Slide 1R. Assmann - LHCCWG Two Beam Operation R.W. Aßmann LHCCWG 8.5.2007 Acknowledgements to W. Herr, V. Previtali, A. Butterworth, P. Baudrenghien, J. Uythoven, J. Wenninger,…
Slide 1 1 Analysis of MD on IR1 and IR5 aperture at 3.5 TeV – progress report C. Alabau Pons, R. Assmann, R. Bruce, M. Giovannozzi, G. Müller, S. Redaelli F. Schmidt,…
For Matteo Cycle at 4 TeV and 7 TeV Many thanks to: the OP team (S.Redaelli and W.Venturini included!), the optic team and the FIDEL team LHC Beam Operation WS – Evian…
Diapositive 1 Accelerators for ADS 20-21 March 2014 CERN Approach for a reliable cryogenic system T. Junquera (ACS) *Work supported by the EU, FP7 MAX contract number 269565…
Two Beam Operation R.W. Aßmann with W. Venturini and V. Kain LTC 4.7.2007 Acknowledgements to W. Herr, V. Previtali, A. Butterworth, P. Baudrenghien, J. Uythoven, J. Wenninger,…
Slot allocation of SSS620 1 IR1 and IR5 aperture at 3.5 TeV Preliminary results S. Redaelli, C. Alabau Pons, R. Assmann, R. Bruce, M. Giovannozzi, G. Müller, F. Schmidt,…
Slot allocation of SSS620 1 Analysis of MD on IR1 and IR5 aperture at 3.5 TeV – progress report C. Alabau Pons, R. Assmann, R. Bruce, M. Giovannozzi, G. Müller, S. Redaelli…
Diapositive 1 Accelerators for ADS 20-21 March 2014 CERN Approach for a reliable cryogenic system T. Junquera (ACS) *Work supported by the EU, FP7 MAX contract number 269565…