DOCUMENT RESOURCES FOR EVERYONE
Documents tagged
Documents Accelerator R&D FFAGs........EMMA, PAMELA, ADSR, etc Target studies.........neutrons for BNCT, ADSR,...

Slide 1Accelerator R&D FFAGs........EMMA, PAMELA, ADSR, etc Target studies.........neutrons for BNCT, ADSR, security, etc Slide 2 NS FFAGs NS FFAGs Non-Scaling Fixed…

Documents Greening for Bosons Thomas Parker Head of Energy Division European Spallation Source The 55th ICFA.....

Slide 1 Greening for Bosons Thomas Parker Head of Energy Division European Spallation Source The 55th ICFA Advanced Beam Dynamics Workshop on High Luminosity Circular e+e-…

Documents Berkeley Sensor & Actuator Center Smart dust Active Laser Transmitter (SALT) Matthew Last, Kris...

Slide 1 Berkeley Sensor & Actuator Center Smart dust Active Laser Transmitter (SALT) Matthew Last, Kris Pister Berkeley Sensor and Actuator Center http://www.eecs.berkeley.edu/~mattlast…

Documents ESS Pre- Operations Dave McGinnis Accelerator Division/RF Group.

Slide 1 ESS Pre- Operations Dave McGinnis Accelerator Division/RF Group Slide 2 Pre-Operations (my definition) Starts when we try to accelerate one proton down the beam tube…

Documents 1/12 A. Luchetta 17 th Real-Time Conference, 25 May 2010, Lisboa, Portugal. Data Acquisition in the....

Slide 1 1/12 A. Luchetta 17 th Real-Time Conference, 25 May 2010, Lisboa, Portugal. Data Acquisition in the ITER Ion Source Experiment Adriano Luchetta, Gabriele Manduchi,…

Documents EUROnu and NF-IDS Target Meeting, CERN, 22-25 March 2008 Progress on Solid Target Studies J. R. J......

Slide 1 EUROnu and NF-IDS Target Meeting, CERN, 22-25 March 2008 Progress on Solid Target Studies J. R. J. Bennett 1, G. Skoro 2, J. Back 3, S. Brooks 1, R. Brownsword 1,…

Documents Status of T2K Tokai to Kamioka Neutrino Project at J-PARC June 21, 2004 Koichiro Nishikawa Kyoto...

Slide 1 Status of T2K Tokai to Kamioka Neutrino Project at J-PARC June 21, 2004 Koichiro Nishikawa Kyoto University Slide 2  beam of < 1GeV Kamioka J-PARC (Tokai-village)…

Documents PPS and BCS Requirements for LCLS-II (Baseline) Stan Mao 06/10/2015.

Slide 1 PPS and BCS Requirements for LCLS-II (Baseline) Stan Mao 06/10/2015 Slide 2 2 Outline D10 ST61, ST60, D2 MUON shielding  SLAC Radiation Safety System  LCLS-II…

Documents S.Kopp: NuFact ’02, Imperial College, London 1 The NuMI Neutrino Beam I. Status of 0.4MW Beam II.....

Slide 1 S.Kopp: NuFact ’02, Imperial College, London 1 The NuMI Neutrino Beam I. Status of 0.4MW Beam II. Potential for 1.6MW II. What’s it Good For? Sacha E. Kopp, University…

Documents Alexander Mikhailichenko, Cornell University, LEPP, Ithaca, NY 14853, John Hauptman, Shewook Lee,...

Slide 1 Alexander Mikhailichenko, Cornell University, LEPP, Ithaca, NY 14853, John Hauptman, Shewook Lee, Iowa University For the 4 th -Concept team http://physics.uoregon.edu/~lc/wwstudy/concepts/…