Agile Project Managementwith Scrum
Jack Davis
Agenda
Agile Quick Overview
Scrum / Daily Scrum
Sprint Backlog Worksheet & Burndown Chart
Agile Work Breakdown and Estimating
Traditional Waterfall
Requirements Analyze
Design Implement
Test Release
Sequential Steps
Agile Manifesto (2001)
“We are uncovering better ways of developing software by doing it and helping others do it. Through this work we have come to value:
Individuals and interactions over processes and tools.
Working software over comprehensive documentation.
Customer collaboration over contract negotiation.
Responding to change over following a plan.
That is, while there is value in the items on the right, we value the items on the left more.”
Agile Software Methods
Adaptive Software Development – ASD
Crystal Clear
Dynamic Systems Development Method – DSDM
Extreme Programming – XP
Evolutionary Development - EVO
Feature-Driven Development – FDD
Lean Development
Scrum
many other variations...
What is Agile?
Non-Waterfall, non-sequential
Incremental, iterative, time-boxed processes
Light-weight, designed for ease of use
Focused on flexibility
Targets maximizing product-value given fixed resources and schedules.
Product-focus rather than process-focus
Deemphasizes long-range planning details
Focuses planning on the immediate iteration
Promotes openness and transparency
Provides improved visibility to stakeholders
Project Management Workflow
Vision Document
Pro
duct
Pro
ject
Engineering System
Milestone Schedule
Establish milestone dates and
goals
Mitigate risks and
dependencies
Conduct milestone reviews
Align schedules &
communicate status
Fea
ture
Feature Schedule
Estimate and prioritize features
Align features to milestones
Report status and
remove blockages
Complete work
Review tasks and assign resources
What’s different with Scrum?
Feature Schedule
Estimate and prioritize features
Align features to milestones
Report status and
remove blockages
Complete work
Review tasks and assign resources
Fea
ture
Short-term (Sprint) Backlog
Time boxed: 30 days
Time boxed: daily
Retrospective
“Sprint” Team Sync (“Scrum”)
Self-directed team
Visibility, inspection, adaptation
Long-term
(Product) Backlog
Daily Scrum
15 minutes once a day.
Each person answers three questions:
1. What did you work on yesterday?(how much time did you spend?)
2. What will you will be working on today?(any change to the remaining estimate?)
3. Do you have any blocking issues?
Recommend:• Capture daily meeting minutes in pages on shared OneNote.• Include a copy of the current Burndown Chart at the top of each day’s page.
Scrum Minutes
Sprint Backlong Worksheet
Simple to use Excel sheet to track progress.
Burndown with Cumulative Flow
0
20
40
60
80
100
120
140
160
180
200
Calendar Days
Wo
rkit
em
Ho
urs
Pending
In Progress
Complete
Burndow n
Linear(Burndow n)
Simpler than expected
Lost velocity (sidetracked)
Burndown with Cumulative Flow
0
50
100
150
200
250
300
350
400
1 4 7 10 13 16 19 22 25 28
Calendar Days
Wo
rkit
em H
ou
rs
Pending
In Progress
Complete
Remaining
Trend
Plan growth!! (underestimated work)
Review priorities,cut low-priority tasks
Over-multitasking
PackURI M1 Daily Scrum minutesonenote:http://windows/wex/dox/features/packaging/Shared%20Documents/DoxPack/Win7-Design/PackUri.one#section-id={0C4B7ED7-D427-45FF-9136-BDBC5D9F82A1}&end
Rendering M1 Daily Scrum minutesonenote:http://windows/wex/dox/features/rendering/Shared%20Documents/DOX%20Rendering%20Shared%20Notebook/M1%20Scrum.one#section-id={9C317007-35D7-4C72-B0D8-51889F75EF23}&end
PackURI M1 SprintBacklog Spreadsheet\\jackd\PackURI\PackUri-SprintBacklog.xlsx
Rendering M1 SprintBacklog Spreadsheet\\fengy-dev3\public\Win7_FeatureCrew\M1_XPS_Backlog.xlsx
SprintBacklog Template (empty to start)\\tkfiltoolbox\Tools\23572\Deluxe - SprintBacklogTemplate.xlsx
Scrum Examples and Tools
Estimation “Cone of Uncertainty”
Stabilization
4x
- 4x
Early estimates vary wildly: 8x Lots of surprises:
We learn as the project progresses
DevelopmentAnalysis & Design
Work-Item Planning
1. Create a work breakdown schedule thatidentifies the tasks to be completed.
2. For each task, define “done”. (see Defining “Done” next)
3. Estimate time* for each task. (see Planning Poker next)
If more than 3 days:Decompose the task into 1/2 to 3 day work-items.For each work-item, define “done”.
