DOCUMENT RESOURCES FOR EVERYONE
Documents tagged
Documents Gamma background simulation for the RPC Endcap and Barrel regions of CMS/LHC using GEANT4 We present...

Slide 1Gamma background simulation for the RPC Endcap and Barrel regions of CMS/LHC using GEANT4 We present some results obtained by the CMS Resistive Plate Chamber Sensitivity…

Documents Daya Bay RPC Gas System: Safety Subsystem Changguo Lu, Princeton University (Jan. 12, 2008)

Slide 1 Daya Bay RPC Gas System: Safety Subsystem Changguo Lu, Princeton University (Jan. 12, 2008) Slide 2 Outline Consideration to the Daya Bay RPC gas safety subsystem:…

Documents CHEP'09

CHEP'09 17th International Conference on Computing in High Energy and Nuclear Physics 21 - 27 March 2009 Prague, Czech Republic The CMS RPC Detector Control System:…

Documents Muons in ATLAS

Muons at ATLAS Muons in ATLAS Alexander Oh University of Manchester on behalf of the ATLAS Collaboration ATL-COM-MUON-2010-024 1 Muons Detector and Reconstruction Alignment…

Documents Auger 2015

Slide 1 Lisboa, April 2012 Jornadas LIP Auger 2015 Foi o Ruben que fez o template mas eu ajudei-o no início… Cosmic Rays in 1912 2 2 Hess at start of balloon flight Cosmic…

Documents DT UPGRADE STRATEGY

DT perspective (performance and issues) on operation at high luminosity DT UPGRADE STRATEGY M.Dallavalle for the DT Collaboration 6/26/12 Muon IB 1 The DT plan for the future…

Documents DT towards run 2

DT towards run 2 DT towards run 2 Aachen IIIA, ATOMKI, Budapest, CIEMAT Madrid, Debrecen, IFCA Santander, INFN(Bologna,Padova,Torino), NICPB Tallinn, Oviedo, UA Madrid, UM…

Documents ATLAS RPC phase-2 proposal

PowerPoint Presentation ATLAS RPC phase-2 proposal Completion of the detector for the barrel muon trigger via the installation of new trigger stations in the inner layer…

Documents ATLAS/CMS RPC R&D for phase-2

PowerPoint Presentation ATLAS/CMS RPC R&D for phase-2 D.Boscherini for the ATLAS Coll. and S.Bianco for the CMS Coll. R&D RPC phase2 - Rome May 9th 2014 1 ATLAS RPC…

Documents RPC PAC Trigger system installation and commissioning How we make it working… On-line software...

Slajd 1 RPC PAC Trigger system installation and commissioning How we make it working… On-line software Resistive Plate Chambers Link Boxes Optical Links Synchronization…