DOCUMENT RESOURCES FOR EVERYONE
Documents tagged
Documents FTD-ILD sub-detector power distribution system prototype based on Supercapacitors I.Echevarria, M......

Slide 1 FTD-ILD sub-detector power distribution system prototype based on Supercapacitors I.Echevarria, M. Iglesias, A. Pradas, FJ. Piedrafita, Dr. F. Arteche, 6-10 October…

Documents F. Arteche, C. Esteban Instituto Tecnológico de Aragón D. Moya, I. Vila, A. L. Virto, A. Ruiz...

Slide 1 F. Arteche, C. Esteban Instituto Tecnológico de Aragón D. Moya, I. Vila, A. L. Virto, A. Ruiz Instituto de Física de Cantabria Powering requirements and constraints…

Documents Modularity in the Phase II Upgrade of the ATLAS Strip Tracker Ian Wilmut.

Modularity in the ATLAS upgrade strip tracker Modularity in the Phase II Upgrade of the ATLAS Strip Tracker Ian Wilmut Abstract For the phase II upgrade of the ATLAS tracker…

Documents CLEOC/BESIII— New Frontiers of -C Physics

CLEOC/BESIII— New Frontiers of -C Physics I . CLEOC/CESRC and BESIII/BEPCII II. Physics Over View III. Current Status Suggestions to BESIII V. Summary Z.G. Zhao University…

Documents The CBC2 ASIC for 2S Modules at HL-LHC Davide Braga IOP 2014 Joint HEPP and APP Groups Annual...

PowerPoint Presentation The CBC2 ASIC for 2S Modules at HL-LHC Davide Braga IOP 2014 Joint HEPP and APP Groups Annual Meeting, Royal Holloway, May 2014 Some of the slides…

Documents 18 April 2008LCUK meeting, Birmingham Chris Damerell 1 ILC Detector R&D as seen by the Detector R&D....

ILC Detector R&D as seen by the Detector R&D Panel (a Panel of the World-Wide Study Organising Committee) (Jean-Claude Brient, Chris Damerell, Ray Frey, Dean Karlen,…

Documents Institutional Responsibilities

Folie 1 Institutional Responsibilities HEPHY â CMS Management Meeting June 20, 2013 June 20, 2013 HEPHY Vienna 2 Personnel June 2013 Three groups: Analysis, Trigger, Tracker…

Documents The CBC2 ASIC for 2S Modules at HL-LHC

PowerPoint Presentation The CBC2 ASIC for 2S Modules at HL-LHC Davide Braga IOP 2014 Joint HEPP and APP Groups Annual Meeting, Royal Holloway, May 2014 Some of the slides…

Documents Design and development of micro-strip stacked module prototypes for tracking at S-LHC Motivations...

Design and development of micro-strip stacked module prototypes for tracking at S-LHC Design and development of micro-strip stacked module prototypes for tracking at S-LHC…

Documents Review of Scalar Meson Production at = 7TeV in CMS, U(1)' Gauge Extensions of the MSSM and

Review of Scalar Meson Production at = 7TeV in CMS, U(1)' Gauge Extensions of the MSSM and Calorimetry for Future Colliders Thesis Defense Burak Bilki June 16, 2011…