg227 Paku tripleks Kg228 Teakwood Lembar229 Teakwood pintu Lembar230 Reservoir air rangka baja 1 m3 Buah231 Sumur pompa air terpasang Buah232 Titik lampu + instalasi Titik233 Stop kontak + instalasi Titik234 Zekering Cash lokal 1 Group Unit235 Zekering Cash lokal 2 Group Unit236 Zekering Cash lokal 3 Group Unit237 Cat tembok 5 kg Kg238 Cat tembok 1 kg Kg239 Plamur tembok 5 kg Kg240 Plamur kayu Kg241 Cat kayu mengkilap Kg242 Dempul kayu Kg243 Cat menie Kg244 Cat kayu dasar Kg245 Tiner Liter246 Sirlak Liter247 Oker Liter248 Lem kayu Kg249 Kwas Bh250 Minyak cat Kg251 Minyak flux Liter

Page 205: Boq Kosong

1 2 3 4 5

252 Minyak tanah Liter253 Minyak diesel / solar Liter254 Minyak bensin / premium Liter255 Minyak pelumas Liter256 Residu Kg257 Kawat kasa logam / kawat nyamuk Kg258 Besi beton ulir Kg259 Baja tulangan ulir Kg260 Kawat baja Kg261 Baut baja Kg262 Paku jembatan Kg263 Baja tulangan polos Kg264 Kawat bronjong wonosari Unit265 Kawat bronjong jangkar Unit266 Kawat bronjong bofananda Unit267 Aspal bitumen Kg268 Aspal buton Ton269 Gemuk Kg270 Olie drum Liter271 Besi beugel / baut ( pengikat kuda-kuda ) Buah272 Engsel lokal Pasang273 Grendel lokal Buah274 Kunci tanam kwalitas biasa 2 x putar Buah275 Kunci tanam kwalitas sedang 2 x putar Buah276 Kunci tanam kwalitas baik 2 x putar Buah277 Espagnoglet Pasang278 Hak angin Pasang279 Naco (rangka + daun ) 8 sisir Pasang280 Bak mandi fiber glass Unit281 Kloset jongkok keramik ( setara KIA ) Unit282 Kloset duduk keramik ( setara KIA ) Unit283 Urinoir keramik ( setara KIA ) Unit284 Flour drain Buah285 Bak cuci tangan wastafel (setara keramik) Unit286 Bak cuci piring teraso Unit287 Bak cuci piring logam Unit

File X-02-D-AM-K9 BCK 2010 jdh

Page 206: Boq Kosong

DAFTAR HARGA BAHAN BANGUNANTahun Angaran 2012

KET.

6

Page 207: Boq Kosong
Page 208: Boq Kosong

Hal : 2

Page 209: Boq Kosong

Hal : 3

6

Page 210: Boq Kosong

Hal : 4

6

Page 211: Boq Kosong

Hal : 5

6

Page 212: Boq Kosong

HARGA DASAR (BASIC PRICE ) & JARAK RATA-RATADARI SUMBER BAHAN (QUARRY)

Tahun Angaran 2010Sesuai Keputusan Bupati Ende

Nomor : 251 Tahun 2009

Tanggal : 28 Oktober 2009

SK TOKO TOKO

No. U R A I A N KODE SATUAN BUPATI NIRMALA ATAMBUA

1 2 3 4

I BAHAN BANGUNAN LOKAL

1 Pasir Urug ML.01 M3 41,975.002 Pasir Pasang ML.02 M3 71,600.003 Pasir Beton ML.03 M3 70,150.004 Kerikil Koral 5/7 cm ML.04 M3 87,975.005 Kerikil Koral 3/5 cm ML.05 M3 111,550.006 Kerikil Koral 2/3 cm ML.06 M3 141,200.007 Kerikil Koral 1/2 cm ML.07 M3 280,600.008 Koral Beton Split Uk 2-3 cm ML.08 M3 143,750.009 Koral Beton Split Uk 3-5 cm ML.09 M3 63,850.00

10 Batu Kali / Gunung ML.10 M3 70,150.0011 Batu Bata Merah ML.10 Buah 1,725.0012 Batako ML.11 Buah 4,025.0013 Batu Roster ML.12 Buah 5,750.0014 Tanah Urug Biasa ML.13 M3 35,650.0015 Tanah Urug Pilihan ML.14 M3 52,900.0016 Batu Pecah uk 10 - 15 cm ML.15 M3 128,800.0017 Batu Pecah uk 7 - 10 cm ML.16 M3 207,000.0018 Batu Pecah uk 5 - 7 cm ML.17 M3 207,000.0019 Batu Pecah uk 3 - 5 cm ML.18 M3 274,850.0020 Batu Pecah uk 2 - 3 cm ML.19 M3 312,800.0021 Batu Pecah uk 1 - 2 cm ML.20 M3 315,100.0022 Batu Pecah uk 0,5 - 1 cm ML.21 M3 519,800.0023 Kerikil dari galian bukit ML.22 M3 60,950.0024 Kerikil sungai ( tidak tersaring ) ML.23 M3 51,750.0025 Kerikil sungai (tersaring) ML.24 M3 86,250.0026 Kerikil pecah tersaring ML.25 M3 163,300.0027 Sirtu ML.26 M3 51,750.0028 Gamping ML.27 Zak 35,000.0029 Gamping Jawa ML.28 Kg 6,700.0030 Gedeg Biasa ML.29 M2 7,600.0031 Gedeg Kulit ML.30 M2 15,300.0032 Bambu cincang ML.31 M2 18,400.0033 List plafond ML.32 M' 9,200.0034 List kaca ML.33 M' 2,300.0035 Kayu balok kelapa ML.34 M3 2,509,300.0036 Kayu Hutan Kelas II ( balok ) ML.35 M3 2,926,750.0037 Kayu Hutan kelas II ( papan ) ML.36 M3 4,562,050.0038 Papan nara ML.37 M3 3,802,200.0039 Kayu bayam ( balok ) 6/12 ML.38 M3 7,527,900.0040 Kayu bayam ( papan ) 3/30 ML.39 M3 10,037,750.0041 Kayu untuk perancah ML.40 M3 10,264,900.0042 Kayu untuk konstruksi jembatan ML.41 M3 5,323,100.0043 Usuk kayu kelas II ML.42 M3 4,562,700.0044 Kayu bakar ML.43 M3 304,200.0045 Papan kayu ( bouwplank) ML.44 M3 2,091,200.0046 Papan begisting ML.45 M3 2,091,000.0047 Tali ijuk ML.46 Ikat 4,600.0048 Ijuk ML.47 Kg 36,800.0049 Tiang pagar botol polos ML.48 Buah 16,700.0050 Tiang pagar botol kembang ML.49 Buah 23,500.0051 Kapur pasang ML.50 Zak 25,300.0052 Kapur bakar ML.51 M3 828,000.0053 Batu kapur ML.52 M3 500,000.0054 Filler ML.53 M3 266,800.00

Page 213: Boq Kosong

1 2 3 4

II BAHAN BANGUNAN NON LOKAL

1 Gorong-gorong armco d = 60 cm MN.01 M 1,564,000.002 Gorong-gorong armco d = 80 cm MN.02 M 3,680,000.003 Gorong-gorong armco d = 100 cm MN.03 M 2,760,000.004 Bahan Timbunan pilihan MN.04 M3 27,600.005 Semen abu-abu @ 50 kg Tiga Roda PCC Zak 70,400.006 Semen abu-abu @ 40 kg Tiga Roda PCC Zak 60,000.00 47,000.007 Semen putih @ 50 kg MN.07 Zak 132,000.008 Semen putih @ 40 kg MN.08 Zak 114,400.00 95,000.009 Semen Tonasa @ 50 kg MN.09 Zak 69,600.00

10 Semen Tonasa @ 40 kg PPC Zak 57,500.00 46,000.00 47,000.0011 Semen Kupang @ 40 kg MN.11 Zak 57,500.0012 Semen Gresik @ 50 kg MN.12 Zak 57,500.0013 Semen Gresik @ 40 kg PPC Zak 57,500.00 47,000.0014 Semen Bosowa @ 50 kg MN.14 Zak 67,500.0015 Besi beton polos 5 mm panjang 12 m' MN.15 Batang 17,750.00 20,000.0016 Besi beton polos 6 mm panjang 12 m' MN.16 Batang 41,250.00 39,000.0017 Besi beton polos 8 mm panjang 12 m' MN.17 Batang 63,800.00 54,000.0018 Besi beton polos 10 mm panjang 12m' MN.18 Batang 101,750.00 81,000.0019 Besi beton polos 12 mm panjang 12 m' MN.19 Batang 143,000.00 85,000.00 120,000.0020 Besi beton polos 14 mm panjang 12 m' MN.20 Batang 205,700.0021 Besi beton polos 16 mm panjang 12 m' MN.21 Batang 236,500.00 165,000.0022 Kawat beton / bendral MN.22 Kg 19,950.00 20,000.00 17,000.0023 Porselint uk. 11 cm x 11 cm MN.23 Doz 73,400.0024 Porselint uk. 10 cm x 15 cm MN.24 Doz 68,900.0025 Porselint uk. 15 cm x 15 cm MN.25 Doz 67,500.0026 Porselint uk. 20 cm x 20 cm MN.26 Doz 67,500.0027 Porselint uk. 30 cm x 30 cm MN.27 Doz 43,700.0028 Plint keramik uk. 30 cm x 10 cm MN.28 Doz 134,750.00 50,000.0029 Keramik 20 cm x 20 cm MN.29 Doz 71,400.00 60,000.00 45,000.0030 Keramik 20 cm x 25 cm MN.30 Doz 74,800.00 55,000.00 50,000.0031 Ubin abu-abu 15 cm x 20 cm MN.31 Doz 72,600.0032 Plint ubin berwarna 15 cm x 20 cm MN.32 Doz 53,600.0033 Ubin wafel abu-abu 20 cm x 20 cm MN.33 Buah 3,650.0034 Ubin wafel berwarna 20 cm x 20 cm MN.34 Doz 27,500.0035 Kaca bening 3 mm MN.35 M2 105,300.00 80,000.0036 Kaca bening 5 mm MN.36 M2 138,600.00 150,000.0037 Kaca reyben 3 mm MN.37 M2 138,600.00 90,000.0038 Kaca reyben 5 mm MN.38 M2 188,100.00 160,000.0039 Genteng (setara genteng kodok ) MN.39 Buah 3,850.0040 Karpus genteng (setara genteng kodok) MN.40 Buah 3,850.0041 Seng gelombang Bjls uk. 0,30 MN.42 Lembar 64,000.00 60,000.00 56,000.0042 Seng gelombang Bjls uk. 0,20 MN.43 Lembar 70,400.00 36,000.00 35,000.0043 Nok seng Bjls 0,20 - 30 cm MN.44 Lembar/M' 11,800.00 10,000.0044 Nok seng Bjls 0,30 MN.45 Lembar/M' 23,000.00 12,000.0045 Seng plat Bjls 0,20 MN.46 Lembar 65,050.00 40,000.0046 Seng plat Bjls 0,20 - 40 cm MN.47 Lembar/M' 25,200.00 12,500.0047 Paku biasa 1-3 cm MN.48 Kg 22,500.00 20,000.0048 Paku biasa 5-12 cm MN.49 Kg 20,700.00 16,000.00 15,000.0049 Paku beton 1-3 cm MN.50 Kg 22,500.0050 Paku beton 5-15 cm MN.51 Kg 20,700.0051 Paku kayu 1-3 cm MN.52 Kg 16,900.00 20,000.0052 Paku kayu 5-7 cm MN.53 Kg 16,900.00 15,000.0053 Paku kayu 7-15 cm MN.54 Kg 16,900.00 15,000.0054 Paku seng MN.55 Kg 25,300.00 20,000.00 20,000.0055 Paku asbes MN.56 Kg 19,150.00 30,000.0056 Pipa PVC dia 1/2 " MN.57 Batang 40,500.00 16,000.00 15,000.0057 Pipa PVC dia 3/4 " MN.58 Batang 47,200.00 20,000.00 17,000.0058 Pipa PVC dia 1 " MN.59 Batang 54,450.00 26,000.00 23,000.0059 Pipa PVC dia 2 " MN.60 Batang 71,200.00 40,000.00 26,000.0060 Pipa PVC dia 3 " MN.61 Batang 159,950.00 70,000.00 55,000.0061 Pipa PVC dia 4 " MN.62 Batang 202,050.00 95,000.00 80,000.00

Page 214: Boq Kosong

1 2 3 4

62 Pipa GIP Medium A dia 2,5 " MN.64 Batang 589,300.00 590,000.0063 Pipa GIP Medium A dia 2 " MN.65 Batang 495,150.00 345,000.0064 Pipa GIP Medium A dia 1" MN.66 Batang 134,750.00 165,000.0065 Pipa GIP Medium A dia 3/4 " MN.67 Batang 163,150.00 130,000.0066 Pipa GIP Medium A dia 1/2 " MN.68 Batang 151,600.00 110,000.0067 Pipa GIP Medium B dia 2,5 " MN.70 Batang 294,800.00 415,000.0068 Pipa GIP Medium B dia 2 " MN.71 Batang 273,150.00 285,000.0069 Pipa GIP Medium B dia 1 " MN.72 Batang 143,000.00 135,000.0070 Pipa GIP Medium B dia 3/4 " MN.73 Batang 114,400.00 110,000.0071 Pipa GIP Medium B dia 1/2 " MN.74 Batang 92,650.00 88,000.0072 Buis beton 20 f cm MN.81 Buah 613,050.0073 Buis beton 10 f cm MN.82 Buah 471,500.0074 Water muur GIP dia 4 " MN.83 Buah 260,975.00 300,000.00 250,000.0075 Water muur GIP dia 3 " MN.84 Buah 168,300.00 160,000.00 140,000.0076 Water muur GIP dia 2 " MN.85 Buah 67,350.00 60,000.00 45,000.0077 Water muur GIP dia 1,5 " MN.86 Buah 40,500.00 32,000.0078 Water muur GIP dia 1 " MN.87 Buah 23,650.00 22,000.00 18,000.0079 Water muur GIP dia 3/4 " MN.88 Buah 16,900.00 18,000.00 15,000.0080 Water muur GIP dia 1/2 " MN.89 Buah 109,450.00 14,000.00 12,000.0081 Shocet PVC dia 6 " MN.90 Buah 11,800.00 25,000.0082 Shocet PVC dia 4 " MN.91 Buah 13,450.00 7,000.00 8,500.0083 Shocet PVC dia 3 " MN.92 Buah 16,150.00 6,000.00 6,000.0084 Shocet PVC dia 2,5 " MN.93 Buah 7,600.00 5,000.00 6,000.0085 Shocet PVC dia 2 " MN.94 Buah 10,150.00 4,000.00 5,000.0086 Shocet PVC dia 1,5 " MN.95 Buah 11,800.00 3,000.00 5,000.0087 Shocet PVC dia 1 " MN.96 Buah 6,900.00 2,000.00 2,500.0088 Shocet PVC dia 3/4 " MN.97 Buah 5,350.00 2,000.00 2,000.0089 Shocet PVC dia 1/2 " MN.98 Buah 3,800.00 1,000.00 1,500.0090 Shocet GIP dia 4 " MN.99 Buah 84,150.00 90,000.00 75,000.0091 Shocet GIP dia 3 " MN.100 Buah 50,600.00 55,000.00 45,000.0092 Shocet GIP dia 2 " MN.101 Buah 23,800.00 20,000.00 17,000.0093 Shocet GIP dia 1,5 " MN.102 Buah 18,500.00 15,000.00 12,000.0094 Shocet GIP dia 1 1/4 " MN.103 Buah 13,450.00 13,000.00 11,000.0095 Shocet GIP dia 1 " MN.104 Buah 10,150.00 8,000.00 6,000.0096 Shocet GIP dia 3/4 " MN.105 Buah 6,900.00 6,000.00 4,000.0097 Shocet GIP dia 1/2 " MN.106 Buah 5,350.00 5,000.00 3,500.0098 Shok Nepel dia 1/2 " MN.113 Buah 6,850.00 5,000.00 3,000.0099 Shok Nepel dia 3/4 " MN.114 Buah 8,400.00 8,000.00 4,000.00