*All time estimates “unbuffered”.
Work-Item Planning – Agile Tips and Techniques
After creating a high-level breakdown of tasks, prioritize the high-level task list based on a blending of the following three qualities:
1. Architecturally significantIf implemented, we are forced to design, build, and test the core architecture.
2. High product/business value – key critical product features
3. High risk (such as, “must be able to handle 2000 concurrent transactions")
(Applying UML and Patterns, Craig Larman, 2003, Ch 2.4, discussion of “Unified Process”).
Use a product-value naming convention to name features and tasks:
Naming Template:
<action> the <result> <by|for|of|to> a(n) <object>Name Examples:
Calculate the total amount of a SaleCalculate the total quantity sold by a Retail Outlet for an Item DescriptionDetermine the most recent Cash Register Assignment for a Cashier
(Agile Software Development Ecosystems, Highsmith, 2002, Ch 20 “The FDD Process Model “)
Defining “Done”
Define “done” for each work item
Agree on how to know when an item is “done”.Use a definition that clearly identifies when the item is complete.Insert an Excel comment* for each item to note when it is “done”.If assumptions about “done” change, re-do Planning Poker.
Result: Every Sprint item has a “Done” comment.
Ok: Coding complete (“complete” can be subjective)Better: Coding complete, unit test complete,
working code and tests checked into branch. (“checked in” is definitive)
*TIP: Use Edit->Paste Special…->Comments to repeat the definition for like items
Planning PokerRequires: Planning Poker card deck for each participant.
For each item in the Sprint Backlog:1. Dev or test lead verbally describes the feature to be implemented.2. Each person secretly selects an estimate card: 4,8,12,16,24,32,40,>40
Estimates are in unbuffered hours.Estimates are only for the work to be completed during this Sprint.
3. Everyone reveals their cards at once.4. High and low (and others) discuss their assumptions & decision.5. Repeat until the estimates converge (typically 2 to 4 iterations).6. Optional: Risk Assessment (“Three-point” / “Wide-band Delphi” technique)
On the final pass ask each person to select 3 cards:an Optimistic time, a Most-Likely time, and a Pessimistic time.The divergence of optimistic and pessimistic is useful to identify high risk items.
7. Fill in results in the Initial (estimate) column of the Sprint worksheet.8. Estimate next item.
Result : Initial column filled in for all Sprint work items
Questions / Comments
PackURI M1 Daily Scrum minutesonenote:http://windows/wex/dox/features/packaging/Shared%20Documents/DoxPack/Win7-Design/PackUri.one#section-id={0C4B7ED7-D427-45FF-9136-BDBC5D9F82A1}&end
Rendering M1 Daily Scrum minutesonenote:http://windows/wex/dox/features/rendering/Shared%20Documents/DOX%20Rendering%20Shared%20Notebook/M1%20Scrum.one#section-id={9C317007-35D7-4C72-B0D8-51889F75EF23}&end
PackURI M1 SprintBacklog Spreadsheet\\jackd\PackURI\PackUri-SprintBacklog.xlsx
Rendering M1 SprintBacklog Spreadsheet\\fengy-dev3\public\Win7_FeatureCrew\M1_XPS_Backlog.xlsx
SprintBacklog Template (empty)\\tkfiltoolbox\Tools\23572\Deluxe - SprintBacklogTemplate.xlsx
MS-EE Scrum and Agile Project Management classhttp://mylearning/CourseDetails.aspx?COURSENO=COUR2006051616181112700341&title=Scrum%20and%20Agile%20Project%20Management
MS-EE Scrum Wikihttp://wiki/default.aspx/Microsoft.Teams.EEG/Scrum.html
Scrum Examples and Tools
5 Questions on Agile Development, October 2007, Steve McConnellhttp://blogs.construx.com/blogs/stevemcc/archive/2007/10/08/5-questions-on-agile-development.aspx
Legacy of Agile Software Development, 2007, Steve McConnellhttp://www.construx.com/Page.aspx?hid=1821
Why I Don’t Use Story Points for Sprint Planning, Mike Cohn(or “Estimate Sprint Work Items in ‘Hours’ instead of ‘Story Points’ ”)http://blog.mountaingoatsoftware.com/?p=15
Don’t Average During Planning Poker, Mike Cohnhttp://blog.mountaingoatsoftware.com/?p=14
Toward a Catalog of Scrum Smells, Mike Cohn(or “How to Tell When Good Scrum Goes Bad”)http://www.mountaingoatsoftware.com/system/article/file/11/ScrumSmells.pdf