1. Introduction: About the substation: 1.1. THE SUBSTATION AT DURGAPUR HAS BEEN COMISIONED ON 9th of MAY, 1976. It is the only substation in Asia to have 5 isolator system…
A Report on TRANSMISSION LINE CONSTRUCTION By RITESH M. PANCHAL Diploma Trainee [Electrical] Emp.No:20759 POWER GRID CORPORATION OF INDIA LTD. (A Government of India Enterprise)…
Done by : Arunkumar M.P Bijesh K.B Jijo Francis Lipin A.K ABOUT FACT is a doyen among the manufactures in India. It started production in 1944 on the bank of river Periyar.…
[A MODEL OF 220/132KV SUBSTATION] 2010-2011 Department of Electrical & Electronics Engineering |SATM Indore (M.P.) 1 [A MODEL OF 220/132KV SUBSTATION] 2010-2011 Department…
IEEE RURAL ELECTRIC POWER CONFERENCE 2011 CHATTANOOGA, TENNESSEE Grounding Considerations for Large kVA Pad-Mount Transformers Ruwan Weerasundara, P.Eng Member IEEE ESC Engineering,…
Hi this is a project on a 220 kV Grid substation in Sarusajai, Guwahati, Assam Most of the documents are taken from different search engines and I am not responsible for…
1. 2011Electrical EarthlingConstruction, Faults & ProtectionGiven the importance of electric power as one of the basic elements ofeconomic and social development has…
Slide 1 IEEE Rural Electric Power Conference 2011 Chattanooga, Tennessee Grounding Considerations for Large kVA Pad-Mount Transformers Ruwan Weerasundara, P.Eng Member IEEE…