100 Nepel GIP dia 4 " MN.115 Buah 7,600.00 150,000.00 65,000.00101 Nepel GIP dia 3 " MN.116 Buah 67,350.00 85,000.00 45,000.00102 Nepel GIP dia 2 " MN.117 Buah 25,300.00 27,000.00 17,500.00103 Nepel GIP dia 1,5 " MN.118 Buah 16,850.00 12,500.00104 Nepel GIP dia 1 " MN.119 Buah 10,150.00 9,000.00 6,500.00105 Nepel GIP dia 3/4 " MN.120 Buah 9,850.00 8,500.00 5,000.00106 Nepel GIP dia 1/2 " MN.121 Buah 5,350.00 5,000.00 4,000.00107 Lem PVC MN.122 Kg 59,000.00 25,000.00108 Klem sadle GIP dia 2 " x 0,5 " MN.123 Buah 50,600.00 30,000.00109 Knee GIP dia 4 " MN.124 Buah 117,950.00 140,000.00 110,000.00110 Knee GIP dia 3 " MN.125 Buah 67,350.00 75,000.00 65,000.00111 Knee GIP dia 2 " MN.126 Buah 33,700.00 26,000.00 23,000.00112 Knee GIP dia 1,5 " MN.127 Buah 25,300.00 15,000.00113 Knee GIP dia 1 " MN.128 Buah 11,800.00 10,000.00 7,500.00114 Knee GIP dia 3/4 " MN.129 Buah 8,450.00 6,000.00 5,000.00115 Knee GIP dia 1/2 " MN.130 Buah 5,350.00 5,000.00 4,500.00116 Elbow GIP dia 4 " MN.131 Buah 210,500.00 260,000.00117 Elbow GIP dia 3 " MN.132 Buah 126,300.00 125,000.00118 Elbow GIP dia 2 " MN.133 Buah 50,600.00 45,000.00119 Elbow GIP dia 1,5 " MN.134 Buah 33,700.00 19,000.00120 Elbow GIP dia 1 " MN.135 Buah 16,850.00 12,500.00121 Elbow GIP dia 3/4 " MN.136 Buah 13,050.00 9,000.00122 Elbow GIP dia 1/2 " MN.137 Buah 8,450.00 7,000.00123 Stop kran GIP dia 4 " MN.146 Buah 589,300.00 250,000.00124 Stop kran GIP dia 3 " MN.147 Buah 420,950.00 200,000.00125 Stop kran GIP dia 2 " MN.148 Buah 218,900.00 500,000.00 50,000.00

Page 215: Boq Kosong

1 2 3 4

126 Stop kran GIP dia 1,5 " MN.149 Buah 134,750.00 35,000.00127 Stop kran GIP dia 1 " MN.150 Buah 109,450.00 200,000.00 30,000.00128 Stop kran GIP dia 3/4" MN.151 Buah 67,350.00 35,000.00 20,000.00129 Stop kran GIP dia 1/2 " MN.152 Buah 50,600.00 45,000.00 12,500.00130 Dop GIP dia 3 " MN.153 Buah 43,800.00 40,000.00131 Dop GIP dia 2 " MN.154 Buah 18,500.00 15,000.00132 Dop GIP dia 1,5 " MN.155 Buah 13,450.00 11,000.00133 Dop GIP dia 1 " MN.156 Buah 8,450.00 6,500.00134 Dop GIP dia 3/4 " MN.157 Buah 4,250.00 4,500.00135 Dop GIP dia 1/2 " MN.158 Buah 5,400.00 5,000.00 3,500.00136 Kran GIP dia 1 " MN.159 Buah 31,350.00137 Kran GIP dia 3/4 " MN.160 Buah 37,400.00 25,000.00 25,000.00138 Kran GIP dia 1/2 " MN.161 Buah 33,750.00 30,000.00 15,000.00139 Tee GIP dia 4" x 4" MN.162 Buah 135,100.00 145,000.00140 Tee GIP dia 4" x 3" MN.163 Buah 84,150.00141 Tee GIP dia 4" x 2" MN.164 Buah 135,150.00142 Tee GIP dia 4" x 1,5" MN.165 Buah 135,150.00143 Tee GIP dia 4" x 1" MN.166 Buah 135,150.00144 Tee GIP dia 4" x 3/4" MN.167 Buah 135,150.00145 Tee GIP dia 4" x 1/2" MN.168 Buah 135,150.00146 Tee GIP dia 3" x 3" MN.169 Buah 84,150.00 85,000.00147 Tee GIP dia 3" x 2" MN.170 Buah 84,150.00 95,000.00148 Tee GIP dia 3" x 1,5" MN.171 Buah 84,150.00 80,000.00149 Tee GIP dia 3" x 1" MN.172 Buah 84,150.00 95,000.00150 Tee GIP dia 3" x 3/4" MN.173 Buah 84,150.00151 Tee GIP dia 3" x 1/2" MN.174 Buah 84,150.00152 Tee GIP dia 2" x 2" MN.175 Buah 25,200.00 26,000.00153 Tee GIP dia 2" x 1,5" MN.176 Buah 56,650.00 21,000.00154 Tee GIP dia 2" x 1" MN.177 Buah 25,200.00 18,000.00155 Tee GIP dia 2" x 3/4" MN.178 Buah 25,300.00 17,000.00156 Tee GIP dia 2" x 1/2" MN.179 Buah 56,700.00 15,000.00157 Tee GIP dia 1,5" x 1,5" MN.180 Buah 16,900.00 18,000.00158 Tee GIP dia 1,5" x 1" MN.181 Buah 14,550.00 15,000.00159 Tee GIP dia 1,5" x 3/4" MN.182 Buah 13,050.00 10,000.00160 Tee GIP dia 1,5" x 1/2" MN.183 Buah 15,300.00 7,500.00161 Tee GIP dia 1" x 1" MN.184 Buah 15,300.00 10,000.00162 Tee GIP dia 1" x 3/4" MN.185 Buah 9,350.00 7,500.00163 Tee GIP dia 1" x 1/2" MN.186 Buah 10,150.00 6,000.00164 Tee GIP dia 3/4" x 3/4" MN.187 Buah 9,250.00 6,000.00165 Tee GIP dia 3/4" x 1/2" MN.188 Buah 122,450.00 5,000.00166 Tee GIP dia 1/2" x 1/2" MN.189 Buah 122,450.00 5,000.00167 Reducer GIP / over chok dia 4" x 3" MN.190 Buah 122,450.00 65,000.00168 Reducer GIP / over chok dia 4" x 2" MN.191 Buah 122,450.00169 Reducer GIP / over chok dia 4" x 1,5" MN.192 Buah 122,450.00170 Reducer GIP / over chok dia 4" x 1" MN.193 Buah 122,450.00171 Reducer GIP / over chok dia 4" x 3/4" MN.194 Buah 73,950.00172 Reducer GIP / over chok dia 4" x 1/2" MN.195 Buah 73,950.00173 Reducer GIP / over chok dia 3" x 2" MN.196 Buah 100,250.00 37,000.00174 Reducer GIP / over chok dia 3" x 1,5" MN.197 Buah 100,250.00175 Reducer GIP / over chok dia 3" x 1" MN.198 Buah 100,250.00176 Reducer GIP / over chok dia 3" x 3/4" MN.199 Buah 100,250.00177 Reducer GIP / over chok dia 3" x 1/2" MN.200 Buah 29,500.00178 Reducer GIP / over chok dia 2" x 1,5" MN.201 Buah 29,500.00 17,500.00179 Reducer GIP / over chok dia 2" x 1" MN.202 Buah 29,500.00 17,000.00180 Reducer GIP / over chok dia 2" x 3/4" MN.203 Buah 29,500.00 16,000.00181 Reducer GIP / over chok dia 2" x 1/2" MN.204 Buah 29,500.00 13,000.00182 Reducer GIP / over chok dia 1,5" x 1" MN.205 Buah 16,850.00 14,000.00183 Reducer GIP / over chok dia 1,5" x 3/4" MN.206 Buah 11,800.00 10,000.00184 Reducer GIP / over chok dia 1,5" x 1/2" MN.207 Buah 11,800.00 10,000.00185 Reducer GIP / over chok dia 1" x 3/4" MN.208 Buah 11,800.00 8,500.00186 Reducer GIP / over chok dia 1" x 1/2" MN.209 Buah 7,700.00 8,000.00187 Reducer GIP / over chok dia 3/4" x 1/2" MN.210 Buah 7,700.00 6,500.00188 Klem sadle GIP dia 4" x 2" MN.216 Buah 126,300.00189 Klem sadle GIP dia 4" x 1" MN.217 Buah 126,300.00 40,000.00190 Klem sadle GIP dia 4" x 3/4" MN.218 Buah 84,150.00

Page 216: Boq Kosong

1 2 3 4

191 Klem sadle GIP dia 4" x 1/2" MN.219 Buah 84,150.00192 Tripleks 3 mm MN.222 Lembar 96,250.00 43,000.00 42,000.00193 Tripleks 4 mm MN.223 Lembar 148,500.00 55,000.00 54,000.00194 Tripleks 6 mm MN.224 Lembar 203,500.00 70,000.00 70,000.00195 Tripleks 9 mm MN.225 Lembar 308,000.00 120,000.00 109,000.00196 Seng baja deck polos BD. 0,20 MN.226 Lembar 52,250.00 60,000.00197 Seng baja deck polos BD. 0,30 MN.227 Lembar 82,750.00198 Seng baja deck polos berwarna BD.0,20 MN.228 Lembar 44,275.00199 Seng baja deck polos berwarna BD.0,30 MN.229 Lembar 51,700.00200 Seng nok baja deck L 45 polos BD. 0,20 MN.230 M' 26,050.00201 Seng nok baja deck L 45 polos BD. 0,30 MN.231 M' 34,100.00202 Seng Leisplang berwarna BD. 0,30 x 30 MN.232 Lembar 22,250.00 40,000.00203 Seng Leisplang berwarna BD. 0,20 MN.233 M' 16,850.00204 Plat streep 30 x 3 mm MN.234 Batang 69,050.00 30,000.00205 Plat streep 50 x 3 mm MN.235 Batang 82,750.00 40,000.00206 Besi siku 30 x 30 x 3 MN.236 Batang 67,400.00 42,500.00207 Besi siku 40 x 50 x 5 MN.237 Batang 67,400.00 65,000.00208 Besi siku 50 x 50 x 5 MN.238 Batang 84,150.00 97,500.00209 Lampu pijar 40 watt MN.239 Buah 8,450.00 5,000.00210 Lampu TL 20 watt MN.240 Buah 20,650.00 14,000.00 5,000.00211 Lampu TL 40 watt MN.241 Buah 23,750.00 15,000.00 9,000.00212 Lampu TL 20 watt complit MN.242 Buah 126,300.00 110,000.00 22,500.00213 Lampu TL 40 watt complit MN.243 Buah 141,900.00 120,000.00 30,000.00214 Lampu taman MN.244 Buah 269,500.00215 Fitting gantung MN.245 Buah 6,900.00 5,000.00 5,000.00216 Fitting tempel MN.246 Buah 8,450.00 5,000.00 5,000.00217 Stop kontak MN.247 Buah 25,300.00 15,000.00 12,500.00218 Saklar Engkle MN.248 Buah 29,500.00 15,000.00 12,500.00219 Kabel 2,5 mm (Fokus) MN.249 Roll 271,150.00 250,000.00 250,000.00220 Sirap MN.250 Lembar 1,800.00221 Kawat duri MN.251 Roll 126,300.00 90,000.00 77,500.00222 Politur MN.252 Kg 58,950.00 30,000.00223 Amplas MN.253 Lembar 3,050.00 4,000.00 2,500.00224 Lem aica aibon MN.254 Kg 4,600.00 50,000.00 37,500.00225 Paku kait MN.255 Kg 23,800.00226 Paku sumbat MN.256 Kg 119,600.00227 Paku tripleks MN.257 Kg 101,200.00 19,000.00 20,000.00228 Teakwood 4 x 8 MN.258 Lembar 108,700.00 85,000.00229 Teakwood pintu MN.259 Lembar 2,700.00 65,000.00 70,000.00230 Reservoir air rangka baja 1 m3 MN.260 Buah 101,200.00231 Sumur pompa air terpasang MN.261 Buah 106,150.00232 Titik lampu + instalasi MN.262 Titik 31,150.00233 Stop kontak + instalasi MN.263 Titik 105,150.00 1,000.00234 Zekering Cash lokal 1 Group MN.264 Unit 28,600.00 5,000.00 15,000.00235 Zekering Cash lokal 2 Group MN.265 Unit 42,100.00 6,000.00 25,000.00236 Zekering Cash lokal 3 Group MN.266 Unit 67,350.00 35,000.00237 Cat tembok 5 kg MN.267 Kg 92,550.00 65,000.00 64,000.00238 Cat tembok 1 kg MN.268 Kg 84,150.00 17,500.00 15,000.00239 Plamur tembok 5 kg MN.269 Kg 67,350.00 55,000.00 37,500.00240 Plamur kayu MN.270 Kg 44,000.00 90,000.00 20,000.00241 Cat kayu mengkilap MN.271 Kg 53,900.00 33,000.00242 Dempul kayu MN.272 Kg 27,500.00 90,000.00 20,000.00243 Cat menie MN.273 Kg 27,500.00 20,000.00244 Cat kayu dasar MN.274 Kg 59,000.00 90,000.00245 Tiner MN.275 Liter 42,100.00 33,000.00 20,000.00246 Sirlak MN.276 Liter 109,450.00 60,000.00 70,000.00247 Oker MN.277 Liter 25,300.00 25,000.00248 Lem kayu MN.278 Kg 50,600.00 25,000.00 30,000.00249 Kwas 2 Inc MN.279 Bh 26,700.00 10,000.00 3,000.00250 Minyak cat MN.280 Kg 23,750.00 15,000.00251 Minyak flux MN.281 Liter 4,600.00

