DOCUMENT RESOURCES FOR EVERYONE
Documents tagged
News & Politics DRAFT Downtown Saint Paul Station Area Plan

1.DRAFT Downtown Saint Paul Station Area Plan JUNE 23, 2009 2. Table of Contents1.0 Introduction1 1.1 The Opportunity 21.2 The Station Area Plan 41.3 The Alignment 61.4 The…

Documents A134.01 Building Area: (sf) 60,000 Cost per Square Foot: $275 Construction Cost $16.5 M Date of...

Slide 1A134.01 Building Area: (sf) 60,000 Cost per Square Foot: $275 Construction Cost $16.5 M Date of Substantial Completion: 2009 Location of Project: University of Puerto…

Documents Hilltop Village Center

Hilltop Village Center Telegraph Road and Buelah Road • Alexandria, VA AVAILABLE OUTPARCEL 3.149 acres TELEGRAPH ROAD BE U LA H S TR EE T CLEMALINE BOULEVARD H IL LT O…