Slide 1Glenn Patrick Rutherford Appleton Laboratory http://hepwww.rl.ac.uk/pust/masterclass.htm INTRODUCTION A Very Brief Guide to Accelerators RAL Masterclasses 2009 Slide…
1. Making a quality change as a startup grows Author: Ran Levy June 2014 2. • Overview - MyHeritage • The beginning • Making a quality change • Moving forward and…
Slide 1Philip Burrows SiD meeting, Chicago 15/11/081 Progress on the LoI Philip Burrows John Adams Institute Oxford University Thanks to: Hiro Aihara, Mark Oreglia Slide…
Slide 1The fourth Baseline Technical Review (BTR) - Conventional Facilities and Siting 22-23 March 2012 All changes made to the CFS 2007 Reference Design during the Technical…
Overview of the ILC and SRF Program (With an emphasis on Px) Shekhar Mishra ILC & SRF Program Fermilab ILC R&D and SRF Infrastructure ILC R&D Mission: Work with…
Civil Engineering and Services for MDI CLIC Civil Engineering and Services - CDR chapter structure - CE drawings for CDR - Other services - Conclusion and next steps J.Osborne…
A summary of * Heavy Ions Meeting – Irfu/SPhN – 17/9/2010 Javier Castillo ICHEP The French particle physics community is particularly proud to have been selected to host…
Overview of the ILC and SRF Program (With an emphasis on Px) Shekhar Mishra ILC & SRF Program Fermilab ILC R&D and SRF Infrastructure ILC R&D Mission: Work with…
* Global R&D Effort in the Technical Design Phase for the ILC I. Overview II. Superconducting RF Development Akira Yamamoto (KEK) for the ILC-GDE Project Managers To…