Page 217: Boq Kosong

1 2 3 4

252 Minyak tanah MN.282 Liter 4,200.00253 Minyak diesel / solar MN.283 Liter 5,900.00254 Minyak bensin / premium MN.284 Liter 6,350.00255 Minyak pelumas MN.285 Liter 38,300.00256 Residu MN.286 Kg 134,750.00257 Kawat kasa logam / kawat nyamuk MN.287 M 21,450.00 12,500.00258 Besi beton ulir 12mm MN.288 Btg 8,450.00 120,000.00259 Baja tulangan ulir MN.289 Kg 7,600.00260 Kawat baja MN.290 Kg 20,250.00261 Baut baja MN.291 Kg 8,450.00262 Paku jembatan MN.292 Kg 8,450.00263 Baja tulangan polos MN.293 Kg 7,000.00264 Kawat bronjong Lokal MN.294 Unit 535,700.00 600,000.00265 Kawat bronjong jangkar MN.295 Unit 382,800.00266 Kawat bronjong bofananda MN.296 Unit 497,200.00267 Aspal bitumen MN.297 Kg 6,900.00268 Aspal buton MN.298 Ton 1,150,000.00269 Gemuk MN.299 Kg 16,850.00270 Olie drum MN.300 Liter 22,700.00271 Besi beugel / baut ( pengikat kuda-kuda ) MN.301 Buah 19,150.00 20,000.00272 Engsel lokal MN.302 Pasang 16,850.00 2,500.00273 Grendel lokal MN.303 Buah 23,650.00 2,500.00274 Kunci tanam kwalitas biasa 2 x putar MN.304 Buah 67,350.00 25,000.00275 Kunci tanam kwalitas sedang 2 x putar MN.305 Buah 109,450.00 40,000.00 60,000.00276 Kunci tanam kwalitas baik 2 x putar MN.306 Buah 169,000.00 150,000.00 90,000.00277 Espagnoglet MN.307 Pasang 33,700.00278 Hak angin MN.308 Pasang 30,250.00 1,500.00279 Naco (rangka + daun ) 8 sisir MN.309 Lmbr 174,900.00 75,000.00280 Bak mandi fiber glass MN.310 Unit 294,800.00 250,000.00281 Kloset jongkok keramik ( setara KIA ) MN.311 Unit 150,700.00 300,000.00282 Kloset duduk keramik ( setara KIA ) MN.312 Unit 1,262,000.00 1,250,000.00283 Urinoir keramik ( setara KIA ) MN.313 Unit 589,300.00 750,000.00284 Flour drain MN.314 Buah 25,300.00 15,000.00285 Bak cuci tangan wastafel (setara keramik) MN.315 Unit 539,000.00 350,000.00 750,000.00286 Bak cuci piring teraso MN.316 Unit 416,350.00287 Bak cuci piring logam MN.317 Unit 463,000.00 210,000.00

III UPAH KERJA1 Pekerja L.01 O/H 38,500.00 2 Tukang L.02 O/H 55,000.00 3 Kepala Tukang L.03 O/H 66,000.00 4 Mandor L.04 O/H 66,000.00 5 Operator L.05 O/H 55,000.00 6 Pembantu Operator L.06 O/H 44,000.00 7 Sopir L.07 O/H 44,000.00 8 Pembantu Sopir L.08 O/H 38,500.00 9 Mekanik L.09 O/H 55,000.00

10 Pembantu Mekanik L.10 O/H 38,500.00 IV ALAT BERAT

1 Sewa Alat Concrete Mixer 0,3-0,6 M3 E.07 Jam 41,120.94 2 Sewa Alat Dump Truck 3-4 M3 E.08 Jam 264,761.05

Ende, 2016

Mengetahui : 0

Err:509 Kepala Bidang Cipta Karya

Err:509 Dinas Pekerjaan Umum Kabupaten Ende,

Err:509 PETRUS BOLI, ST

Err:509 PENATA TK. I

Err:509 NIP. 19550314 198302 1 003

Page 218: Boq Kosong
Page 219: Boq Kosong

HARGA DASAR (BASIC PRICE ) & JARAK RATA-RATADARI SUMBER BAHAN (QUARRY)

Tahun Angaran 2010

TOKO JARAK

ANGGREK QUARRY KET.

( Km )

5 6

8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00

Page 220: Boq Kosong

Hal : 2

5 6

8.00 8.00 8.00 8.00

56,000.00 8.00 46,000.00 8.00

8.00 90,000.00 8.00

8.00 46,000.00 8.00

8.00 8.00

46,000.00 8.00 8.00 8.00

21,000.00 8.00 39,000.00 8.00 55,000.00 8.00 82,500.00 8.00

8.00 170,000.00 8.00

18,000.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00

47,500.00 8.00 52,000.00 8.00

8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00

35,000.00 8.00 10,000.00 8.00

8.00 8.00 uk. 90 x 1808.00

18,000.00 8.00 15,000.00 8.00

8.00 8.00 8.00 8.00 8.00

18,000.00 8.00 8.00

16,000.00 8.00 18,000.00 8.00 35,000.00 8.00 48,000.00 8.00 60,000.00 8.00 80,000.00 8.00

Page 221: Boq Kosong

Hal : 3

5

8.00 8.00 8.00 8.00 8.00 8.00 B I8.00 B I8.00 B I8.00 B I8.00 B I8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00

Page 222: Boq Kosong

Hal : 4

5 6

8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 Verlop Tee8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 Verlop Tee8.00 Verlop Tee8.00 Verlop Tee8.00 8.00 8.00 Verlop Tee8.00 Verlop Tee8.00 Verlop Tee8.00 Verlop Tee8.00 Verlop Tee8.00 Verlop Tee8.00 Verlop Tee8.00 Verlop Tee8.00 Verlop Tee8.00 Verlop Tee8.00 Verlop Tee8.00 Verlop Tee8.00 Verlop Tee8.00 Verlop Tee8.00 Verlop Tee8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00

Page 223: Boq Kosong

Hal : 5

5 6

8.00 43,000.00 8.00 55,000.00 8.00 72,000.00 8.00

110,000.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00

65,000.00 8.00 3 x 78.00 8.00 8.00 8.00 8.00 8.00 8.00

65,000.00 8.00 8.00

35,000.00 8.00 19,000.00 8.00 35,000.00 8.00 19,000.00 8.00

8.00 8.00

18,000.00 8.00 8.00 8.00 8.00 Fox8.00 8.00 8.00

Page 224: Boq Kosong

Hal : 6

5 6

8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00

40,000.00 8.00 75,000.00 8.00

150,000.00 8.00 8.00

3,000.00 8.00 8.00 8.00

125,000.00 8.00 850,000.00 8.00

8.00 10,000.00 8.00

350,000.00 8.00 8.00

225,000.00 8.00

Ende, 2016

0

Kepala Bidang Cipta Karya

Dinas Pekerjaan Umum Kabupaten Ende,

PETRUS BOLI, ST

PENATA TK. I

NIP. 19550314 198302 1 003

Page 225: Boq Kosong
Page 226: Boq Kosong

HARGA DASAR (BASIC PRICE ) & JARAK RATA-RATADARI SUMBER BAHAN (QUARRY)

Tahun Anggaran 2015

No. U R A I A N SAT.

HARGA SURVEY

UD. UD. BUMI CV. SUMBER LOKOBOKO SAMBA PAUPANDA NANGANESA WOLOARE

SLAMET INDAH KASIH (TANJUNG)

PERMAI

(Rp) (Rp) (Rp) (Rp) (Rp) (Rp) (Rp) (Rp)

1 2 3 4 5 6 7 8 9 10 11

I BAHAN BANGUNAN LOKAL

1 Pasir Urug M3 40,000 40,000 2 Pasir Pasang M3 66,667 66,667 3 Pasir Beton M3 66,667 66,667 4 Kerikil Koral 5/7 cm M3 200,000 5 Kerikil Koral 3/5 cm M36 Kerikil Koral 2/3 cm M3 200,000 150,000 7 Kerikil Koral 1/2 cm M38 Koral Beton Split Uk 2-3 cm M39 Koral Beton Split Uk 3-5 cm M310 Batu Kali / Gunung M3 66,666.67 83,333.30 66,666.67 11 Batu Bata Merah Bh 90012 Batako Bh - 3,000 13 Batu Roster 30/30 Bh14 Tanah Urug Biasa M3 4500015 Tanah Urug Pilihan M316 Batu Pecah uk 10 - 15 cm M317 Batu Pecah uk 7 - 10 cm M318 Batu Pecah uk 5 - 7 cm M319 Batu Pecah uk 3 - 5 cm M320 Batu Pecah uk 2 - 3 cm M3 200,000 150,000 21 Batu Pecah uk 1 - 2 cm M322 Batu Pecah uk 0,5 - 1 cm M323 Kerikil dari galian bukit M324 Kerikil sungai ( tidak tersaring ) M325 Kerikil sungai (tersaring) M326 Kerikil pecah tersaring M327 Sirtu M3

Page 227: Boq Kosong

28 Gamping Zak29 Gamping Jawa Kg30 Gedeg Biasa M231 Gedeg Kulit M232 Bambu cincang M233 List plafond kayu Profil M'34 List kaca M'35 Kayu balok kelapa M3 4,000,000 36 Kayu Hutan Kelas II ( balok ) Batu, mahoni M3 3,500,000 3,600,000 3,600,000 37 Kayu Hutan kelas II ( papan ) Batu, mahoni M3 4,000,000 3,800,000 3,900,000 38 Papan nara M3 4,000,000 3,800,000 3,900,000 39 Kayu bayam ( balok ) 6/12 M3 9,500,000 9,000,000 40 Kayu bayam ( papan ) 3/30 M3 10,500,000 10,000,000 41 Kayu untuk perancah M3 2,500,000 2,000,000 43 Usuk kayu kelas II M3 3,600,000 3,600,000 3,200,000 45 Papan kayu ( bouwplank) M346 Papan begisting M3 2,800,000 2,500,000 2,000,000 47 Tali ijuk Ikat48 Ijuk Kg49 Bambu ( Pjg 6 m ) Btg 20,000

Page 228: Boq Kosong

II BAHAN BANGUNAN NON LOKAL

No. U R A I A N SAT.

HARGA SURVEY

TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO

SEJAH USAHA GLORIA SINAR NIRMALA ATAMBUA ALAM WOLOARE

TERA BARU BANGUNAN SUBUR

(Rp) (Rp) (Rp) (Rp) (Rp) (Rp) (Rp) (Rp)

1 2 3 4 5 6 7 8 9 10 11

II BAHAN BANGUNAN NON LOKAL1 Semen abu-abu @ 50 kg Tiga Roda Zak2 Semen abu-abu @ 40 kg Tiga Roda Zak 54,000 52,000 54,000 3 Semen putih @ 50 kg Zak4 Semen putih @ 40 kg Zak 110,000 110,000 110,000 5 Semen Tonasa @ 50 kg Zak6 Semen Tonasa @ 40 kg Zak7 Semen Kupang @ 40 kg Zak8 Semen Gresik @ 50 kg Zak9 Semen Gresik @ 40 kg Zak10 Semen Bosowa @ 50 kg Zak11 Besi beton polos 5 mm pjg 12 m' Btg12 Besi beton polos 6 mm pjg 12 m' Btg 25,000 25,000 25,000 25,000 25,000 13 Besi beton polos 8 mm pjg 12 m' Btg 43,000 47,000 48,000 43,000 14 Besi beton polos 10 mm pjg 12 m' Btg 67,000 69,000 70,000 65,000 15 Besi beton polos 12 mm pjg 12 m' Btg 95,000 93,000 93,000 93,000 95,000 16 Besi beton polos 14 mm pjg 12 m' Btg 130,000 17 Besi beton polos 16 mm pjg 12 m' Btg 165,000 18 Kawat beton / bendral Kg 25,000 20,000 20,000 20,000 ### 20,000 23 Porselint uk. 30 cm x 30 cm Doz 57,000 55,000 ###24 Plint keramik uk. 30 cm x 10 cm Doz25 Plint keramik uk. 40 cm x 10 cm Doz 184,000 185,000 7,400 25 26 Keramik 20 cm x 20 cm Doz 65,000 67,500 27 Keramik 20 cm x 25 cm Doz 75,000 28 Keramik 40 cm x 40 cm Doz 60,000 70,500 86,000 29 Granit 60 cm x 60 cm Doz 220,000 220,000 210,000 30 Plint Granit 60 cm x 10 cm Doz 245,000 240,000 245,000 31 Kaca bening 5 mm M2 135,000 130,000 150,000 130,000 32 Kaca reyben 3 mm M233 Kaca reyben 5 mm M237 Genteng Metal ( Multi Roof ) 0,25 mm Bh 35,000 38 Nok Genteng (Multiroof) 0,25 mm Bh 25,000 25,000 25,000 39 Seng gelombang Bjls uk. 0,30 Lbr 58,000 40 Seng gelombang Warna Bjls uk. 0,20 Lbr 55,000 57,000

Page 229: Boq Kosong

41 Nok seng Bjls 0,20 - 30 cm Lbr/M'42 Nok seng Bjls 0,30 Lbr/M'43 Seng plat Bjls 0,20 Lbr44 Seng plat Bjls 0,30 - 40 cm Lbr/M' 17,500 15,000 25,000 45 Paku biasa 1-3 cm Kg 25,000 20,000 20,000 ### 18,000 46 Paku biasa 5-12 cm Kg 16,000 18,000 15,000 19,000 15,000 47 Paku seng Kg 22,000 20,000 22,000 20,000 48 Paku asbes Kg49 Pipa PVC dia 1/2 " Btg 18000 20000 1900050 Pipa PVC dia 3/4 " Btg51 Pipa PVC dia 1 " Btg 20000 22000 2250048 Pipa PVC dia 2 " Btg 60,000 57,000 35,000 50 Pipa PVC dia 4 " Btg 135,000 90,000 ###51 Pipa GIP Medium A dia 1/2 " Btg 120,000 105,000 52 Kran GIP dia 1/2 " Bh 25,000 15,000 53 Tripleks aluminium uk. Pintu 3mm Lbr 75000 77000 7800054 Tripleks 3 mm Lbr 58,000 60,000 55,000 58,000 55 Tripleks 4 mm Lbr 69,000 66,000 68,000 56 Tripleks 6 mm Lbr 95,000 81,000 57 Tripleks 9 mm Lbr 130,000 135,000 130,000 130,000 140,000 130,000

Page 230: Boq Kosong

No. U R A I A N SAT.

