Documents 5/3/20121 PHENIX WEEKLY PLANNING 5/3/2012 Don Lynch.

Slide 15/3/20121 PHENIX WEEKLY PLANNING 5/3/2012 Don Lynch Slide 2 5/3/20122 This Week U-U run continues No scheduled maintenance access this week? Next scheduled maintenance…

Documents 6/7/20121 PHENIX WEEKLY PLANNING 6/7/2012 Don Lynch.

PHENIX WEEKLY PLANNING 6/7/2012 Don Lynch This Week Cu-Au Run continues Controlled Maintenance access this week sPHENIX design and analysis continues 2012 Shutdown prep continues…

Documents 1 05/14/2009 PHENIX WEEKLY PLANNING 5/14/2009 Don Lynch.

PHENIX WEEKLY PLANNING 5/14/2009 Don Lynch RPC Installation Crane Measurements RPC Installation Support measurements MuTrigger FEE South Cable Tray planning RPC3 N gap interferences…