2008 Northstar/ Martin Piling Action Plan Case Study: Capella de Pedregal General Contractor: Beck Group Engineering: Ocean and Coastal Engineering, Dr. Max Shepard Crystal…
Tower Latino Americana, Mexico City This 43-story structure, tallest in Mexico City, has a basement with an excavation 42 ft deep. The substructure rests on cast-in-place…