1. Access Control Requirements Gathering Session 1 2. • The business requirements will form the basis of future projects and will determine the eventual scope. • If a…
1. CCTV Requirements Gathering 2. • The business requirements will form the basis of future projects and will determine the eventual scope. • If a ‘need’ is not raised…