Slide 1©© 2013 SAP AG. All rights reserved. Scenario/Processes Marketing-to-Opportunity Scenario Overview Creating Target Group Creating and Executing Campaign Creating…
Copyright2009, Pipeline Simulation Interest Group andSolar Turbines Incorporated ThispaperwaspreparedforpresentationatthePSIGAnnualMeetingheldinGalveston, Texas, May 12 -…
Copyright© 2015 by Turbomachinery Laboratory, Texas A&M Engineering Experiment Station TUTORIAL: TRANSIENT MODELING AND ANALYSIS OF CENTRIFUGAL COMPRESSORS Augusto…
© Copyright 2004, Pipeline Simulation Interest Group This paper was prepared for presentation at the PSIG Annual Meeting held in Palm Springs, California, 20 October –…
ABSTRACT The 24 inch MEDGAZ high pressure deepwater pipeline runs for 210 km along the seabed of the Mediterranean Sea, transporting natural gas from the Beni Saf Compressor…
Full-scale Multiphase Flow Tests