1. Project Summary Report Naval Inventory Control Point (NAVICP) Advanced Traceability and Control (ATAC) Passive RFID Enablement October 2007 1 Background Information 1.1…
1. Blake Lapthorn Green BreakfastSouthampton, 22nd May 2012 Paul Ciniglio - Sustainability Strategist, First Wessex 2. About First Wessex:• Hampshire and Surrey based HA•…
1. Suchada Ramakul, LEED AP BD+C 4400 Prospect Avenue, Los Angeles CA 90027 l Email: [email protected] l Tel: 310.800.6598 July 15, 2015 City of Los Angeles 700 East…
Engineering and design MONTHLY PROGRESS REPORT AL-HASSAN ENGINEERNG CO. SAOG PROJECT: AMAL POWER STATION (PDO CONTRACT NO: C-311333) Document No Rev No Date No. of `Pages…
Engineering and design MONTHLY PROGRESS REPORT AL-HASSAN ENGINEERNG CO. SAOG PROJECT: AMAL POWER STATION (PDO CONTRACT NO: C-311333) Document No Rev No Date No. of `Pages…
Slide 1 Prairie and Arctic Storm Prediction Centre Pat McCarthy & Steve Knott Program Supervisors Slide 2 PASPC Background Storm Prediction Centre split over two locations…