DOCUMENT RESOURCES FOR EVERYONE
Documents tagged
Documents CERN-96-02 Cyclotrons, Linacs and Their Applications-033-142

INTRODUCTION TO RF LINEAR ACCELERATORS (LINACS)1) P.M. Lapostolle Abstract The history of linear accelerators is now more than 50 years old and after a difficult start presented…

Documents SPEAR 3 Beam Stability and Stabilization R. Hettel NSLS-II Stability Workshop April 18-20, 2007.

Slide 1 SPEAR 3 Beam Stability and Stabilization R. Hettel NSLS-II Stability Workshop April 18-20, 2007 Slide 2 R. Hettel SPEAR 3 Orbit Stability and Stabilization NSLS-II…

Documents A d v a n c e d L i g h t S o u r c e 1 April 18-20, 2007Christoph Steier, NSLS-II workshop...

Slide 1 A d v a n c e d L i g h t S o u r c e 1 April 18-20, 2007Christoph Steier, NSLS-II workshop Stability Issues at the ALS Christoph Steier ALS Accelerator Physics Group…

Documents Problems setting-up the ALBA FOFB Problems setting-up the ALBA FOFB DEELS14 12-13May - ESRF Angel...

Problems setting-up the ALBA FOFB DEELS14 12-13May - ESRF Angel Olmos ALBA FOFB Overview Latest Results Problems of Data Transfer on cPCI Setting the PI loop (No) Correction…

Documents Status of the LHC

FGC Software Design Review Status of the LHC Mike Lamont for the LHC team Commissioning progress 2 8.9.2010 LHC status 2010 8.9.2010 3 Hardware commissioning for 3.5 TeV…

Documents Last 24h

FGC Software Design Review Last 24h RP alignment for TOTEM and ALFA All H for TOTEM, all but one for ALFA aligned Dumped by octupole trip during test with octupoles RP control…