DOCUMENT RESOURCES FOR EVERYONE
Documents tagged
Documents Holger Schlarb, DESY, 16 th DESY-MAC 10.11.2010 FLASH LLRF & Synchronization System + Roadmap On...

Slide 1Holger Schlarb, DESY, 16 th DESY-MAC 10.11.2010 FLASH LLRF & Synchronization System + Roadmap On behalf of the LLRF and Laser based Synchronization team Presented…

Documents FLASH. Free-Electron Laser in Hamburg Lessons from FLASH FLASH Upgrade FLASH II Lessons Siegfried...

Slide 1FLASH. Free-Electron Laser in Hamburg Lessons from FLASH FLASH Upgrade FLASH II Lessons Siegfried Schreiber DESY FLS 2010 SLAC 1-6 March 2010 Slide 2 Siegfried Schreiber…

Documents The Implementation Strategy Proposed SLAC Controls Upgrade December 1, 2010 Ray Larsen.

Slide 1 The Implementation Strategy Proposed SLAC Controls Upgrade December 1, 2010 Ray Larsen Slide 2 Controls Upgrade Implementation Outline 1.Existing System 2.MTCA Module…

Documents Fermilab AAC May 11 th 1/12 Testing of Cap-Cav 2 LLRF Development with DESY Alexander Brandt, DESY,....

Slide 1 Fermilab AAC May 11 th 1/12 Testing of Cap-Cav 2 LLRF Development with DESY Alexander Brandt, DESY, Hamburg 1.Current and Future LLRF Developments at DESY 2.DESY…

Documents Proton Source Workshop December 7 & 8, 2010 John Reid December 8, 2010.

Slide 1 Proton Source Workshop December 7 & 8, 2010 John Reid December 8, 2010 Slide 2 Fermilab December 8, 2010J. Reid 2 Scope RF system description Booster Solid State…

Documents Radiation-protection experience at Belle / summary of beam abort system 22 September, 2003...

Slide 1 Radiation-protection experience at Belle / summary of beam abort system 22 September, 2003 T.Tsuboyama (KEK) Slide 2 Purpose of Beam abort system (1)Protection of…

Documents D-RATS

D-RATS Not Just for D-STAR radios Based on a presentation by Debbie Fligor, N9DN TCARC meeting 3/9/2010 Presented at 2011 Orlando Hamcation by: John Davis, WB4QDX Georgia…

Documents Improvements to the APS LINAC and SR/Booster klystron HVPS, and Accomplishments of the 352MHz RFTS.....

Improvements to the APS LINAC and SR/Booster klystron HVPS, and Accomplishments of the 352MHz RFTS G. Trento Accelerator Systems Division Argonne National Laboratory Work…

Documents Emergency Communications with D-RATS

Emergency Communications with D-RATS Dan Smith, KK7DS [email protected] Outline Data in an emergency Why D-STAR? D-RATS Features Chatting File transfers Forms Email Positional…

Documents Emergency Communications with D-RATS Dan Smith, KK7DS [email protected].

Emergency Communications with D-RATS Dan Smith, KK7DS [email protected] Outline Data in an emergency Why D-STAR? D-RATS Features Chatting File transfers Forms Email Positional…