DOCUMENT RESOURCES FOR EVERYONE
Documents tagged
Documents Jet Slice Status Report Ricardo Gonçalo (LIP) and David Miller (Chicago) For the Jet Trigger Group....

Slide 1Jet Slice Status Report Ricardo Gonçalo (LIP) and David Miller (Chicago) For the Jet Trigger Group Trigger General Meeting – 9 July 2014 Slide 2 Outlook Ongoing…

Documents Readout of the ATLAS Liquid Argon Calorimeters John Parsons Nevis Labs, Columbia University...

Slide 1 Readout of the ATLAS Liquid Argon Calorimeters John Parsons Nevis Labs, Columbia University Representing the ATLAS LAr Collaboration ATLAS Slide 2 J. Parsons, Siena,…

Documents 1 SLAC BaBar Program Blair Ratcliff SLAC BaBar Program Manager June 2004.

Slide 1 1 SLAC BaBar Program Blair Ratcliff SLAC BaBar Program Manager June 2004 Slide 2 2 Elements of SLAC BaBar Program Computing operations/infrastructure (Richard; Rainer)…

Documents LAr Frontend Board PRR Introduction 1.Overview of FEB functionality 2.FEB performance requirements.....

Slide 1 LAr Frontend Board PRR Introduction 1.Overview of FEB functionality 2.FEB performance requirements 3.Development and evaluation of FEB 4.Organization of FEB PRR presentations…

Documents Activité LPNHE en 2012 et 2013

Slide 1 Activité LPNHE en 2012 et 2013 G.Calderini Tracker upgrade IBL Phase-0 Simulations of sensors and evaluation productions (during the last few years, now over for…

Documents SLAC BaBar Program

SLAC BaBar Program Blair Ratcliff SLAC BaBar Program Manager June 2004 Elements of SLAC BaBar Program Computing operations/infrastructure (Richard; Rainer) Detector Operations…

Documents ATLAS

Readout of the ATLAS Liquid Argon Calorimeters John Parsons Nevis Labs, Columbia University Representing the ATLAS LAr Collaboration ATLAS C. de La Taille 7th conference…

Documents Trigger Software Upgrades John Baines & Tomasz Bold 1.

Power & Cooling Trigger Software Upgrades John Baines & Tomasz Bold 1 Introduction High Level Trigger Challenges: Faster than linear scaling of execution times with…

Documents Detector R&D: Belle DAQ System

Belle DAQ Overview detector frontend detector frontend detector frontend detector frontend … trigger decision system clock Main coverage by “DAQ” Data flow: signal…

Documents Overview

Overview BABAR L1 DCT Upgrade FDR Masahiro Morii Harvard University Scope of the Project Current Status Schedule  Commissioning Masahiro Morii DCT Upgrade – Motivation…