Master in Petroleum Engineering 2007-2008 Definition, calculation and analysis of results for the application in well design, drilling and well control operations. Choke…
Master in Petroleum Engineering 2007-2008 Definition, calculation and analysis of results for the application in well design, drilling and well control operations. Choke…
Well Engineering and Production Operations Management System Casing Design Manual Approved by: WEPO – Well Engineering Manager Signed ______________________________ Date…
Name REV 9 5/8" liner hoyo HOLE S 6617.00 Diameter Length 217.380 168.240 203.200 Name 6617.000 top TP 2 HW 370.000 3 DC 4 5 6 Surveys based TVD calculation 7 Auto depth…