HARGA SURVEY

TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO

SEJAH USAHA GLORIA SINAR NIRMALA ATAMBUA ALAM WOLOARE

TERA BARU BANGUNAN SUBUR

(Rp) (Rp) (Rp) (Rp) (Rp) (Rp) (Rp) (Rp)

1 2 3 4 5 6 7 8 9 10 11

71 Lampu pijar 40 watt Bh 4000 500072 Lampu Philips SL Spiral 24 Watt Bh 70000 72000 70000 7250079 Stop kontak Bh 15000 17500 1500080 Saklar Engkle Bh 15000 17500 1500081 Saklar Ganda Bh 17500 20000 1800081 Kabel 2,5 mm (Fokus) Roll 340000 365000 35000082 Sirap Lbr83 Kawat duri Roll58 Politur Kg 55,000 58,000 47,500 35,000 44,000 59 Amplas Lbr 4,000 5,000 5,000 60 Lem aica aibon Kg 51,000 61 Paku kait Kg62 Paku sumbat Kg63 Paku tripleks Kg64 Teakwood 4 x 8 Lbr38 Teakwood pintu 3 x 7 Lbr 90000 78000 78,000 39 Reservoir air rangka baja 1 m3 Bh40 Sumur pompa air terpasang Bh41 Titik lampu + instalasi Titik42 Stop kontak + Instalasi Titik43 Zekering Cash lokal 1 Group (MCB) Bh 30000 25000 3200044 Zekering Cash lokal 2 Group (MCB) Bh 50000 52000 5000045 Zekering Cash lokal 3 Group (MCB) Bh46 Cat tembok 5 kg Kg39 Cat tembok 1 kg Kg 25,000 20,000 25,000 40 Plamur tembok 5 kg Kg 25,000 40 Plamur tembok 1 kg Kg 15,000 35,000 20,000 41 Plamur kayu Kg42 Cat kayu mengkilap Kg 40,000 53,000 40,000 39,000 43 Dempul kayu Kg 35,000 32,000 30,000 ### 24,000 44 Cat menie Kg 35,000 32,000 25,000 ### 24,000 45 Cat kayu dasar Kg 55,000 48,000 38,000 40,000 45,000 46 Tiner Ltr47 Sirlak Ltr48 Cat Dasar Tembok ( Oker ) Kg 15,500 17,000 17,000 49 Lem kayu Kg 18,000 20,000 - 2000050 Kwas 2 Inc Bh 10,000 6,000 10,000 10000

Page 231: Boq Kosong

Minyak Politur 22,000 20,000 22,500 51 Minyak cat Kg 35,000 25,000 26,000 5500052 Minyak flux Ltr52 Minyak tanah Ltr53 Minyak diesel / solar Ltr54 Minyak bensin / premium Ltr55 Minyak pelumas Ltr 29,900 56 Residu / Oli bekas / Minyak Begisting Kg 5,000 5,000 5,000 ### 5,000 57 Kawat harmonika uk. Lubang 5/5 cm M58 Baja tulangan polos Kg

59 Besi beugel / baut ( pengikat kuda-kuda ) Kg 24,000 25,000

60 Engsel pintu lokal Bh 35,000 25,000 ###

61 Engsel Jendela angin Bh 22,000

62 Grendel Pintu Panjang (Baik) Psg 10,000 15,000 15,000 15,000

63 Grendel Jendela (baik) Psg 20,000 20,000 20,000 20,000

Page 232: Boq Kosong

No. U R A I A N SAT.

HARGA SURVEY

TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO

SEJAH USAHA GLORIA SINAR NIRMALA ATAMBUA ALAM WOLOARE

TERA BARU BANGUNAN SUBUR

(Rp) (Rp) (Rp) (Rp) (Rp) (Rp) (Rp) (Rp)

1 2 3 4 5 6 7 8 9 10 11

64 Kunci tanam kwalitas biasa 2 x putar Bh 80,000 85,000 65 Kunci tanam kwalitas sedang 2 x putar Bh 125,000 150,000 250,000 125,000 66 Kunci tanam kwalitas baik 2 x putar Bh 175,000 150,000 165,000 65 Hak angin Bh 7,500 12,500 5,000 10,000 66 Kloset jongkok keramik ( setara KIA ) Unit 160,000 170,000 67 Kloset duduk mono block ( setara Toto ) Unit 2,500,000 2,500,000 68 Urinoir keramik ( setara KIA ) Unit69 Flour drain (Stainlees Steel) Bh 35,000 40,000 70 Bak cuci tangan wastafel (setara keramik) Bh 670,000 675,000 660,000 71 Bak cuci piring teraso Bh72 Bak cuci piring logam Bh70 Glass Block (Batu Kaca) Bh 30,000 27,000 30,000 28,000 30,000 71 Batu Roster 20/20 cm Bh 8,000 72 Paving Block uk. 10/20 cm Bh 2,250 73 Pipa Penguap dia 1" + Accesories M 75,000 70,000 74 Seal Tape Bh 3,000 4,000 5,000 3,000 75 Kawat Harmonika uk. Lubang 5 cm M2 36,000 37,000 37,500 76 Bh 15,000 20,000 20,000 77 Instalasi Listrik ( Meteran Baru ) Daya 2200 KV Unit78 Tralis pengaman jendela Lis besi strip M279 Pemasangan Meteran PDAM Unit80 Pagar/Relling (Besi Hollow) Stainlees steel M281 Pembuatan garasi rangka pipa GIB M282 Profil Tank Stainles steel 1100 ltr Bh 3,500,000 3,600,000 3,400,000 3,500,000 83 Dinamo air daya isap 20 m Bh 2,000,000 2,000,000 ###84 Penagkal Petir Unit84 Hollow Galvalum 4 x 4 cm Btg 42,000 45,000 85 Hollow Galvalum 2 x 4 cm Btg 30,000 35,000 86 Sekrup Fixer Bh 350 500 400 87 Paku Sekrup Kg 95,000 100,000 110,000

88 List Gibsum minimalis uk 10 cm Toko Pesantenan

Main truss C-60-75 19,000

89 Roof bottom/reng A.33-0.45 750090 Self Drilling screw Dia 10 x 16 x 20 mm Bh 200091 (truss screw)92 Self Drilling screw Dia 12 x 14 x 22 mm Bh 1750

Pipa Penguras Ø 3/4" (PVC Biru)

M1

M1

M1

Page 233: Boq Kosong

93 (roof batten screw)94 Dynabol dia 10 panjang 8 cm Bh 1500

Gambar Design

Kalsi Plank IGGI 0,008/20 cm 30000

III UPAH KERJA1 Pekerja O/H2 Tukang O/H3 Kepala Tukang O/H4 Mandor O/H5 Operator O/H6 Pembantu Operator O/H7 Sopir O/H8 Pembantu Sopir O/H9 Mekanik O/H10 Pembantu Mekanik O/H

IV ALAT BERAT1 Sewa Alat Concrete Mixer 0,3-0,6 M3 Jam2 Sewa Alat Dump Truck 3-4 M3 Jam

Diperiksa

Kepala Perwakilan

Profil Tank Stainles steel 1100 ltrDinamo air daya isap 20 mGlass Block 20/20 cmKeramik 40 cm x 40 cmPlint keramik uk. 40 cm x 10 cmKeramik 20 cm x 25 cmBatu Roster 20/20 cmPaving Block uk. 10/20 cmPipa Gib untuk Penguap/Hawa + accesories

Main truss C-60-75

M2

M1

CV. KONINDO Engineering Consultant

FRANS S. da COSTA, ST

Page 234: Boq Kosong

Roof bottom/reng A.33-0.45Self Drilling screw Dia 10 x 16 x 20 mm (truss screw)Self Drilling screw Dia 12 x 14 x 22 mm (roof batten screw)Dynabol dia 10 panjang 8 cm

Page 235: Boq Kosong

HARGA DASAR (BASIC PRICE ) & JARAK RATA-RATADARI SUMBER BAHAN (QUARRY)

Tahun Anggaran 2015

HARGA SURVEY HARGA HARGA JARAK

KET.KM.8 SK BUPATI NO. Yang Quarry

ARAH 440/KEP/HK/2014 dipakai

TIMUR ENDE TGL.24/11/2014

(Rp) (Rp) (Rp) ( Km )

12 13 15 16

55,000.00 40,000.00 9.00 83,000.00 66,666.67 9.00 83,000.00 66,666.67 9.00

165,000.00 165,000.00 9.00 202,000.00 202,000.00 9.00 257,000.00 200,000.00 9.00 275,000.00 340,000.00 9.00 170,000.00 170,000.00 9.00

76,000.00 76,000.00 9.00 91,000.00 83,333.30 9.00

1,000 1,000.00 1,000.00 9.00 3,000.00 3,000.00 9.00

11,000.00 11,000.00 9.00 55,000.00 55,000.00 9.00 55,000.00 55,000.00 9.00

167,000.00 152,000.00 9.00 270,000.00 245,000.00 9.00

73,000.00 325,000.00 9.00 37,000.00 367,000.00 9.00

202,000.00 200,000.00 9.00 275,000.00 615,000.00 9.00 615,000.00 559,000.00 9.00

74,000.00 74,000.00 9.00 61,000.00 61,000.00 9.00

102,000.00 102,000.00 9.00 193,000.00 193,000.00 9.00 147,000.00 147,000.00 9.00

Page 236: Boq Kosong

25,000.00 25,000.00 9.00 75,000.00 75,000.00 9.00 50,000.00 50,000.00 9.00 60,000.00 60,000.00 9.00 23,000.00 23,000.00 9.00 11,000.00 11,000.00 9.00 6,750.00 6,750.00 9.00

2,200,000.00 2,200,000.00 9.00 3,850,000.00 3,600,000.00 9.00 4,000,000.00 3,800,000.00 9.00 4,550,000.00 4,550,000.00 9.00 9,900,000.00 9,500,000.00 9.00

11,000,000.00 10,500,000.00 9.00 11,805,000.00 2,500,000.00 9.00 3,685,000.00 3,600,000.00 9.00 2,113,000.00 2,113,000.00 9.00 2,750,000.00 2,500,000.00 9.00

6,000.00 6,000.00 9.00 15,000.00 15,000.00 9.00 22,000.00 20,000.00 9.00

Page 237: Boq Kosong

HARGA SURVEY HARGA HARGA JARAK

KET.

BENGKEL SK BUPATI NO. Yang Quarry

ALO TIMBO 440/KEP/HK/2014 dipakai

TGL.24/11/2014

(Rp) (Rp) (Rp) ( Km )

12 13 14 15 16

70,000.00 70,000.00 9.00 63,000.00 52,000.00 9.00

550,000.00 9.00 110,000.00 110,000.00 9.00 70,000.00 70,000.00 9.00 57,000.00 57,000.00 9.00

9.00 70,000.00 70,000.00 9.00 57,000.00 57,000.00 9.00 70,000.00 70,000.00 9.00 20,000.00 20,000.00 9.00 33,000.00 25,000.00 9.00 48,000.00 48,000.00 9.00 70,000.00 70,000.00 9.00

109,000.00 95,000.00 9.00 130,000.00 130,000.00 9.00 165,000.00 165,000.00 9.00

28,000.00 20,000.00 9.00 77,000.00 57,000.00 9.00

179,000.00 179,000.00 9.00 185,000.00 9.00

77,000.00 67,500.00 9.00 70,000.00 70,000.00 9.00 88,000.00 86,000.00 9.00

210,000.00 9.00 245,000.00 9.00

198,000.00 150,000.00 9.00 173,000.00 173,000.00 9.00 202,000.00 202,000.00 9.00

39,000.00 35,000.00 9.00 25,000.00 9.00

63,000.00 58,000.00 9.00 - 57,000.00 9.00

Page 238: Boq Kosong

13,000.00 13,000.00 9.00 25,000.00 25,000.00 9.00 51,000.00 51,000.00 9.00 27,500.00 25,000.00 9.00 30,000.00 25,000.00 9.00 20,000.00 19,000.00 9.00 24,000.00 22,000.00 9.00 24,000.00 24,000.00 9.00 33,000.00 39,000.00 9.00 40,000.00 30,000.00 9.00 50,000.00 22,500.00 9.00

116,000.00 60,000.00 9.00 204,000.00 135,000.00 9.00 297,000.00 120,000.00 9.00

25,000.00 25,000.00 9.00 78,000.00 9.00

63,000.00 58,000.00 9.00 83,000.00 83,000.00 9.00 94,000.00 94,000.00 9.00

149,000.00 140,000.00 9.00

Page 239: Boq Kosong

HARGA SURVEY HARGA HARGA JARAK

KET.

BENGKEL SK BUPATI NO. Yang Quarry

ALO TIMBO 440/KEP/HK/2014 dipakai

TGL.24/11/2014

(Rp) (Rp) (Rp) ( Km )

12 13 14 15 16

12,000.00 5,000.00 9.00 72,500.00 9.00

28,000.00 17,500.00 9.00 17,500.00 17,500.00 9.00 28,000.00 20,000.00 9.00

468,000.00 365,000.00 9.00 3,000.00 3,000.00 9.00

108,000.00 108,000.00 9.00 61,000.00 58,000.00 9.00

6,000.00 5,000.00 9.00 57,000.00 51,000.00 9.00 29,000.00 29,000.00 9.00

145,000.00 145,000.00 9.00 29,000.00 29,000.00 9.00 94,000.00 94,000.00 9.00

110,000.00 70,000.00 9.00 9.00

5,000,000.00 9.00 150,000.00 150,000.00 9.00

28,000.00 28,000.00 9.00 41,000.00 25,000.00 9.00 63,000.00 52,000.00 9.00 41,000.00 41,000.00 9.00 81,000.00 81,000.00 9.00 33,000.00 25,000.00 9.00 64,000.00 64,000.00 9.00 33,000.00 35,000.00 9.00 52,000.00 25,000.00 9.00 47,000.00 53,000.00 9.00 29,000.00 29,000.00 9.00 44,000.00 35,000.00 9.00 56,000.00 55,000.00 9.00 29,000.00 29,000.00 9.00

114,000.00 114,000.00 9.00 76,000.00 17,000.00 9.00 33,000.00 20,000.00 9.00 10,000.00 10,000.00 9.00

Page 240: Boq Kosong

22,500.00 9.00 39,000.00 55,000.00 9.00 26,000.00 26,000.00 9.00

4,000.00 4,000.00 9.00 6,900.00 6,900.00 9.00 7,300.00 7,300.00 9.00

40,000.00 40,000.00 9.00 0.00 5,000.00 9.00

38,000.00 38,000.00 9.00 10,000.00 10,000.00 9.00

25,000.00 25,000.00 9.00

20,000.00 20,000.00 9.00

22,000.00 9.00

14,000.00 14,000.00 9.00

20,000.00 9.00

Page 241: Boq Kosong

HARGA SURVEY HARGA HARGA JARAK

KET.

