19 Contents 1. Foreword 1 2. Common accidents in lifting operations 2 3. Legislative requirements and code of practice of lifting operations 2 4. People 3 5. Machinery 5…
Published in September 2011 by the Workplace Safety and Health Council in collaboration with the Ministry of Manpower. All rights reserved. This publication may not be reproduced…
Published in September 2011 by the Workplace Safety and Health Council in collaboration with the Ministry of Manpower. All rights reserved. This publication may not be reproduced…
Worker’s Safety Handbook for Rigger and Signalman Contents Preface Proper Attire for Rigger and Signalman Roles and Responsibilities of a Rigger Good and Bad Rigging Practices…
Indian Standard SPECIFICATION FdR POINT HOOKS WITH SHANK FOR GENERAL ENGINEERING PURPOSES Lifting Chains and Associated Fittings and Components Sectional Committee, EDC 49…
TOTAL NO. OF SHEET ( 1 ) 1/26 2 TPOT DAMIR GLAVAN TPOT 4 CHOPRA ITEM DWG. NO. REV NO B SC LEE 15/03/2008 A PJ DING 04/03/2008 REV. NO REVISED BY REV. DATE QA/QC 1 ZULAIHA…
TATA PROJECTS LIMITED CAIRN ENERGY INDIA PTY LIMITED MANGALA ASSOCIATED FACILITIES PROJECT (EPC-1) METHOD STATEMENT FOR SETTLING TANK ERECTION USING JACK LIFTING METHOD CAIRN…