Slide 112/02/2013 Gerrit Jan Focker, BE/BI/PM 1 WireGrid electronics in the Linac 4 tunnel Slide 2 12/02/2013 Gerrit Jan Focker, BE/BI/PM 2 Technology Choice. u At the time…
Slide 1PEPPo Weekly Status Meeting February 16, 2011 & 6MSD Planning Meeting February 23, 2011 Part 1 – Technical summary of layout Part 2 – Month-by-Month Installation…
Slide 1Mike Albrow Proton Driver Workshop, October 2004 The Proton Driver and the Tevatron Collider Tevatron now 2009 and beyond (?) Experiments now and foreseen (or foresee-able?)…
1. +91-8588842398Ankam Corporation www.ankamcorp.comAnkamCorporationmanufacturingandisengagederectioninDesign,of waterparkequipments, Water Slides, Multi Activity Water Fun…
Slide 1Prepared by: Eng. Haider Mohammed Jasim Slide 2 - Box culvert is hydraulic structure consisting of two horizontal and two vertical slabs built monolithically are ideally…
Slide 1Netlipse Network Meeting Zürich, October 2008 HSL Figueras - Perpignan Project Slide 2 2 General Information of the Company Project Characteristic Investment…