BENGKEL SK BUPATI Yang Quarry

LAS NO. 152Thn 2012 dipakai

ALO TIMBO TGL. 01/10/2012

(Rp) (Rp) (Rp) ( Km )

12 13 14 15 16

125,000.00 125,000.00 9.00 165,000.00 165,000.00 9.00 202,000.00 175,000.00 9.00

5,000.00 5,000.00 9.00 190,000.00 170,000.00 9.00

1,300,000.00 2,500,000.00 9.00 678,000.00 678,000.00 9.00

25,000.00 40,000.00 9.00 660,000.00 660,000.00 9.00 460,000.00 460,000.00 9.00 489,000.00 489,000.00 9.00

28,000.00 28,000.00 9.00 8,000.00 9.00 2,250.00 9.00

75,000.00 9.00 5,000.00 9.00

37,500.00 9.00 20,000.00 9.00

PLN 3,750,000.00 9.00 225,000.00 9.00

PDAM 2,250,000.00 9.00 800,000 800,000.00 9.00

900,000.00 9.00 3,600,000.00 9.00 2,000,000.00 9.00 4,500,000.00 9.00

45,000.00 9.00 35,000.00 9.00

500.00 9.00 110,000.00 9.00

35,000.00 9.00

19,000.00 9.00

7,500.00 9.00 2,000.00 9.00 - 1,750.00 9.00

Page 242: Boq Kosong

- 1,500.00 9.00

5,000.00 9.00

30,000.00 9.00

50,000.00 50,000.00 80,000.00 80,000.00

100,000.00 100,000.00 70,000.00 70,000.00 80,000.00 80,000.00 60,000.00 60,000.00 7 Jam75,000.00 75,000.00 50,000.00 50,000.00 75,000.00 75,000.00 50,000.00 50,000.00

S 41,120.94 S 264,761.05

Ende, 2016Dibuat

Konstruktor

VERLY EDWIN, ST

Page 243: Boq Kosong
Page 244: Boq Kosong

DAFTAR RETRIBUSI BAHAN GALIAN GOL. CBerdasarkan Surat Keputusan Bupati Ende

Nomor : 152 Tanggal 19 Juni 2012

Lokasi :

1. Kec. Ende Utara

2. Kec. Ende Selatan

3. Kec. Ende Timur

4. Kec. Ende Tengah

No Material SatuanHarga Satuan Pajak

(Rp) 20%

1 2 3 4 5 = 4 x 20%

BAHAN LOKAL

1 Pasir Urug M3 49,000.00 9,800.00

2 Pasir Pasang / Pasir Beton M3 36,000.00 7,200.00

3 Kerikil Koral 5/7 cm M3 103,000.00 20,600.00

4 Kerikil Koral 3/5 cm M3 131,000.00 26,200.00

5 Kerikil Koral 2/3 cm M3 106,000.00 21,200.00

6 Kerikil Koral 1/2 cm M3 328,000.00 65,600.00

7 Koral Beton Split Uk 2-3 cm M3 - -

8 Koral Beton Split Uk 3-5 cm M3 - -

9 Batu Kali / Gunung M3 53,000.00 10,600.00

10 Tanah Urug Biasa M3 42,000.00 8,400.00

11 Tanah Urug Pilihan M3 62,000.00 12,400.00

12 Batu Pecah uk 10 - 15 cm M3 151,000.00 30,200.00

13 Batu Pecah uk 7 - 10 cm M3 295,000.00 59,000.00

14 Batu Pecah uk 5 - 7 cm M3 321,000.00 64,200.00

15 Batu Pecah uk 3 - 5 cm M3 124,000.00 24,800.00

16 Batu Pecah uk 2 - 3 cm M3 142,000.00 28,400.00

17 Batu Pecah uk 1 - 2 cm M3 142,000.00 28,400.00

18 Batu Pecah uk 0,5 - 1 cm M3 551,000.00 110,200.00

19 Kerikil dari galian bukit M3 72,000.00 14,400.00

20 Kerikil sungai ( tidak tersaring ) M3 61,000.00 12,200.00

21 Kerikil sungai (tersaring) M3 101,000.00 20,200.00

22 Kerikil pecah tersaring M3 191,000.00 38,200.00

23 Sirtu M3 61,000.00 12,200.00

24 Filler M3 - -

25 Gamping M3 15,000.00 3,000.00

26 Gamping Jawa M3 -

Page 245: Boq Kosong

DAFTAR RETRIBUSI BAHAN GALIAN GOL. CBerdasarkan Surat Keputusan Bupati Ende

Nomor : 152 Tanggal 19 Juni 2012

Jumlah Harga

(Rp)

6

58,800.00

43,200.00

123,600.00

157,200.00

127,200.00

393,600.00

-

-

63,600.00

50,400.00

74,400.00

181,200.00

354,000.00

385,200.00

148,800.00

170,400.00

170,400.00

661,200.00

86,400.00

73,200.00

121,200.00

229,200.00

73,200.00

-

18,000.00

Page 246: Boq Kosong

URAIAN ANALISA ALAT

No. U R A I A N KODE KOEF. SATUAN

A. URAIAN PERALATAN 1. Jenis Peralatan CONCRETE MIXER 0.3-0.6 M3 2. Tenaga Pw 15.0 HP 3. Kapasitas Cp 500.0 Liter 4. Alat Baru : a. Umur Ekonomis A 4.0 Tahun

b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam c. Harga Alat B 9,200,000 Rupiah

5. Alat Yang Dipakai : a. Umur Ekonomis A' 4.0 Tahun b. Jam Kerja Dalam 1 Tahun W' 2,000.0 Jam c. Harga Alat (*) B' 9,200,000 Rupiah

B. BIAYA PASTI PER JAM KERJA 1. Nilai Sisa Alat = 10 % x B C 920,000 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A' D 0.38629 -(1 + i)^A' - 1

3. Biaya Pasti per Jam :a. Biaya Pengembalian Modal = ( B' - C ) x D E 1,599.24 Rupiah

W'

b. Asuransi, dll = 0.002 x B' F 9.20 RupiahW'

Biaya Pasti per Jam = ( E + F ) G 1,608.44 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms H 12,611.32 Rupiah

2. Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x Mp I 6,000.00 Rupiah

3. Perawatan dan (12,5 % - 17,5 %) x B K 575.00 Rupiah perbaikan = W'

4. Operator = ( 1 Orang / Jam ) x U1 L 11,428.57 Rupiah 5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 8,571.43 Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P 39,186.32 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 41,120.94 Rupiah

E. LAIN - LAIN 1. Tingkat Suku Bunga i 20.00 % / Tahun 2. Upah Operator U1 11,428.57 Rp./Jam 3. Upah Pembantu Operator U2 8,571.43 Rp./Jam 4. Bahan Bakar Bensin Mb 7,300.00 Liter 5. Bahan Bakar Solar Ms 6,900.00 Liter 6. Minyak Pelumas Mp 40,000.00 Liter 7. PPN diperhitungkan pada lembar Rekapitulasi

Biaya Pekerjaan

Page 247: Boq Kosong

URAIAN ANALISA ALAT

No. U R A I A N KODE KOEF. SATUAN

A. URAIAN PERALATAN 1. Jenis Peralatan DUMP TRUCK 3-4 M3 2. Tenaga Pw 130.0 HP 3. Kapasitas Cp 3.3 Ton 4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun

b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam c. Harga Alat B 386,870,000 Rupiah

5. Alat Yang Dipakai : a. Umur Ekonomis A' 5.0 Tahun b. Jam Kerja Dalam 1 Tahun W' 2,000.0 Jam c. Harga Alat (*) B' 386,870,000 Rupiah

B. BIAYA PASTI PER JAM KERJA 1. Nilai Sisa Alat = 10 % x B C 38,687,000 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A' D 0.33438 -(1 + i)^A' - 1

3. Biaya Pasti per Jam :a. Biaya Pengembalian Modal = ( B' - C ) x D E 58,212.66 Rupiah

W'

b. Asuransi, dll = 0.002 x B' F 386.87 RupiahW'

Biaya Pasti per Jam = ( E + F ) G 58,599.53 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms H 112,125.00 Rupiah

2. Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x Mp I 52,000.00 Rupiah

3. Perawatan dan (12,5 % - 17,5 %) x B K 24,179.38 Rupiah perbaikan = W'

4. Operator = ( 1 Orang / Jam ) x U1 L 10,714.29 Rupiah 5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 7,142.86 Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P 206,161.52 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 264,761.05 Rupiah

E. LAIN - LAIN 1. Tingkat Suku Bunga i 20.00 % / Tahun 2. Upah Sopir U1 10,714.29 Rp./Jam 3. Upah Pembantu Sopir U2 7,142.86 Rp./Jam 4. Bahan Bakar Bensin Mb 7,300.00 Liter 5. Bahan Bakar Solar Ms 6,900.00 Liter 6. Minyak Pelumas Mp 40,000.00 Liter 7. PPN diperhitungkan pada lembar Rekapitulasi

Biaya Pekerjaan

Page 248: Boq Kosong

URAIAN ANALISA ALAT

KET.

E.06

Alat BaruAlat BaruAlat Baru

Page 249: Boq Kosong

URAIAN ANALISA ALAT

KET.

E.08

Alat BaruAlat BaruAlat Baru

Page 250: Boq Kosong

PEMERINTAH KABUPATEN ENDE

DINAS PEKERJAAN UMUMJalan Banteng No. 1 Telp. (0381) 21040 - 23167 Ende

PENETAPAN STANDAR HARGABAHAN DAN UPAH KERJATAHUN ANGGARAN 2009

BIDANG CIPTA KARYAJalan Banteng No. 1 Telp. (0381) 21040 - 23167 Ende

Page 251: Boq Kosong

PRICE LIST PIPA PE DAN ACCESSORIES

No. Uraian Satuan Harga Satuan Keterangan Rp

1. 2. 4. 5. 6.

I PIPA HDPE (90 MM) PN.12,5 - SDR. 13,6

1. Pipa HDPE Dia 90 mm M '

2. Coupling HDPE Dia 90 mm Buah

3. Reduser Coupling HDPE Dia 90 mm x Dia 63 mm Buah

4. Elbow HDPE Dia 90 mm Buah

5. Tee HDPE Dia 90 mm x Dia 63 mm Buah

II. PIPA HDPE (63 MM) PN.12,5 - SDR. 13,6

1. Pipa HDPE Dia 63 mm M '

2. Coupling HDPE Dia 63 mm Buah

3. Reduser Coupling HDPE Dia 63 mm x Dia 50 mm Buah

4. Elbow HDPE Dia 63 mm Buah

5. Tee HDPE Dia 63 mm x Dia 50 mm Buah

III. PIPA HDPE (50 MM) PN.12,5 - SDR. 13,6

1. Pipa HDPE Dia 50 mm M '

2. Coupling HDPE Dia 50 mm Buah

3. Reduser Coupling HDPE Dia 50 mm x Dia 45 mm Buah

4. Elbow HDPE Dia 50 mm Buah

5. Tee HDPE Dia 50 mm x Dia 45 mm Buah

IV. PIPA HDPE (45 MM) PN.12,5 - SDR. 13,6

1. Pipa HDPE Dia 45 mm M '

2. Coupling HDPE Dia 45 mm Buah

3. Reduser Coupling HDPE Dia 45 mm x Dia 20 mm Buah

4. Elbow HDPE Dia 45 mm Buah

5. Tee HDPE Dia 45 mm x Dia 20 mm Buah

Page 252: Boq Kosong

DAFTAR HARGA SAMBUNGAN PIPA

No. Nama Barang 1/2" 3/4" 1" 1 1/4" 1 1/2" 2" 2 1/2" 3" 4" 5" 6" Keterangan Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp

1. 2. 3. 4. 5. 6.

1 3,960 5,590 8,155 13,050 16,310 25,630 48,930 74,560 135,140 372,800 535,900

2 4,195 6,290 9,320 15,145 18,640 27,960 58,250 88,540 151,450 442,700 512,600

3 Tee 4,890 7,225 11,420 17,245 21,900 32,620 74,560 97,860 177,080 629,100

4 7,920 10,720 15,845 25,630 34,950 53,590 109,510 158,440 326,200

5 Union 13,280 16,310 19,805 27,950 37,280 53,590 93,200 146,790 279,600 629,100

6 Nipple 3,495 4,660 6,525 9,555 13,280 18,175 30,290 51,260 81,550 174,750 302,900

7 Sock 3,260 4,195 6,990 9,790 12,120 18,640 34,950 51,260 83,880 198,050 256,300

8 Plug 2,795 3,495 4,660 6,990 8,155 11,650 23,300 32,620 58,250 174,750

9 Cap 3,260 3,960 5,590 8,155 10,720 14,915 30,290 41,940 69,900 233,000

10 Round Flens 39,610 83,880 128,150 233,000

11 Cross 11,875 16,625 22,565 33,250 45,125 61,750 118,750 166,250 308,760

12 Lock Nut 3,090 3,090 3,800

13 Ext. Price 7,125 8,310 11,875

14 Red Tee 9,550 14,680 22,135 27,960 39,610 81,550 116,500 221,350 807,500

15 Red Sock 5,590 7,455 10,950 13,050 19,805 37,280 58,250 107,180 285,000

16 Bushing 3,960 5,825 9,320 10,950 15,145 25,630 37,280 69,900 199,500

17 Red Elbow 6,755 10,250 16,545 20,505 30,290

18 Red Nipple 5,825 8,390 13,980 17,475 25,630

19 Red T Knee 32,620

20 Sreet Elbow 4,750 6,890 10,215

Elbow 900

Elbow 450

Bend 900

Page 253: Boq Kosong

DAFTAR HARGA ACCESSORIES PIPA

No. Nama Barang Ukuran Satuan Harga Satuan Keterangan Rp

1. 2. 3. 4. 5. 6.

1 Flange Blind 2" Buah Flange Blind 3" Buah Flange Blind 4" Buah Flange Blind 6" Buah Flange Blind 8" Buah Flange Blind 10" Buah Flange Blind 12" Buah Flange Blind 14" Buah Flange Blind 16" Buah

2 2" Buah

3" Buah

4" Buah

6" Buah

8" Buah

10" Buah

12" Buah

14" Buah

16" Buah

3 2" Buah

3" Buah

4" Buah

6" Buah

8" Buah

10" Buah

12" Buah

14" Buah

16" Buah

4 2" Buah

3" Buah

4" Buah

6" Buah

8" Buah

10" Buah

12" Buah

14" Buah

16" Buah

5 2" Buah

3" Buah

4" Buah

6" Buah

8" Buah

10" Buah

12" Buah

14" Buah

16" Buah

Bend All Flange 11.250

Bend All Flange 11.250

Bend All Flange 11.250

Bend All Flange 11.250

Bend All Flange 11.250

Bend All Flange 11.250

Bend All Flange 11.250

Bend All Flange 11.250

Bend All Flange 11.250

Bend All Flange 22.50

Bend All Flange 22.50

Bend All Flange 22.50

Bend All Flange 22.50

Bend All Flange 22.50

Bend All Flange 22.50

Bend All Flange 22.50

Bend All Flange 22.50

Bend All Flange 22.50

Bend All Flange 450

Bend All Flange 450

Bend All Flange 450

Bend All Flange 450

Bend All Flange 450

Bend All Flange 450

Bend All Flange 450

Bend All Flange 450

Bend All Flange 450

Bend All Flange 900

Bend All Flange 900

Bend All Flange 900

Bend All Flange 900

Bend All Flange 900

Bend All Flange 900

Bend All Flange 900

Bend All Flange 900

Bend All Flange 900

Page 254: Boq Kosong

No. Nama Barang Ukuran Satuan Harga Satuan Keterangan Rp

1. 2. 3. 4. 5. 6.

6 Tee All Flange 2" x 2" Buah

Tee All Flange 3" x 2" Buah

Tee All Flange 4" x 2" Buah

Tee All Flange 3" x 3" Buah

Tee All Flange 4" x 3" Buah

Tee All Flange 6" x 2" Buah

Tee All Flange 6" x 3" Buah

Tee All Flange 8" x 2" Buah

Tee All Flange 8" x 2" Buah

Tee All Flange 6" x 4" Buah

Tee All Flange 6" x 6" Buah

Tee All Flange 6" x 3" Buah

Tee All Flange 6" x 4" Buah

Tee All Flange 8" x 6" Buah

Tee All Flange 8" x 8" Buah

Tee All Flange 10" x 2" Buah

Tee All Flange 10" x 4" Buah

Tee All Flange 10" x 2" Buah

Tee All Flange 10" x 6" Buah

Tee All Flange 10" x 8" Buah

Tee All Flange 10" x 10" Buah

Tee All Flange 12" x 2" Buah

Tee All Flange 12" x 3" Buah

Tee All Flange 12" x 4" Buah

Tee All Flange 12" x 6" Buah

Tee All Flange 12" x 8" Buah

Tee All Flange 12" x 10" Buah

Tee All Flange 12" x 12" Buah

Tee All Flange 14" x 12" Buah

Tee All Flange 14" x 14" Buah

Tee All Flange 16" x 2" Buah

Tee All Flange 16" x 3" Buah

Tee All Flange 16" x 4" Buah

Tee All Flange 16" x 6" Buah

Tee All Flange 16" x 8" Buah

Tee All Flange 16" x 10" Buah

Tee All Flange 16" x 12" Buah

Tee All Flange 16" x 14" Buah

Tee All Flange 16" x 16" Buah

7 Street Box 2" Buah

Street Box 3" Buah

Street Box 4" Buah

Street Box 6" Buah

Street Box 8" Buah

Street Box 10" Buah

Street Box 12" Buah

Page 255: Boq Kosong

No. Nama Barang Ukuran Satuan Harga Satuan Keterangan Rp

1. 2. 3. 4. 5. 6.

