DOCUMENT RESOURCES FOR EVERYONE
Documents tagged
Documents QBPM System Installation Systems –Rack mount chassis –LO and CAL RF cable plant ( need 714Mhz...

Slide 1QBPM System Installation Systems –Rack mount chassis –LO and CAL RF cable plant ( need 714Mhz from eels bedroom) –Down mix boxes –DC power cable plant –IF…

Documents QBPM System Installation

QBPM System Installation Systems Rack mount chassis LO and CAL RF cable plant ( need 714Mhz from eels bedroom) Down mix boxes DC power cable plant IF signal cable plant Analog…

Documents LHC – LEIR approach Present LEIR Hardware Possible upgrades Planning

A.Blas AB/RF/FB Team meeting 21/1/2008 * Upgrade possibilities for the Hardware of the LEIR type Beam Control Information from: M.E. Angoletta, P. Baudrenghien, E, Bracke,…

Documents TTC upgrade Status May 2006

TTC upgrade Status May 2006 Overview AB/RF optical links Receiver crate Status and schedules Documentation LEADE, 15/06/06 Overview AB/RF optical links Receiver crate Status…

Documents Creating an EPICS Based Test Stand Development System for the BPM Digitizer

Creating a novel test stand development system for the BPM Digitizer Creating an EPICS Based Test Stand Development System for the BPM Digitizer Farah Memon San Jose State…

Documents LHC – LEIR approach Present LEIR Hardware Possible upgrades Planning

A.Blas AB/RF/FB Team meeting 21/1/2008 * Upgrade possibilities for the Hardware of the LEIR type Beam Control Information from: M.E. Angoletta, P. Baudrenghien, E, Bracke,…