DOCUMENT RESOURCES FOR EVERYONE
Documents tagged
Documents ncr5877

5877 Personas ATM Site Preparation 1468 (57.8 mm in.) 1490 (58.6 mm 6 in.) 715 (28.1 mm 5 in.) 472 (18.5 mm 8 in.) Rear of Terminal 37.5mm (1.5in.) 5mm (0.2in.) 1335 (52.5…

Documents Vacuum incident on MKB - Implication on HV performance and tests foreseen

MPP meeting Vacuum incident on MKB - Implication on HV performance and tests foreseen MPP meeting Viliam Senaj,25/10/2013 MKB tank view Common tank for 2 magnets (MKBH or…

Documents PS injection at 2 GeV

PS injection at 2 GeV PS injection at 2 GeV W. Bartmann, J. Borburgh, S. Gilardoni, B. Goddard, L. Sermeus, R. Steerenberg PS-LIU meeting, 27-Aug-2013 Aim of the PSB-PS transfer…

Documents Abstract:

Slide 1 Abstract: Based on the principle of the RADMON on line radiation monitoring system for the LHC, a new type of low cost, battery powered radiation monitors has been…