8 Clamp Sadle 1" x 1/2" Buah Clamp Sadle 2" x 1/2" - 2" x 3/4" Buah Clamp Sadle 2" x 1" Buah Clamp Sadle 3" x 1/2" - 3" x 3/4" Buah Clamp Sadle 3" x 1" Buah Clamp Sadle 3" x 2" Buah Clamp Sadle 4" x 1/2" - 4" x 3/4" Buah Clamp Sadle 4" x 1" Buah Clamp Sadle 4" x 2" Buah Clamp Sadle 6" x 1/2" - 6" x 3/4" Buah Clamp Sadle 6" x 1" Buah Clamp Sadle 6" x 2" Buah Clamp Sadle 8" x 1" Buah Clamp Sadle 8" x 2" Buah Clamp Sadle 10" x 1" Buah Clamp Sadle 10" x 2" Buah Clamp Sadle 10" x 3" Buah Clamp Sadle 12" x 1" Buah Clamp Sadle 12" x 2" Buah Clamp Sadle 12" x 3" Buah Clamp Sadle 12" x 4" Buah Clamp Sadle 12" x 6" Buah

9 Clamp Sadle ACP 3" x 1/2" - 3" x 3/4" Buah Clamp Sadle ACP 3" x 1 1/2" Buah Clamp Sadle ACP 4" x 1/2" - 4" x 3/4" Buah Clamp Sadle ACP 4" x 2" Buah Clamp Sadle ACP 6" x 1/2" - 6" x 3/4" Buah Clamp Sadle ACP 6" x 2" Buah Clamp Sadle ACP 8" x 1/2" Buah Clamp Sadle ACP 8" x 2" Buah Clamp Sadle ACP 10" x 1/2" Buah Clamp Sadle ACP 10" x 2" Buah Clamp Sadle ACP 10" x 3" Buah Clamp Sadle ACP 12" x 1/2" Buah Clamp Sadle ACP 12" x 2" Buah Clamp Sadle ACP 12" x 3" Buah

10 Giboult Joint 1" BuahGiboult Joint 1 1/2" BuahGiboult Joint 2" BuahGiboult Joint 3" BuahGiboult Joint 4" BuahGiboult Joint 6" BuahGiboult Joint 8" BuahGiboult Joint 10" BuahGiboult Joint 12" BuahGiboult Joint 14" BuahGiboult Joint 16" Buah

11 Giboult Joint ACP 1" BuahGiboult Joint ACP 1 1/2" BuahGiboult Joint ACP 2" BuahGiboult Joint ACP 3" BuahGiboult Joint ACP 4" BuahGiboult Joint ACP 6" BuahGiboult Joint ACP 8" BuahGiboult Joint ACP 10" BuahGiboult Joint ACP 12" BuahGiboult Joint ACP 14" BuahGiboult Joint ACP 16" Buah

Page 256: Boq Kosong

No. Nama Barang Ukuran Satuan Harga Satuan Keterangan Rp

1. 2. 3. 4. 5. 6.

12 Air Valve 3/4" BuahAir Valve 1" BuahAir Valve 2" BuahAir Valve 3" BuahAir Valve 4" Buah

13 Double Air Valve 3/4" BuahDouble Air Valve 1" BuahDouble Air Valve 2" BuahDouble Air Valve 3" BuahDouble Air Valve 4" Buah

14 Flange Las 2" BuahFlange Las 3" BuahFlange Las 4" BuahFlange Las 6" BuahFlange Las 8" BuahFlange Las 10" BuahFlange Las 12" BuahFlange Las 14" Buah

Ende, Januari 2010Disetujui : Disurvey oleh :

Kepala Bidang Cipta Karya Staf Teknik Bidang Cipta KaryaDinas Pekerjaan Umum Kab. Ende, Dinas Pekerjaan Umum Kab. Ende,

PETRUS BOLI, ST …………………………….PENATA TK. I NIP.

NIP. 19550314 198302 1 003

Mengetahui :Pj. Kepala Dinas Pekerjaan Umum

Kabupaten Ende,

Ir. L. Y. V. MARIOPEMBINA

NIP. 19620323 199211 1 002

Page 257: Boq Kosong

DAFTAR HARGA ACCESSORIES PIPA

Keterangan

6.

Page 258: Boq Kosong

Keterangan

6.

Page 259: Boq Kosong

Keterangan

6.

Page 260: Boq Kosong

Keterangan

6.

Mengetahui :Pj. Kepala Dinas Pekerjaan Umum

Kabupaten Ende,

Ir. L. Y. V. MARIOPEMBINA

NIP. 19620323 199211 1 002

Page 261: Boq Kosong

DAFTAR HARGA ACCESSORIES GI

No. Nama Barang Ukuran Satuan Harga Satuan Keterangan Rp

1. 2. 3. 4. 5. 6.

1 Flange Blind 2" Buah 37,812.60 Flange Blind 3" Buah 66,000.00 Flange Blind 4" Buah 79,062.50 Flange Blind 6" Buah 127,187.50 Flange Blind 8" Buah 173,937.60 Flange Blind 10" Buah 206,250.00 Flange Blind 12" Buah 556,875.00 Flange Blind 14" Buah 632,500.00 Flange Blind 16" Buah 948,750.00

2 2" Buah 122,312.50

3" Buah 130,937.50

4" Buah 175,937.50

6" Buah 302,187.50

8" Buah 337,000.00

10" Buah 701,875.00

12" Buah 878,500.00

14" Buah 1,058,125.00

16" Buah 1,295,000.00

3 2" Buah 121,250.00

3" Buah 130,937.50

4" Buah 190,625.00

6" Buah 310,812.50

8" Buah 434,562.50

10" Buah 593,126.00

12" Buah 768,750.00

14" Buah 1,137,500.00

16" Buah 1,562,500.00

4 2" Buah 122,500.00

3" Buah 162,500.00

4" Buah 210,000.00

6" Buah 350,000.00

8" Buah 526,000.00

10" Buah 612,500.00

12" Buah 787,500.00

14" Buah 1,156,250.00

16" Buah 1,812,500.00

5 2" Buah 131,250.00

3" Buah 206,250.00

4" Buah 243,750.00

6" Buah 468,750.00

8" Buah 556,250.00

10" Buah 781,250.00

12" Buah 1,375,000.00

14" Buah 1,531,250.00

16" Buah 1,687,500.00

Bend All Flange 11.250

Bend All Flange 11.250

Bend All Flange 11.250

Bend All Flange 11.250

Bend All Flange 11.250

Bend All Flange 11.250

Bend All Flange 11.250

Bend All Flange 11.250

Bend All Flange 11.250

Bend All Flange 22.50

Bend All Flange 22.50

Bend All Flange 22.50

Bend All Flange 22.50

Bend All Flange 22.50

Bend All Flange 22.50

Bend All Flange 22.50

Bend All Flange 22.50

Bend All Flange 22.50

Bend All Flange 450

Bend All Flange 450

Bend All Flange 450

Bend All Flange 450

Bend All Flange 450

Bend All Flange 450

Bend All Flange 450

Bend All Flange 450

Bend All Flange 450

Bend All Flange 900

Bend All Flange 900

Bend All Flange 900

Bend All Flange 900

Bend All Flange 900

Bend All Flange 900

Bend All Flange 900

Bend All Flange 900

Bend All Flange 900

Page 262: Boq Kosong

No. Nama Barang Ukuran Satuan Harga Satuan Keterangan Rp

1. 2. 3. 4. 5. 6.

6 Tee All Flange 2" x 2" Buah 178,760.00

Tee All Flange 3" x 2" Buah 240,625.00

Tee All Flange 4" x 2" Buah 268,125.00

Tee All Flange 3" x 3" Buah 270,875.00

Tee All Flange 4" x 3" Buah 309,375.00

Tee All Flange 6" x 2" Buah 378,125.00

Tee All Flange 6" x 3" Buah 405,625.00

Tee All Flange 8" x 2" Buah 481,250.00

Tee All Flange 8" x 2" Buah 1,687,500.00

Tee All Flange 6" x 4" Buah 515,825.00

Tee All Flange 6" x 6" Buah 612,500.00

Tee All Flange 6" x 3" Buah 618,750.00

Tee All Flange 6" x 4" Buah 653,125.00

Tee All Flange 8" x 6" Buah 708,125.00

Tee All Flange 8" x 8" Buah 752,812.50

Tee All Flange 10" x 2" Buah 773,437.50

Tee All Flange 10" x 4" Buah 831,875.00

Tee All Flange 10" x 2" Buah 907,500.00

Tee All Flange 10" x 6" Buah 937,750.00

Tee All Flange 10" x 8" Buah 1,093,750.00

Tee All Flange 10" x 10" Buah 1,187,500.00

Tee All Flange 12" x 2" Buah 975,000.00

Tee All Flange 12" x 3" Buah 993,750.00

Tee All Flange 12" x 4" Buah 1,062,500.00

Tee All Flange 12" x 6" Buah 1,155,000.00

Tee All Flange 12" x 8" Buah 168,750.00

Tee All Flange 12" x 10" Buah 1,375,000.00

Tee All Flange 12" x 12" Buah 1,500,000.00

Tee All Flange 14" x 12" Buah 1,931,250.00

Tee All Flange 14" x 14" Buah 2,062,500.00

Tee All Flange 16" x 2" Buah 1,606,250.00

Tee All Flange 16" x 3" Buah 1,746,875.00

Tee All Flange 16" x 4" Buah 1,862,500.00

Tee All Flange 16" x 6" Buah 2,068,750.00

Tee All Flange 16" x 8" Buah 2,343,750.00

Tee All Flange 16" x 10" Buah 2,687,500.00

Tee All Flange 16" x 12" Buah 2,812,500.00

Tee All Flange 16" x 14" Buah 3,206,250.00

Tee All Flange 16" x 16" Buah 3,481,250.00

7 Street Box 2" Buah 39,375.00

Street Box 3" Buah 48,300.00

Street Box 4" Buah 70,312.50

Street Box 6" Buah 98,437.50

Street Box 8" Buah 360,000.00

Street Box 10" Buah 420,000.00

Street Box 12" Buah 526,500.00

Page 263: Boq Kosong

No. Nama Barang Ukuran Satuan Harga Satuan Keterangan Rp

1. 2. 3. 4. 5. 6.

8 Clamp Sadle 1" x 1/2" Buah 15,625.00 Clamp Sadle 2" x 1/2" - 2" x 3/4" Buah 18,562.50 Clamp Sadle 2" x 1" Buah 19,375.00 Clamp Sadle 3" x 1/2" - 3" x 3/4" Buah 28,437.50 Clamp Sadle 3" x 1" Buah 29,452.50 Clamp Sadle 3" x 2" Buah 61,875.00 Clamp Sadle 4" x 1/2" - 4" x 3/4" Buah 30,468.75 Clamp Sadle 4" x 1" Buah 48,125.00 Clamp Sadle 4" x 2" Buah 66,250.00 Clamp Sadle 6" x 1/2" - 6" x 3/4" Buah 71,093.75 Clamp Sadle 6" x 1" Buah 76,250.00 Clamp Sadle 6" x 2" Buah 91,406.25 Clamp Sadle 8" x 1" Buah 126,875.00 Clamp Sadle 8" x 2" Buah 142,187.50 Clamp Sadle 10" x 1" Buah 203,125.00 Clamp Sadle 10" x 2" Buah 233,593.75 Clamp Sadle 10" x 3" Buah 243,760.00 Clamp Sadle 12" x 1" Buah 341,250.00 Clamp Sadle 12" x 2" Buah 355,468.75 Clamp Sadle 12" x 3" Buah 365,625.00 Clamp Sadle 12" x 4" Buah 466,250.00 Clamp Sadle 12" x 6" Buah 562,500.00

9 Clamp Sadle ACP 3" x 1/2" - 3" x 3/4" Buah 42,698.25 Clamp Sadle ACP 3" x 1 1/2" Buah 65,626.00 Clamp Sadle ACP 4" x 1/2" - 4" x 3/4" Buah 48,750.00 Clamp Sadle ACP 4" x 2" Buah 71,875.00 Clamp Sadle ACP 6" x 1/2" - 6" x 3/4" Buah 85,000.00 Clamp Sadle ACP 6" x 2" Buah 96,000.00 Clamp Sadle ACP 8" x 1/2" Buah 143,750.00 Clamp Sadle ACP 8" x 2" Buah 146,875.00 Clamp Sadle ACP 10" x 1/2" Buah 150,000.00 Clamp Sadle ACP 10" x 2" Buah 239,375.00 Clamp Sadle ACP 10" x 3" Buah 256,250.00 Clamp Sadle ACP 12" x 1/2" Buah 356,250.00 Clamp Sadle ACP 12" x 2" Buah 368,750.00 Clamp Sadle ACP 12" x 3" Buah 387,500.00

10 Giboult Joint 1" Buah 31,250.00Giboult Joint 1 1/2" Buah 53,250.00Giboult Joint 2" Buah 60,625.00Giboult Joint 3" Buah 89,375.00Giboult Joint 4" Buah 130,937.50Giboult Joint 6" Buah 206,250.00Giboult Joint 8" Buah 281,250.00Giboult Joint 10" Buah 406,250.00Giboult Joint 12" Buah 575,000.00Giboult Joint 14" Buah 700,000.00Giboult Joint 16" Buah 975,000.00

11 Giboult Joint ACP 1" Buah 35,937.50Giboult Joint ACP 1 1/2" Buah 61,237.50Giboult Joint ACP 2" Buah 69,718.75Giboult Joint ACP 3" Buah 119,375.00Giboult Joint ACP 4" Buah 156,250.00Giboult Joint ACP 6" Buah 237,187.50Giboult Joint ACP 8" Buah 323,437.50Giboult Joint ACP 10" Buah 467,187.50Giboult Joint ACP 12" Buah 646,875.00Giboult Joint ACP 14" Buah 747,500.00Giboult Joint ACP 16" Buah 1,078,125.00

Page 264: Boq Kosong

No. Nama Barang Ukuran Satuan Harga Satuan Keterangan Rp

1. 2. 3. 4. 5. 6.

