Slide 1D11.2 – The Story Each test operator will test the system in different corridors in Europe. CP use one corridor, PI use another corridor, SIGMA has got two different…
D11.2 â The Story Each test operator will test the system in different âcorridorsâ in Europe. CP use one âcorridorâ, PI use another âcorridorâ, SIGMA has got two different…