Slide 1Micron detector testing in Liverpool G. Casse – O. Lodge Laboratory, University of Liverpool Slide 2 Micron detector testing in Liverpool 5/21/02 LHCb week G. Casse…
Slide 1New Chambers for M23R12 for the Muon Upgrade Alessandro Cardini INFN Cagliari Slide 2 Requirements: from TDR Numbers from Giacomo’s extrapolation of current rates…
Slide 1 Laboratoire de l’Accélérateur Linéaire (IN2P3-CNRS) Orsay, France 24 February 2003 News about SPECS system SPECS system SPECS-SLAVE chip SPECS-SLAVE…
Ageing History 2005 Niels, Gras, Eduard & Sebastian 18 January 2006 I: Module 002: Setup One 5 m OT modules Gas : Ar/CO2 70/30 LHCb Week at CERN, wednesday 8 June 2005.…
Status of the LLTT(TPU) project G.Punzi (Pisa) on behalf of the LLTT group Meeting with INFN referees 20/3/2014 Brief recap - Feb. 2013: LHCb Trigger workshop: First LHCb…
Status of the LLTT(TPU) project G.Punzi (Pisa) on behalf of the LLTT group Meeting with INFN referees 20/3/2014 Brief recap - Feb. 2013: LHCb Trigger workshop: First LHCb…
Deferred HLT LHCb ideas and path toward vectorization and parallelization Niko Neufeld CERN, Wednesday, Nov 28th 2012 Fourth International Workshop for Future Challenges…
Ageing History 2005 Niels, Gras, Eduard & Sebastian 18 January 2006 I: Module 002: Setup One 5 m OT modules Gas : Ar/CO2 70/30 LHCb Week at CERN, wednesday 8 June 2005.…
A new concept for the RICH upgrade TRID(ENT) studies TRID “Twin Ring Imaging Detector” proposed for upgrade of RICH system instead of maintaining existing RICH-1 and…