12 Air Valve 3/4" Buah 112,500.00Air Valve 1" Buah 121,250.00Air Valve 2" Buah 437,500.00Air Valve 3" Buah 531,250.00Air Valve 4" Buah 593,750.00

13 Double Air Valve 3/4" Buah 250,000.00Double Air Valve 1" Buah 287,500.00Double Air Valve 2" Buah 1,031,250.00Double Air Valve 3" Buah 1,062,500.00Double Air Valve 4" Buah 1,500,000.00

14 Flange Las 2" Buah 40,200.00Flange Las 3" Buah 51,000.00Flange Las 4" Buah 63,000.00Flange Las 6" Buah 115,800.00Flange Las 8" Buah 154,800.00Flange Las 10" Buah 231,000.00Flange Las 12" Buah 244,800.00Flange Las 14" Buah 477,600.00

Page 265: Boq Kosong

DAFTAR HARGA ACCESSORIES GI

Keterangan

6.

Page 266: Boq Kosong

Hal. 2.Keterangan

6.

Page 267: Boq Kosong

Hal. 3.Keterangan

6.

Page 268: Boq Kosong

Hal. 4.Keterangan

6.

Page 269: Boq Kosong

DAFTAR HARGA ACCESORIS PIPA PE

No. Nama Barang Ukuran Harga Keterangan (MM) Satuan

1. 2. 3. 4. 5.

1 Female Threaded AdaptorOD 40 x 1.1/4"OD 50 x 1.1/2"

OD 63 x 2"OD 75 x 2 .1/2

OD 90 x 3"OD 110 x 4"

2 Female Threaded ElbowOD 40 x 1.1/4"OD 50 x 1.1/2"

OD 63 x 2"OD 75 x 2 .1/2

OD 90 x 3"OD 110 x 4"

3 End Cap OD 40 mmOD 50 mmOD 63 mmOD 75 mmOD 90 mmOD 110 mm

4 Equa Tee OD 40 mmOD 50 mmOD 63 mmOD 75 mmOD 90 mmOD 110 mm

5 Reducing Coupler OD 40 x 32 mmOD 50 x 32 mmOD 50 x 40 mmOD 63 x 32 mmOD 63 x 40 mmOD 63 x 50 mmOD 75 x 50 mmOD 75 x 63 mmOD 90 x 63 mmOD 90 x 75 mmOD 110 x 90 mm

6 Reducing Tee OD 40 x 32 mmOD 50 x 32 mmOD 50 x 40 mmOD 63 x 50 mmOD 110 x 63 mmOD 110 x 75 mmOD 110 x 90 mm

Page 270: Boq Kosong

DAFTAR HARGA

COMPPRESSION FITTING UNTUK PIPA PE PN 10

PT RUSLI VINILON SAKTI

Tanggal, 24 Nopember 2008

No. Nama Barang Ukuran Harga Keterangan (MM) Satuan

1. 2. 3. 4. 5.

1 Female Threaded AdaptorOD 40 x 1.1/4" 20,400OD 50 x 1.1/2" 27,600

OD 63 x 2" 46,200OD 75 x 2 .1/2 56,700

OD 90 x 3" 106,100OD 110 x 4" 341,200

2 Female Threaded ElbowOD 40 x 1.1/4" 27,800OD 50 x 1.1/2" 31,500

OD 63 x 2" 64,600OD 75 x 2 .1/2 66,500

OD 90 x 3" 170,700OD 110 x 4" 701,300

3 End Cap OD 40 mm 20,800OD 50 mm 24,400OD 63 mm 32,000OD 75 mm 52,400OD 90 mm 107,200OD 110 mm 323,600

4 Equa Tee OD 40 mm 69,500OD 50 mm 71,900OD 63 mm 109,700OD 75 mm 134,700OD 90 mm 329,100OD 110 mm 695,900

5 Reducing Coupler OD 40 x 32 mm 36,000OD 50 x 32 mm 40,000OD 50 x 40 mm 42,700OD 63 x 32 mm 46,300OD 63 x 40 mm 57,300OD 63 x 50 mm 57,300OD 75 x 50 mm 70,600OD 75 x 63 mm 79,300OD 90 x 63 mm 182,800OD 90 x 75 mm 200,300OD 110 x 90 mm 421,100

6 Reducing Tee OD 40 x 32 mm 59,700OD 50 x 32 mm 65,500OD 50 x 40 mm 65,500OD 63 x 50 mm 80,600OD 110 x 63 mm 799,200OD 110 x 75 mm 799,200OD 110 x 90 mm 799,200

Page 271: Boq Kosong

DAFTAR HARGA ACCESORIS PIPA PE

No. Nama Barang Ukuran Harga Keterangan (MM) Satuan

1. 2. 3. 4. 5.

1 Straight Coupling CompressionOD 40 mmOD 50 mmOD 63 mmOD 75 mmOD 90 mmOD 110 mm

2 Clamp SaddleOD 63 x 1"

OD 63 x 1 1/4"OD 75 x 1"

OD 90 x 1" sOD 90 x 1.1/4"

OD 90 x 2"OD 110 x 1"

OD 110 x 1/1/4"OD 110 x 2"OD 160 x 1"

OD 160 x 1.1/4"

3 Ferrule Threaded With Knife Dia 1.1/4" x 3/4"

4 Ferrule Compression Joint With Knife Dia 1.1/4" x 25 mm

5 Male Threaded AdaptorOD 40 x 1.1/4"OD 50 x 1.1/2"

OD 53 x 2"OD 75 x 2 1/2"

OD 90 x 3"OD 110 x 4"

6OD 4 x 1.1/4"

OD 50 x 1.1/2"OD 63 x 2"

OD 75 x 2.1/2"OD 90 x 3"OD 110 x 4"

7OD 25 mmOD 40 mmOD 50 mmOD 63 mmOD 75 mmOD 90 mmOD 110 mm

Male Elbow 90c

Elbow 90c

Page 272: Boq Kosong

DAFTAR HARGA

COMPPRESSION FITTING UNTUK PIPA PE PN 10

PT RUSLI VINILON SAKTI

Tanggal, 05 Nopember 2007

No. Nama Barang Ukuran Harga Keterangan (MM) Satuan

1. 2. 3. 4. 5.

1 Straight Coupling CompressionOD 40 mm 43,800OD 50 mm 49,300OD 63 mm 75,200OD 75 mm 95,100OD 90 mm 213,400OD 110 mm 594,600

2 Clamp SaddleOD 63 x 1" 22,900

OD 63 x 1 1/4" 29,500OD 75 x 1" 37,200

OD 90 x 1" s 41,200OD 90 x 1.1/4" 59,100

OD 90 x 2" 63,200OD 110 x 1" 76,600

OD 110 x 1/1/4" 76,600OD 110 x 2" 76,600OD 160 x 1" 104,700

OD 160 x 1.1/4" 124,600

3 Ferrule Threaded With Knife Dia 1.1/4" x 3/4" 107,400

4 Ferrule Compression Joint With Knife Dia 1.1/4" x 25 mm 109,400

5 Male Threaded AdaptorOD 40 x 1.1/4" 17,300OD 50 x 1.1/2" 24,400

OD 53 x 2" 34,000OD 75 x 2 1/2" 52,400

OD 90 x 3" 107,200OD 110 x 4" 292,400

6OD 4 x 1.1/4" 24,800

OD 50 x 1.1/2" 27,800OD 63 x 2" 46,600

OD 75 x 2.1/2" 68,200OD 90 x 3" 159,700OD 110 x 4" 389,800

7OD 25 mm 99,200OD 40 mm 39,100OD 50 mm 46,300OD 63 mm 73,100OD 75 mm 69,900OD 90 mm 222,600OD 110 mm 604,300

Male Elbow 90c

Elbow 90c

Page 273: Boq Kosong

DAFTAR HARGA ACCESSORIES PIPA PE

No. Kode Size Buah Buah Harga / Keterangan (MM) Buah

1. 3. 4. 5. 6. 7. 8.

1 Equal CouplingHEC 20 20 x 20HEC 25 25 x 25HEC 32 32 x 32

2 Reducing CouplingHRC 25. 20 20 x 20HRC 32. 20 25 x 25HRC 32. 25 32 x 32

3 Equal ElbowHEE 20 20 x 20HEE 25 25 x 25HEE 32 32 x 32

4 Reducer ElbowHRE 25. 20 25 x 20HRE 32.25 32 x 25

5 Equal TeeHET 20 20 x 20 x 20HET 25 25 x 25 x 25HET 32 32 x 32 x 32

6 Reducing TeeHRT 25.20 25 x 25 x 20HRT 32.20 32 x 32 x 20HRT 32.25 32 x 32 x 25

7 Female Thread AdaptorHFTA 20.1/2 20 x 1/2 "HFTA 25.3/4 25 x 3/4 "HFTA 32.1 32 x 1"

8 Female Thread ElbowHFTE 20.1/2 20 x 1/2 "HFTE 25.3/4 25 x 3/4 "HFTE 32.1 32 x 1"

9 Male Thread AdaptorHMTA 20.1/2 20 x 1/2 "HMTA 25.1/2 20 x 1/2 "HMTA 25.3/4 25 x 3/4 "

HMTA 32.1 32 x 1"

10 Male Cross Tee A B C DHMCT 25 1/2 1/2 1/2HMCT 25 1/2 3/4 1/2HMCT 32 1/2 1/2 1/2HMCT 32 1/2 3/4 1/2

11 Cross Tee A B A1 DHCT 25 1/2 25 1/2HCT 25 1/2 32 1/2HCT 32 1/2 32 1/2

Page 274: Boq Kosong

No. Kode Size Buah Buah Harga / Keterangan (MM) Buah

1. 3. 4. 5. 6. 7. 8.

12 Male Tee With Female Branch A C D HMTFB 25 1/2 1/2 HMTFB 25 3/4 1/2 HMTFB 32 1/2 1/2 HMTFB 32 3/4 1/2

13 The With Female Thread Branch A A1 D HTFTB 25 25 1/2 HTFTB 32 25 1/2 HTFTB 32 32 1/2

14 Tanc Connector HTC 25.3/4 25 x 3/4 "HTC 32.1 32 x 1"

15 Bush HB 1.3/4 1" x 3/4"

HB 3/4. 1/2 3/4" x 1/2"

16 Extension Paece HEP 1 1/2 " x 1/2"

17 Clamp Saddle Poly Propylene 63 mm x 3/4" (termasuk mur & baut) 63 mm x 1"

90 mm x 3/4"90 mm x 1"

110 mm x 3/4"110 mm x 1"160 mm x 1"

18 Cuuter Pipe 40 mm

Page 275: Boq Kosong

DAFTAR HARGA ACCESSORIES PIPA PE

Keterangan

8.

Page 276: Boq Kosong

Keterangan

8.

Page 277: Boq Kosong

DAFTAR HARGAPIPA & FITTING PE

INNOVA by VINILON

PT RUSLI VINILON SAKTI

Tanggal, 28 Pebruari 2008

No. Kode Size Buah Buah Harga / Keterangan (MM) Buah

1. 3. 4. 5. 6. 7. 8.

1 Equal CouplingHEC 20 20 x 20 600 100 10,800HEC 25 25 x 25 400 50 11,600HEC 32 32 x 32 250 50 14,100

2 Reducing CouplingHRC 25. 20 20 x 20 500 100 11,600HRC 32. 20 25 x 25 320 80 14,100HRC 32. 25 32 x 32 280 70 14,100

3 Equal ElbowHEE 20 20 x 20 600 100 11,700HEE 25 25 x 25 280 70 13,300HEE 32 32 x 32 160 40 15,900

4 Reducer ElbowHRE 25. 20 25 x 20 280 70 12,700HRE 32.25 32 x 25 160 40 15,600

5 Equal TeeHET 20 20 x 20 x 20 300 50 10,800HET 25 25 x 25 x 25 200 50 12,000HET 32 32 x 32 x 32 100 25 24,200

6 Reducing TeeHRT 25.20 25 x 25 x 20 200 50 12,000HRT 32.20 32 x 32 x 20 100 25 22,000HRT 32.25 32 x 32 x 25 100 25 24,200

7 Female Thread AdaptorHFTA 20.1/2 20 x 1/2 " 600 100 16,200HFTA 25.3/4 25 x 3/4 " 500 100 21,600HFTA 32.1 32 x 1" 250 50 24,100

8 Female Thread ElbowHFTE 20.1/2 20 x 1/2 " 600 100 16,200HFTE 25.3/4 25 x 3/4 " 400 50 22,700HFTE 32.1 32 x 1" 160 40 24,100

9 Male Thread AdaptorHMTA 20.1/2 20 x 1/2 " 800 100 7,300HMTA 25.1/2 20 x 1/2 " 500 100 7,700HMTA 25.3/4 25 x 3/4 " 500 100 9,600

HMTA 32.1 32 x 1" 300 50 12,200

10 Male Cross Tee A B C DHMCT 25 1/2 1/2 1/2 200 50 19,000HMCT 25 1/2 3/4 1/2 200 50 19,900HMCT 32 1/2 1/2 1/2 200 50 22,700HMCT 32 1/2 3/4 1/2 200 50 25,300

11 Cross Tee A B A1 DHCT 25 1/2 25 1/2 200 50 19,900HCT 25 1/2 32 1/2 200 50 25,300HCT 32 1/2 32 1/2 200 50 26,000

Page 278: Boq Kosong

No. Kode Size Buah Buah Harga / Keterangan (MM) Buah

1. 3. 4. 5. 6. 7. 8.

12 Male Tee With Female Branch A C D HMTFB 25 1/2 1/2 200 50 18,200HMTFB 25 3/4 1/2 200 50HMTFB 32 1/2 1/2 200 50HMTFB 32 3/4 1/2 200 50

13 The With Female Thread Branch A A1 D HTFTB 25 25 1/2 200 50 21,700HTFTB 32 25 1/2 200 50 22,800HTFTB 32 32 1/2 200 50

14 Tanc Connector HTC 25.3/4 25 x 3/4 " 320 14,300HTC 32.1 32 x 1" 160 19,900

15 Bush HB 1.3/4 1" x 3/4" 900 2,500

HB 3/4. 1/2 3/4" x 1/2" 1,800 2,000

16 Extension Paece HEP 1 1/2 " x 1/2" 900 7,700

17 Clamp Saddle Poly Propylene 63 mm x 3/4" 18,700 (termasuk mur & baut) 63 mm x 1" 22,900

90 mm x 3/4" 34,70090 mm x 1" 41,200

110 mm x 3/4" 46,700110 mm x 1" 76,500160 mm x 1" 104,700

18 Cuuter Pipe 40 mm 99,700

Page 279: Boq Kosong

DAFTAR HARGA

Keterangan

8.

Page 280: Boq Kosong

Hal. 2.Keterangan

8.

Page 281: Boq Kosong

DAFTAR HARGA PIPA

PIPA HDPE PE 100 ( MRS 100)STANDARD SNI ( 06-4829-2005/ISO 422496VINILON - JAKARTA

S 5. SDR 11 (PN 16) S 6,3. SDR 13,6 (PN 12,5) S 8. SDR 17 (PN 10) S 10. SDR 21 (PN 10)No. Diameter Tebal Harga/ Harga Harga dari Tebal Harga/ Harga Harga dari Tebal Harga/ Harga Harga dari Tebal Harga/ Harga

Inci MM Meter di Ende Ende-lokasi MM Meter di Ende Ende-lokasi MM Meter di Ende Ende-lokasi MM Meter di Ende1. 2. 3. 4. 5. 6. 7. 8. 9. 10.

