DOCUMENT RESOURCES FOR EVERYONE
Documents tagged
Documents Abstract Mechanical Inspection and Survey Steven Seiler, NSLS-II Project The Survey and Alignment...

Slide 1Abstract Mechanical Inspection and Survey Steven Seiler, NSLS-II Project The Survey and Alignment Group is often the first and last to work with the Storage Ring magnets.…

Documents VELO2 Full Metrology Girish Patel University of Liverpool 16/11/12.

Slide 1 VELO2 Full Metrology Girish Patel University of Liverpool 16/11/12 Each fiducial made of 4 circles, centre of each was measured Measure 5x4 = 20 fiducial points,…

Documents Abstract

Abstract Mechanical Inspection and Survey   Steven Seiler, NSLS-II Project     The Survey and Alignment Group is often the first and last to work with the Storage Ring…

Documents VELO2 Full Metrology

Slide 1 VELO2 Full Metrology Girish Patel University of Liverpool 16/11/12 Each fiducial made of 4 circles, centre of each was measured Measure 5x4 = 20 fiducial points,…