CHENNAI METRO RAIL PROJECT TRACTION / SUBSTATIONS AEP - 01 PRE ± BID MEETING th AUGUST 2010 09 5/07/2010 1 AEP - 01 CONTENTS PROJECT KEY DATA SCOPE OF THE CONTRACT RECEIVING…
Introduction to Leased Line Covering a detail study of types of Leased Lines and IPLC Leased Line Definition: A leased line connects two locations for private voice and/or…
1. 7 Tools to keep your Mac Healthy By TOPS Technologies..http://www.tops-int.com/live-project-training-iphone.html 2. • For the four years I’ve been using a Mac, I haven’t…
Slide 1OLIF2 Consortium: Organizational Meeting April 6, 2000 SAP AG Walldorf, Germany Slide 2 Agenda 9.00 – 9.15Welcome and introductory Remarks: Daniel Grasmick 9.15…
Slide 1Maintenance Planning and Control : Modeling and Analysis w Slides on chapter 1 Slide 2 Lecture 1 OBJECTIVE 1.Enable Students To Understand The Role of Maintenance…
Timken Industrial Seal Catalog High Performance Seals • Large Bore Assembled Seals • Bearing Isolators Technical Manual Introduction At Timken, customers turn to us to…
1. ®OptiFiber Pro OTDRBuilt for the enterpriseAs enterprise networks and data center Designed for enterprise fiberarchitectures evolve, IT infrastructureMany OTDRs…