1 1/2 2.3 5,000 6,000

2 3/4 2.3 6,000 7,200

3 1 3.0 10,800 12,960

4 1 1/4 3.7 19,100 22,920

5 1 1/2 4.6 28,800 34,560 3.7 24,400 3.0 20,000 2.4 16,400

6 2 5.6 47,100 56,520 4.7 39,100 3.8 32,000 3.0 25,800

7 2.5 6.8 65,300 78,360 5.6 54,200 4.5 45,300 3.6 36,900

8 3 8.2 95,100 114,120 6.7 77,800 5.4 64,900 4.3 52,900

9 4 10.0 140,800 168,960 8.1 116,900 6.6 96,900 5.3 79,100

10 5 11.4 182,700 219,240 9.2 150,700 7.4 123,600 6.0 100,900

11 6 14.6 298,700 358,440 11.8 246,700 9.5 202,200 7.7 166,200

Page 282: Boq Kosong

DAFTAR HARGA PIPA

S 10. SDR 21 (PN 10) Panjang Pipa Ket.Harga dari Meter/Roll

Ende-lokasi 11. 12.

200 Roll

200 Roll

200 Roll

100 Roll

100 Roll

100 Roll

6-12 btg atau 50-100/roll

6-12 btg atau 50-100/roll

6-12 btg atau 50-100/roll

6-12 btg atau 50-100/roll

6-12 btg atau 50-100/roll

Page 283: Boq Kosong

DAFTAR HARGA PIPA PE

No. Diameter Tebal Panjang Pipa Harga / Meter Harga / Roll Jarak KeteranganInci MM Meter/Roll Rp Rp

1. 2. 3. 4. 5. 6. 7. 8.

1 1/2 2.3 200 Roll2 3/4 2.3 200 Roll3 1 3.0 200 Roll4 1 1/4 3.7 100 Roll5 1 1/2 4.6 100 Roll

1 1/2 3.7 100 Roll1 1/2 3.0 100 Roll1 1/2 2.4 100 Roll

6 2 5.6 100 Roll2 4.7 100 Roll2 3.8 100 Roll2 3.0 100 Roll

7 2.5 6.8 100 Roll2.5 5.6 100 Roll2.5 4.5 100 Roll2.5 3.6 100 Roll

8 3 8.2 100 Roll3 6.7 100 Roll3 5.4 100 Roll3 4.3 100 Roll

9 4 10.0 100 Roll4 8.1 100 Roll4 6.6 100 Roll4 5.3 100 Roll

9 5 11.4 100 Roll5 9.2 100 Roll5 7.4 100 Roll5 6.0 100 Roll

10 6 14.6 100 Roll6 11.8 100 Roll6 9.5 100 Roll6 7.7 100 Roll

11 7 100 Roll7 13.3 100 Roll7 10.7 100 Roll7 8.6 100 Roll

12 8 18.2 100 Roll8 14.7 100 Roll8 11.9 100 Roll8 9.6 100 Roll

13 9 20.5 100 Roll9 16.6 100 Roll9 13.4 100 Roll9 10.8 100 Roll

14 10 22.7 100 Roll10 18.4 100 Roll10 14.8 100 Roll10 11.9 100 Roll

15 12 28.6 100 Roll12 23.2 100 Roll12 18.7 100 Roll12 15.0 100 Roll

16 14 32.2 100 Roll14 26.1 100 Roll

Page 284: Boq Kosong

14 21.1 100 Roll14 16.9 100 Roll

Page 285: Boq Kosong

Hal. 2.No. Diameter Tebal Panjang Pipa Harga / Meter Harga / Roll Jarak Keterangan

Inci MM Meter/Roll Rp Rp 1. 2. 3. 4. 5. 6. 7. 8.

17 16 36.3 100 Roll16 29.4 100 Roll16 23.7 100 Roll16 19.1 100 Roll

18 18 40.9 100 Roll18 33.1 100 Roll18 26.7 100 Roll18 21.5 100 Roll

19 20 45.4 100 Roll20 36.8 100 Roll20 28.8 100 Roll20 23.9 100 Roll

20 25 57.2 100 Roll25 46.3 100 Roll25 37.2 100 Roll25 30.0 100 Roll

21 28 28 52.2 100 Roll28 42.1 100 Roll28 33.9 100 Roll

22 32 32 32 47.4 100 Roll32 38.1 100 Roll

23 35 35 35 53.5 100 Roll35 42.9 100 Roll

24 40 40 40 59.3 100 Roll40 47.7 100 Roll

25 60 57.2 100 Roll

Page 286: Boq Kosong

DAFTAR HARGA PIPA

PIPA HDPE PE 100 ( MRS 100)STANDARD SNI ( 06-4829-2005/ISO 422496VINILON - JAKARTA

No. Diameter Tebal Panjang Pipa Harga / Meter Harga / Roll Jarak KeteranganInci MM Meter/Roll Rp Rp

1. 2. 3. 4. 5. 6. 7. 8.

1 1/2 2.3 200 Roll 5,000 1,000,000 82 3/4 2.3 200 Roll 6,000 1,200,000 83 1 3.0 200 Roll 10,800 2,160,000 84 1 1/4 3.7 100 Roll 19,100 1,910,000 85 1 1/2 4.6 100 Roll 28,800 2,880,000 8

1 1/2 3.7 100 Roll 24,400 2,440,000 81 1/2 3.0 100 Roll 20,000 2,000,000 81 1/2 2.4 100 Roll 16,400 1,640,000 8

6 2 5.6 100 Roll 47,100 4,710,000 82 4.7 100 Roll 39,100 3,910,000 82 3.8 100 Roll 32,000 3,200,000 82 3.0 100 Roll 25,800 2,580,000 8

7 2.5 6.8 100 Roll 65,300 6,530,000 82.5 5.6 100 Roll 54,200 5,420,000 82.5 4.5 100 Roll 45,300 4,530,000 82.5 3.6 100 Roll 36,900 3,690,000 8

8 3 8.2 100 Roll 95,100 9,510,000 83 6.7 100 Roll 77,800 7,780,000 83 5.4 100 Roll 64,900 6,490,000 83 4.3 100 Roll 52,900 5,290,000 8

9 4 10.0 100 Roll 140,800 14,080,000 84 8.1 100 Roll 116,900 11,690,000 84 6.6 100 Roll 96,900 9,690,000 84 5.3 100 Roll 79,100 7,910,000 8

9 5 11.4 100 Roll 182,700 18,270,000 85 9.2 100 Roll 150,700 15,070,000 85 7.4 100 Roll 123,600 12,360,000 85 6.0 100 Roll 100,900 10,090,000 8

10 6 14.6 100 Roll 298,700 29,870,000 86 11.8 100 Roll 246,700 24,670,000 86 9.5 100 Roll 202,200 20,220,000 86 7.7 100 Roll 166,200 16,620,000 8

11 7 100 Roll 377,800 37,780,000 87 13.3 100 Roll 312,900 31,290,000 87 10.7 100 Roll 255,600 25,560,000 87 8.6 100 Roll 208,400 20,840,000 8

12 8 18.2 100 Roll 465,800 46,580,000 88 14.7 100 Roll 383,600 38,360,000 88 11.9 100 Roll 315,600 31,560,000 88 9.6 100 Roll 258,700 25,870,000 8

13 9 20.5 100 Roll 589,300 58,930,000 89 16.6 100 Roll 487,100 48,710,000 89 13.4 100 Roll 400,400 40,040,000 89 10.8 100 Roll 328,700 32,870,000 8

14 10 22.7 100 Roll 724,900 72,490,000 810 18.4 100 Roll 600,000 60,000,000 810 14.8 100 Roll 490,700 49,070,000 810 11.9 100 Roll 399,600 39,960,000 8

15 12 28.6 100 Roll 1,450,700 145,070,000 812 23.2 100 Roll 952,900 95,290,000 812 18.7 100 Roll 780,400 78,040,000 812 15.0 100 Roll 634,200 63,420,000 8

16 14 32.2 100 Roll 1,460,400 146,040,000 8

Page 287: Boq Kosong

14 26.1 100 Roll 1,208,000 120,800,000 814 21.1 100 Roll 993,300 99,330,000 814 16.9 100 Roll 804,900 80,490,000 8

Page 288: Boq Kosong

Hal. 2.No. Diameter Tebal Panjang Pipa Harga / Meter Harga / Roll Jarak Keterangan

Inci MM Meter/Roll Rp Rp 1. 2. 3. 4. 5. 6. 7. 8.

17 16 36.3 100 Roll 1,854,200 185,420,000 816 29.4 100 Roll 1,532,400 153,240,000 816 23.7 100 Roll 1,255,100 125,510,000 816 19.1 100 Roll 1,026,700 102,670,000 8

18 18 40.9 100 Roll 2,641,600 264,160,000 818 33.1 100 Roll 2,183,600 218,360,000 818 26.7 100 Roll 1,789,000 178,900,000 818 21.5 100 Roll 1,460,600 146,060,000 8

19 20 45.4 100 Roll 3,258,600 325,860,000 820 36.8 100 Roll 2,694,600 269,460,000 820 28.8 100 Roll 2,204,000 220,400,000 820 23.9 100 Roll 1,802,000 180,200,000 8

20 25 57.2 100 Roll 5,173,600 517,360,000 825 46.3 100 Roll 4,272,600 427,260,000 825 37.2 100 Roll 3,499,000 349,900,000 825 30.0 100 Roll 2,840,000 284,000,000 8

21 28 28 52.2 100 Roll 6,885,000 688,500,000 828 42.1 100 Roll 4,387,000 438,700,000 828 33.9 100 Roll 3,576,000 357,600,000 8

22 32 32 32 47.4 100 Roll 5,643,000 564,300,000 832 38.1 100 Roll 4,598,000 459,800,000 8

23 35 35 35 53.5 100 Roll 7,107,000 710,700,000 835 42.9 100 Roll 5,788,600 578,860,000 8

24 40 40 40 59.3 100 Roll 8,822,600 882,260,000 840 47.7 100 Roll 7,188,000 718,800,000 8

25 60 57.2 100 Roll 10,342,600 1,034,260,000 8

Page 289: Boq Kosong

ANALISA HARGA DASAR SATUAN BAHAN

Jenis : Pasir Pasang Lokasi : QuarryTujuan : Lokasi Pekerjaan

HARGANo. URAIAN KODE KOEF. SATUAN SATUAN

(Rp.)I. ASUMSI

1 Menggunakan tenaga manusia2 Kondisi Jalan : sedang / baik3 Jarak Quarry ke Lokasi Pekerjaan L 9.00 Km4 Harga satuan Pasir pasang/beton di Quarry RpML.02 1.00 M3 66,666.67 5 Harga Satuan Dasar Upah RpL01 1.00 Jam 7,142.86 6 Harga Satuan Dasar Dump Truck RpE08 1.00 Jam 264,761.05

II. URUTAN KERJA1 Pasir pasang/beton telah disiapkan di quari2 Orang/pekerja memuat pasir pasang

ke dalam Dump Truck3 Dump Truck mengangkut pasir tsb ke

lokasi pekerjaan

III. PERHITUNGANDimuat dengan tenaga manusiaPEKERJA

Produksi Q1 7.50 M3 / JamHasil produksi / hari = Q1 x 5 Jam Qt 37.50 M3 / 5 jamKebutuhan Pekerja P 4.00 Orang

Biaya Pekerja / M3 = { (5 Jam x P) : Qt } x RpL01 Rp1 3,809.52 Rupiah

DUMP TRUCK (E08)Kapasitas bak V 3.33 M3Faktor efisiensi alat Fa 0.83 -Kecepatan rata-rata bermuatan v1 40.00 KM/JamKecepatan rata-rata kosong v2 50.00 KM/JamWaktu siklus Ts2- Waktu tempuh isi = (L/v1) x 60 T1 13.50 menit- Waktu tempuh kosong = (L/v2) x 60 T2 10.80 menit- Muat = (V/Q1) x 60 T3 26.64 menit- Lain-lain T4 1.00 menit

Ts2 51.94 menitKapasitas Produksi / Jam =

V x Fa x 60 Q2 3.19 M3 / JamTs2

Biaya Dump Truck / M3 = (1 : Q2) x RpE08 Rp2 82,924.42 Rupiah

IV. HARGA SATUAN DASAR BAHANDI LOKASI PEKERJAAN

Harga Satuan Dasar Pasir Pasang =

=( RpML.02 + Rp1 + Rp2 ) ML.02 153,400.62 Rupiah

Dibulatkan : ML.02 153,400.00 Rupiah

Page 290: Boq Kosong

0KOP PERUSAHAAN

0

HARGA PERKIRAAN SENDIRI( H P S )

PAKET PEKERJAAN :JASA KONSTRUKSI LANJUTAN PEMBANGUNANKANTOR PERPUSTAKAAN DAN ARSIP DAERAH

NILAI HPS :RP. 934.972.000,00.-

PEJABAT PEMBUAT KOMITMEN

KANTOR PERPUSTAKAAN DAN ARSIP DAERAH

KABUPATEN ENDE

TAHUN ANGGARAN 2016

(Sembilan Ratus Tiga Puluh Empat Juta Sembilan Ratus Tujuh Puluh Dua Ribu Rupiah)

Page 291: Boq Kosong

0KOP PERUSAHAAN

0

Catatan Kaji Ulang RAB

1.

2. Untuk pekerjaan dengan volume pembayaran Unit/LS, yaitu :- Pas. Meteran Listrik daya 2200 Kwh- Penulisan papan nama kantor (Logam/stainlees steel)- Pembongkaran Pagar Depan dan Pojok Belakang Gedung

3.

4.

5.6.

7.

Ende, 30 Maret 2016

KONSULTAN PERENCANA KANTOR PERPUSTAKAAN DAN CV. KONINDO ARSIP DAERAH KABUPATEN ENDE

PEJABAT PEMBUAT KOMITMEN

FRANS S. da COSTA, ST JOHANES K. MARINUS RAI, ST,MTKepala Perwakilan NIP. 19770428 200112 1 004

Pekerjaan Listrik cek kembali biayanya agar ini sudah termasuk biaya SLO. Rinciannya juga cantumkan dalam spesifikasi

gambaran kepada penyedia tentang apa yang nanti akan dikerjakan khusus untuk item2 tersebut.

Kabel untuk listrik yang telah terpasang pada pekerjaan tahap sebelumnya seluruhnya tidak dapat lagi digunakan. Disarankan untuk menggunakan tray khusus untuk jaringan kabel listrik dibawah plat beton (lt.1) dan diatas plafond (lt 2);

Mencantumkan secara jelas spesifikasi dan type bahan yang digunakan (bila diperlukan dengan gbr contoh) khususnya untuk bahan granit, Pekerjaan sanitasi seperti kran2 air, flordrain, wastafel, kunci dan bahan penggantung pada intu dan jendela, termasuk bahan, material dan ukuran untuk tulisan papan nama Kantor;

Tulisan granito pada analisa dirubah jadi granit. Granito merupakan salah satu merk granit.Kolom pada lantai 2 ada yang harus dibongkar, apakah volume utk pekerjaan tersebut sudah ada dalam RAB.

Pipa drain air hujan dari talang agar dipasang menerus sampai ke saluran drainase kota. (khusunya pada bagian gedung yang dekat jalan setapak)