1. Final Report – 4 November 2013 Framework for Sustainability-based Assessment for the Keeyask Hydro Project prepared by Kyrke Gaudreau and Robert B. Gibson for the Consumers…
EPA Environmental Impact Assessment Procedures for Projects KWESI OWUSU SEKYERE Outline of Presentation What is EIA Introduction to Ghana EIA Registration Screening Preliminary…
PUBLIC DISCLOSURE DOCUMENT PROPOSED BRUDERHEIM SULPHUR FORMING AND SHIPPING FACILITY (formerly referred to as the Bruderheim Sulphur Forming & Pastille Storage Facility)…
Slide 1 L O N G B E A C H, C A Slide 2 David B. Kessler, AICP Regional Environmental Protection Specialist Federal Aviation Administration – Western-Pacific Region Email:…
L O N G B E A C H , C A David B. Kessler, AICP Regional Environmental Protection Specialist Federal Aviation Administration â Western-Pacific Region Email: [email protected]…
G57 A meeting of the Board of Governors of the Federal Reserve SYstem was held in Washington on Wednesday, June 15, 1938, at 11:30 Et PRESENT: Mr. Eccles, Chairman Mr. Ransom,…