Automatic Railway gate control and parameter monitoring ABSTRACT The main purpose of this project is to provide cost effective safety measures at level crossings in railways.…
1. 1 ABSTRACT The objective of this paper is to provide an automatic railway gate at a level crossing replacing the gates operated by the gatekeeper. It deals with two things.…
PowerPoint Presentation Vijay Darda Vijay darda: West-Central Railway eliminates all unmanned crossings from its system http://www.vijaydarda.in/ Vijay Darda Letest News…
Slide 1 AUTOMATIC RAILWAY GATE LEVEL CROSSING INTRODUCTION: An automatic railway gate control at unmanned level crossings replacing the gates operated by gate keepers and…